Drawing for OPTIMET

USPTO serial 79112267

OPTIMET

Reviewed by CopyMark Law Group

Reg. 4582149Status 709
Filing date
Status date
Registration date
Aug 12, 2014
Examiner
GALAN, MATTHEW
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with OPTIMET?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew J. Patch

Andrew J. Patch YOUNG & THOMPSON209 MADISON ST., STE. 500ALEXANDRIA, VA 22314UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electric apparatus and instruments, namely, reflectors, for wear, for the prevention of traffic accidents; satellite navigation apparatus namely, global positioning systems; navigation apparatus for vehicles, in the nature of on-board computers; hands-free kits for telephones; automatic steering control apparatus for vehicles, namely, computer software and hardware for controlling an automatic steering apparatus for vehicles; vehicle radios; voltage regulators for vehicles; simulators for the steering or control of vehicles; thermostats for vehicles; mileage recorders for vehicles; speed indicators; personal security alarms, passenger information alarms; batteries for lighting; electric batteries; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; electronic and electrical apparatus for issuing and validating travel documents, namely, printers and scanners; electric door openers; electric installations for the remote control of industrial operations; electric control panels; magnets; blank sound recording disks; computer software for the design, production, installation, operation and maintenance of transport by rail and urban and suburban transport systems; computer programs for the design, production, installation, operation and maintenance of transport by rail and urban and suburban transport systemsSECTION 71 - CANCELLED—
012Land vehicles for the transport of passengers and travelers; apparatus for locomotion by land, namely, automobiles, trains, rail vehicles, underground rail vehicles, tramcars and land vehicles; rolling stock for railways, and spare parts therefor, namely, inner tubes for pneumatic tires, suspension shock absorbers for vehicles, shock absorbers for vehicles; non-skid devices, namely, chains, studs, for vehicle tires; anti-dazzle devices for vehicles namely, vehicle reflectors; antitheft devices for vehicles; head-rests for vehicle seats; transmission shafts for land vehicles; railway couplings; anti-theft alarms for vehicles; reversing alarms for vehicles; horns for vehicles; tires for vehicle wheels; flanges for railway wheel tires; valves for vehicle tires; treads for retreading tires; land vehicle suspension parts, namely, torsion bars; connecting rods for land vehicles, other than parts of motors and engines; spark plugs for railway cars; transmissions for land vehicles; land vehicles parts, namely, fenders, windshields and mudguards; caissons; hoods for vehicles; hoods for vehicle engines; crankcases for land vehicle components other than for motors and engines; safety belts for vehicles; anti-skid chains for vehicles; driving chains for land vehicles; transmission chains for land vehicles; inner tube repair kits consisting primarily of patches; structural parts for locomotives, namely, funnels; rolling stock for railways; treads for retreading tractor tires; buffers for use in coupling railway rolling stock; hydraulic circuits for vehicles; anti-skid spikes for vehicle tires; driving chains for land vehicles; torque converters for land vehicles; sleeping berths for vehicles; air bags; structural parts for railway cars, namely, tipping apparatus; reduction gears for land vehicles; turn signals for vehicles; hand cars; electric motors for land vehicles; clutches for land vehicles; gearing for land vehicles; hub caps; casings for pneumatic tires; balance weights for vehicle wheels; land vehicle parts, namely, axles and axle journals; windshield wipers; brakes for vehicles; brake linings for vehicles; brake shoes for vehicles; brake segments for vehicles; brake fittings for vehicles, namely, air compressors, air valves, blocks, calipers, cylinders, discs, disks, drums, facings, hardware, lines, linings, pads, rotors, segments, shoes, and systems; direction signals for vehicles; locomotives; tires; doors for vehicles; jet engines for land vehicles; rearview mirrors; windows for vehiclesSECTION 71 - CANCELLED—
035Business organization and management assistance and advice in connection with transport by rail or public transport; market studies and research in connection with transport by rail or public transport; organization of exhibitions for commercial or advertising purposes in connection with transport by rail or public transportSECTION 71 - CANCELLED—
036Financial advice and analysis; financing of projects, installations and equipment in connection with transport by rail or public transportSECTION 71 - CANCELLED—
037Construction of railway or public transport infrastructure; providing information on building railway or public transport infrastructure; supervision of building work in connection with railway or public transport infrastructure; demolition of railway or public transport infrastructure; cleaning or servicing of railway and public transport vehicles; installation, servicing and repair of railway and public transport infrastructureSECTION 71 - CANCELLED—
038Telecommunications and communication services, namely, the electronic, radio, fiber optic, internet and satellite transmission of data in connection with transport by rail and public transport; rental of access time to a computer network for data handling, data retrieval and data processingSECTION 71 - CANCELLED—
039Transportation of passengers and travelers by rail and public land vehicles; transportation of passengers and travelers by rail and public land vehicles, namely, the operation, automation and signaling of rail and public transport land systems; Consulting in the field of rail transportation services and public vehicle transportation, namely, analysis and advice in connection with rail and public transport for passengers and travelers; providing information on rail and public transport for passengers and travelers; secure transportation of passengers and travelers by rail or public bus; professional consulting in connection with rail and public transportSECTION 71 - CANCELLED—
041Vocational education and vocational training in the field of rail and public transportationSECTION 71 - CANCELLED—
042Engineering, especially in connection with rail and public transport, scientific and technological services and research and design relating thereto, namely, evaluations, estimates and research in the fields of science and technology provided by engineers, especially in connection with rail and public transport; research and development of new products, especially in connection with rail and public transport; design and development of computers and software; recovery of computer databases; quality control, especially in connection with rail and public transport; computer software design; technical project studies in the field of rail and public transport; project studies related to planning, architecture and city planning in the field of rail and public transport; project studies related to construction in the field of rail and public transport; consulting services, namely, providing technical assistance and studies related to project management in the field of rail and public transport; surveying services in connection with rail and public transport; updating of computer software; rental of computer software; maintenance of computer software; urban planning; development of data servers over computer networks; design, installation and updating of software in connection with computer ticketing; design of computer systems in connection with computer ticketing; architectural services; architectural and engineering studies and analysis related to construction and renovation in connection with rail and public transport; architectural and engineering advice on construction in connection with rail and public transport, construction drafting in connection with rail and public transport, civil engineering in connection with rail and public transport; engineering services in connection with rail and public transport; technical research in connection with rail and public transport; professional consulting unrelated to business dealings in the field of engineering, in connection with rail and public transportSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 22, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 22, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 22, 2021INPCINVALIDATION PROCESSED—
Nov 5, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Nov 3, 2021LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 23, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Feb 26, 2021C71TCANCELLED SECTION 71—
Oct 9, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 12, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 21, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 5, 2015CORVREVIEW OF CORRESPONDENCE COMPLETE - INFORMATION MADE OF RECORD—
Aug 4, 2015EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Dec 19, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 18, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 18, 2014FIMPFINAL DISPOSITION PROCESSED—
Nov 12, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 12, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 29, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 27, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 27, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 23, 2014GPNXNOTIFICATION PROCESSED BY IB—
May 14, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 14, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 7, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 7, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 7, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 24, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 15, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 15, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Apr 15, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 15, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 15, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 10, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 3, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 17, 2014PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Mar 6, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 6, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 6, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Mar 6, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 6, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 6, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 6, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 3, 2014PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 18, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 18, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 24, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 24, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 24, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 1, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 1, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 1, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 11, 2013RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jul 11, 2013ALIEASSIGNED TO LIE—
Jan 10, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 10, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Jan 10, 2013CNSLSUSPENSION LETTER WRITTEN—
Dec 18, 2012CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
Dec 14, 2012RINXUSPTO CORRECTION PROCESSED BY IB—
Dec 14, 2012CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Dec 5, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 5, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 5, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 4, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 4, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 25, 2012RFNTREFUSAL PROCESSED BY IB—
Jun 5, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 5, 2012RFRRREFUSAL PROCESSED BY MPU—
Jun 5, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 4, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
May 18, 2012DOCKASSIGNED TO EXAMINER—
May 18, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 17, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance