Drawing for JURONG SHIPYARD

USPTO serial 79112368

JURONG SHIPYARD

Reviewed by CopyMark Law Group

Reg. 4437869Status 404
Filing date
Status date
Registration date
Nov 26, 2013
Examiner
BRECKENFELD, WILLIAM G
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with JURONG SHIPYARD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Grace Han Stanton

Grace Han Stanton Perkins Coie LLP1201 Third Avenue, Suite 4900Seattle, WA 98101UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction of offshore rigs and ships; general contracting services in the field of marine construction, shipbuilding and offshore drilling; construction of environmentally-conscious buildings; marine construction; construction management services; installation, maintenance and repair of offshore rigs and ships; cleaning of ships; construction, fabrication in the nature of construction and repair of offshore production and/or storage facilities, drilling rigs, ships, barges and all types of vessels; construction, installation, maintenance, repair, servicing of electricity generation, transmission and distribution apparatus and instruments; construction, installation, relating to offshore and marine vessels, ships and structures; information related to marine construction and construction of offshore rigs and ships; providing information related to the repair of ships; on site and offshore project management and refurbishment relating to shipbuilding, dry docking, afloat repairs and voyage repairs, underwater construction and repairs, painting, major modifications and conversion of vessels; on site and offshore project management and refurbishment relating to the construction of facilities; on site and offshore project management and refurbishment relating to the construction, fabrication in the nature of construction and repair of all types of vessels, offshore storage and/or production facilities, drilling rigs, ships, barges and other specialized vessels; construction of steel structures and industrial equipment and plant; shipbuilding, namely, reparative dry docking, afloat repairs and voyage repairs, underwater construction and repairs, painting, major modifications and conversion of ships, barges and all types of vessels, offshore storage and/or production facilities and drilling rigs; construction, installation and erection of ships, barges, vessels, offshore storage and/or production facilities, structures and drilling rigs; rental of construction and building equipment, namely, automation, instrumentation and control systems construction and construction management of industrial and infrastructural plants in environmental business; installation, repair and maintenance of ships; ship building; construction of ships; inspection services in the course of construction of ships, vessels, barges, offshore storage and/or production facilities and drilling rigs; cleaning of ships, all types of vessels, barges, offshore storage and/or production facilities, drilling rigs; sub-contracting services in relation to building construction, repair and installation services; underwater construction, cleaning and repairs of offshore rigs and ships; equipment maintenance services for energy related or energy using equipment; information, advisory and consultancy services relating to the aforesaid; installation of energy consumption reducing equipment; installation of environmental engineering systems; installation, repair and servicing automation, instrumentation and control systems; janitorial services; maintenance and repair of infrastructural plants in environmental business; maintenance, repair and cleaning of building, industrial plants and transportation equipment; marine engineering; marine lifting services for construction purposes; appliance repair services; boiler cleaning and repair; building construction; building construction supervision; building maintenance; rental of cleaning machines; rental of construction equipment; rental of construction equipment and machines; rental of lifting apparatus for construction purposes; rental of marine building materials, equipment and products; rental of material handling equipment for construction purposes; rental of heavy cranes and lifting and hoisting equipment for construction purposes; repair, maintenance and servicing of in this classSECTION 71 - CANCELLED—
039Sea transport; transport brokerage; transportation information; Packaging articles for transportation; storage of goods; marine towing; provision of tug boat services and marine towage; heavy lifting, hoisting and cranage services for loading and unloading purposes; harbor crane unloading; marine lifting services using floating cranes; marine transport, lighterage; hire or rental of ships or vessels, rental of storage containers; shipbrokerage; information advisory and consultancy services relating to the aforesaidSECTION 71 - CANCELLED—
042Scientific and technological services and research and design relating thereto; industrial analysis and research services in the field of marine construction, ship building, and offshore drilling; mechanical research; technical research in the field of marine construction, ship building, and offshore drilling; research and development in engineering and construction; industrial design; design development and installation of software; naval architecture services; naval architecture consultation; provision of engineering project development and engineering project management services; engineering; engineering services; engineering feasibility studies; engineering design and construction drafting; preparation of engineering drawings and reports; engineering project management services; engineering services relating to data processing engineering technology; quality control for others; material testing; testing or research on machines, apparatus and instruments for underwater construction; industrial testing of engineering works; commissioning and inspection of plant, machinery and apparatus; inspection of plants and machinery; information, advisory and consultancy services relating to the aforesaidSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 26, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Mar 26, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 22, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 22, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 22, 2021INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Nov 26, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 13, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 13, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Feb 27, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 27, 2014FIMPFINAL DISPOSITION PROCESSED—
Feb 26, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 26, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 15, 2013GPNXNOTIFICATION PROCESSED BY IB—
Sep 10, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 10, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 28, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 28, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 21, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 5, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 5, 2013ALIEASSIGNED TO LIE—
Jul 23, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 23, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Jul 23, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 23, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 23, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 15, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 15, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 24, 2013CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 17, 2013NREVNOTICE OF REVIVAL - MAILED—
Jan 16, 2013PETGPETITION TO REVIVE-GRANTED—
Jan 16, 2013PROATEAS PETITION TO REVIVE RECEIVED—
Jan 3, 2013MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 2, 2013ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 15, 2012RFNTREFUSAL PROCESSED BY IB—
May 25, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 25, 2012RFRRREFUSAL PROCESSED BY MPU—
May 25, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 24, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
May 18, 2012DOCKASSIGNED TO EXAMINER—
May 18, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 17, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance