Drawing for METROLAB

USPTO serial 79112435

METROLAB

Reviewed by CopyMark Law Group

Reg. 4492911Status 709
Filing date
Status date
Registration date
Mar 11, 2014
Examiner
VOHRA, SANJEEV KUMAR
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with METROLAB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew J. Patch

Andrew J. Patch YOUNG & THOMPSON209 MADISON ST., STE. 500ALEXANDRIA, VA 22314UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electric apparatus and instruments, namely, reflectors, for wear, for the prevention of traffic accidents; sound alarms; distance measuring apparatus; satellite navigation apparatus, namely, global positioning systems; navigation apparatus for vehicles, in the nature of on-board computers; automatic steering control apparatus for vehicles; vehicle radios; voltage regulators for vehicles; simulators for the steering or control of vehicles; thermostats for vehicles; mileage recorders for vehicles; speed indicators; signaling alarms, personal security alarms, passenger information alarms; batteries for lighting; electric batteries; speed checking apparatus for vehicles; electric voltage, current and power loss indicators; time recording apparatus; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, computer peripherals; computer and photo printers for printing travel documents; scanners for use in issuing and validating travel documents; apparatus for recording, transmission or reproduction of sound or images, namely, audio and digital video recorders and wireless, radio and electronic transmitters and receivers for the operation of rail, urban and suburban transportation systems; Electronic monitors for monitoring safe functioning of passenger trains, passenger subway trains, and bus systems; converters; luminous or mechanical signaling panels, namely, electric signs; electronic signaling mechanism, namely, a train control system used in the railway industry for detecting and controlling trains, ground faults, broken rails, power failures, track switches and lights; electric door openers; electric installations for the remote control of industrial operations in the field of bus and rail transport; electric control panels; magnets; blank sound recording disks. data processing equipment and computers; computer software for the design, production, installation, operation and maintenance of transport by rail and urban and suburban transport systems; computer programs for the design, production, installation, operation and maintenance of transport by rail and urban and suburban transport systems, all the foregoing being in the nature of specialized goods/services for the rail and public transport industrySECTION 71 - CANCELLED—
035Business organization and management assistance and advice in connection with transport by rail or public transport; market studies and research in connection with transport by rail or public transport; organization of exhibitions for commercial or advertising purposes in connection with transport by rail or public transportSECTION 71 - CANCELLED—
036Financial advice and analysis; financing of projects, installations and equipment in connection with transport by rail or public transportSECTION 71 - CANCELLED—
037Construction of railway or public transport infrastructure; providing information on building railway or public transport infrastructure; supervision of building work in connection with railway or public transport infrastructure; demolition of railway or public transport infrastructure; cleaning or servicing of railway and public transport vehicles; installation, servicing and repair of railway and public transport infrastructureSECTION 71 - CANCELLED—
038Telecommunications services, namely, electronic transmission of data in the field of train, bus and subway train traffic control; rental of access time to global computer networks for data handling, data retrieval and data processing, all the foregoing being in the nature of specialized goods/services for the rail and public transport industrySECTION 71 - CANCELLED—
039Passenger train transport; subway passenger train transport; bus transport; Transportation consulting services in the field of bus and rail transport; Transportation consulting services in the field of bus and rail transport, namely, providing information on rail and bus transport for passengers and travelersSECTION 71 - CANCELLED—
041Vocational education and vocational training in the field of rail and public transportationSECTION 71 - CANCELLED—
042Engineering services in the field of rail and public transport, scientific and technological services and research and design relating thereto, namely, evaluations, estimates and research in the fields of science and technology provided by engineers in connection with rail and public transport; research and development in the field of rail and public transport; design and development of computers and software; recovery of computer databases; quality control in connection with rail and public transport; computer software design; technical project studies in the field of rail and public transport; project studies related to planning, architecture and city planning in the field of rail and public transport; project studies related to construction in the field of rail and public transport; consulting services, namely, providing technical assistance and studies related to project management in the field of rail and public transport; surveying services in connection with rail and public transport; updating of computer software; rental of computer software; maintenance of computer software; urban planning; development of data servers over computer networks; design, installation and updating of software in connection with computer ticketing; design of computer systems in connection with computer ticketing; architectural services; Consulting in the fields of engineering and architecture, namely, consultation related to construction and renovation of public rail and bus transport systems; construction drafting in connection with rail and public transport, civil engineering in connection with rail and public transport; engineering services in connection with rail and public transport; technical research in connection with rail and public transportSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 22, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 22, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 22, 2021INPCINVALIDATION PROCESSED—
Nov 5, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Nov 3, 2021LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 23, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Oct 21, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Mar 11, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 8, 2018LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 11, 2018LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Dec 21, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 5, 2015CORVREVIEW OF CORRESPONDENCE COMPLETE - INFORMATION MADE OF RECORD—
Aug 4, 2015EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Jul 22, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 12, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 12, 2014FIMPFINAL DISPOSITION PROCESSED—
Jun 11, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 11, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 24, 2014ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Jan 23, 2014CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Jan 9, 2014APETASSIGNED TO PETITION STAFF—
Dec 23, 2013EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Oct 7, 2013ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Sep 15, 2013GPNXNOTIFICATION PROCESSED BY IB—
Sep 10, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 10, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 28, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 28, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 21, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 2, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 26, 2013ALIEASSIGNED TO LIE—
Jul 10, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 19, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 19, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 19, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 26, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 26, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 26, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 5, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 5, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 4, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 4, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 25, 2012RFNTREFUSAL PROCESSED BY IB—
Jun 6, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 6, 2012RFRRREFUSAL PROCESSED BY MPU—
Jun 6, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 5, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
May 29, 2012DOCKASSIGNED TO EXAMINER—
May 29, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 24, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance