USPTO serial 79112788
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
CH-4601 Olten, CH
CH-4601 Olten, CH
CH-4601 Olten, CH
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Charles Gorenstein
Charles Gorenstein Birch, Stewart, Kolasch & Birch, LLP8110 Gatehouse Road, Suite 100 EastFalls Church, VA 22042UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Ducts of metal and duct tubes of metal for central heating installations, air conditioning installations and ventilating installations, plated flexible pipes of metal, valves and slide valves of metal not being parts of machines, faucets of metal, pipes for fountains, gargoyles and statuettes for ponds, of metal; metal pipe fittings for rigid pipes, splitters for metal pipes, with or without valves; * all the aforesaid goods only in the field of plumbing and heating construction * | SECTION 71 - CANCELLED | — |
| 011 | Sanitary, heating and laboratory faucets; sanitary apparatus, namely, water filtration and purification units and replacement cartridges and filters therefor; water distribution apparatus, namely, pipes being part of sanitary facilities, pipes for heating boilers, mixer faucets for water pipes, regulating accessories for water or gas apparatus and pipes, valves, valves for the prevention of backflow, baffles, cocks, spouts, drains, drains for laboratory extraction chambers, couplers, tub control valves, shower control valves, flexible pipes being parts of basin, bath, shower or sink plumbing installations; installations of central heating pipeworks and pipe networks, in particular between the boiler and the various stories with outward and return pipes, as well as splitters for each story with outward and return pipes; filters, particularly water filters, filters for drinking water, faucet filters and fine filters for supply water; blocking/security fittings for water heaters, namely, valves, control valves; plumbing fittings, namely, mixers for liquids and gases; water jet pumps supplied as parts of a sanitary installation; eye-washes as parts of sanitary installations and laboratory sprays supplied as parts of sanitary installations | SECTION 71 - CANCELLED | — |
| 017 | Packing and insulating materials, stopping materials, namely, waterproof packings for construction, insulating waterproofing membranes, non-metallic hoses and flexible pipes, namely, hoses made of plastic, plastic flexible pipes for connections, tubes and tube couplings of plastic for connecting pipes for plumbing purposes; protective non-metal pipe collars; * all the aforesaid goods only in the field of plumbing and heating construction * | SECTION 71 - CANCELLED | — |
| 019 | Pipeworks and protective pipes, not of metal, namely, of plastic for use as building materials; * all the aforesaid goods only in the field of plumbing and heating construction * | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 26, 2022 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 26, 2022 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 16, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 3, 2020 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 3, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jun 3, 2020 | INPC | INVALIDATION PROCESSED | — |
| Apr 9, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 9, 2019 | C71T | CANCELLED SECTION 71 | — |
| Jul 17, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 8, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 15, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 2, 2015 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Sep 16, 2014 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 16, 2014 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Jan 16, 2014 | PLGL | ASSIGNED TO PARALEGAL | — |
| Jan 16, 2014 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jan 16, 2014 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jan 16, 2014 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Jan 4, 2014 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jan 4, 2014 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Dec 23, 2013 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jun 2, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 3, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 3, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 8, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 8, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 1, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 23, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 23, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 3, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 3, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 3, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 14, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 14, 2012 | ALIE | ASSIGNED TO LIE | — |
| Sep 5, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 30, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 30, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 30, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 27, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 27, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 1, 2012 | RFNP | REFUSAL PROCESSED BY IB | — |
| Jun 12, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 8, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 8, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 7, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 6, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 6, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 5, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |