Drawing for SOLUGAS

USPTO serial 79113388

SOLUGAS

Reviewed by CopyMark Law Group

Reg. 4915880Status 404
Filing date
Status date
Registration date
Mar 15, 2016
Examiner
SETTLES LEWIS, SHAILA E
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SOLUGAS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007machine and machine tools both for constructing, installing and operating solar plants, namely, compressed air engines, compressed air machines, compressed air pumps, water pumps for use in motors and engines, gas-operated power generators, electricity generators, pressure regulators being parts of machines, back pressure valves as parts of machinesSECTION 71 - CANCELLED—
011Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary installations, namely, steam generators, fabric steamers, parabolic mirrors for the collection of solar energy, solar collectors, solar energy based cooling apparatus, solar energy receivers, solar heat collection panels, solar reactors, solar thermal air systems for heating purposes, namely, solar thermal modules, solar thermal based power plants, solar photovoltaic power plants, solar energy heaters, namely, solar energy based heating apparatus, solar powered cooling units, solar thermal energy collectors, solar heating boilers, solar heat exchangers, solar absorbers, solar energy receivers, solar selective layers for heating, namely, solar absorbent coaters, solar heat accumulators, solar heat storage equipment, namely, solar heat storage tanks for steam energy storing, heat pumpsSECTION 71 - CANCELLED—
037solar plant construction services; repair and installation of solar plants, particularly construction of industrial plants for energy productionSECTION 71 - CANCELLED—
040Treatment of materials, namely, cutting bulk photovoltaic materials into wafers; production of energySECTION 71 - CANCELLED—
042Scientific and technological services and related research and design services, namely, scientific research and development and product research and development in the field of solar energy and solar plants; industrial analysis and research services in the fields of solar energy technology and solar plants, namely, engineering services in the field of solar energy technology and solar plants; design and development of computer hardware and softwareSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 4, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Dec 4, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 30, 2022C71TCANCELLED SECTION 71—
Mar 15, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 21, 2018WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Sep 21, 2018WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Jul 28, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 13, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 13, 2016FIMPFINAL DISPOSITION PROCESSED—
Jun 15, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 15, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 4, 2016GPNXNOTIFICATION PROCESSED BY IB—
Dec 29, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 29, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 9, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 9, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 9, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 24, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 24, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 24, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Nov 24, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 24, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 24, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 5, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 5, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 5, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 5, 2015ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 14, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 7, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 7, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 7, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 20, 2015RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Oct 17, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jun 4, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 31, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Dec 14, 2013OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 28, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 27, 2013OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 30, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Mar 28, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 28, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Mar 28, 2013CNSLSUSPENSION LETTER WRITTEN—
Mar 7, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 7, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 27, 2013ALIEASSIGNED TO LIE—
Feb 27, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 23, 2012RFNTREFUSAL PROCESSED BY IB—
Aug 31, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 31, 2012RFRRREFUSAL PROCESSED BY MPU—
Aug 31, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 30, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2012DOCKASSIGNED TO EXAMINER—
Jul 3, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 27, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 22, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—