Drawing for G GREEN ENGINEERING

USPTO serial 79113663

G GREEN ENGINEERING

Reviewed by CopyMark Law Group

Reg. 4402110Status 404
Filing date
Status date
Registration date
Sep 17, 2013
Examiner
GLASSER, CARYN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with G GREEN ENGINEERING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thomas J. Moore

Thomas J. Moore BACON & THOMAS, PLLC625 Slaters Lane, Fourth FloorAlexandria, VA 22314-1176UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Valves, clack valves and faucets of plastic or metal as a machine component for hydraulic and pneumatic machines; electric, pneumatic and hydraulic drives for valves, namely, pneumatically or hydraulically actuated cylinders, as a machine partSECTION 71 - CANCELLED—
009Apparatuses and instruments for switching, regulating and controlling of electricity, namely, electric converters, electrical controllers, electric and electronic switches, electric and electronic closed loop and open loop control apparatus to be used to control catalytic converters; electric devices for the measuring- and regulating technique, namely, clamp meters for measuring electricity; devices for recording, transmitting and displaying of data, namely, computers; measuring- and monitoring devices, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals; armatures for use in electrical apparatus as parts of the devices for the measuring- and regulating technique; flow-measuring and flow-regulating devices, namely, flow meters, automatic liquid-flow control machines and instruments, sensors and transmitters for measuring, switching and proportioning liquid and gaseous media, namely, mass flow rate meters and flow regulators for commercial use as well as electronic pressure regulators for high pressure gases and liquids, except for regulators for gas, water or other sanitary installations; flow-sensors, namely, pressure sensors, fluid control sensors and level regulators, combinations of the aforesaid goods to form systems; pressure measuring devices and pressure regulating devices for hydraulic and pneumatic installations and electromagnetically actuated pilot valves, namely, pressure sensors, pressure meters, pressure regulators; scientific laboratory devices for the clinical field, namely, apparatus and instruments for the measurement and control of fluids, namely, flow meters; filters as parts of analysis-devices for laboratory purposes; electrical controlling devices for medical devices and instruments; electronic components, namely, integrated circuits chips for use in measuring the flow, pressure, filling level and/or temperature in regulators, control elements, valves and sensors; electronic components, namely, computer chips for use in the field of the drive-, control- and regulating-technique, including field bus technique and industrial communicationSECTION 71 - CANCELLED—
035Business organization and business administration consultation, in the field of environment protection, regenerative energy, energy conservation, climate change, waste prevention and sustainable development; procuring of contracts for the purchase and sale of goods; providing an on-line computer database in the field of business information and business contacts; business organization and administration relating to business contacts, in the field of environment protection, regenerative energy, waste prevention and sustainable development, with such service provided onlineSECTION 71 - CANCELLED—
042Scientific and technological services, namely, product research and design of new products in the field of energy conservation, regenerative energy; industrial research in the field of energy conservation; scientific research in the field of the environment protection; technical consultation in relation to research services in the fields of environment protection and energy efficiency conservation; scientific research and technical writing of technical and scientific documents for others; scientific research in the field of the sustainable use of nature and environment; scientific research, especially referring to environment protection, regenerative energy, energy conservation, climate change, waste prevention and sustainable developmentSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 30, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 30, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 15, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 22, 2021XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Dec 22, 2021XXCRGENERIC MADRID TRANSACTION CREATED—
Nov 27, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Feb 12, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 17, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 30, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 22, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 20, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 21, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 4, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 4, 2014FIMPFINAL DISPOSITION PROCESSED—
Dec 17, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 17, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 21, 2013GPNXNOTIFICATION PROCESSED BY IB—
Jul 2, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 2, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 19, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 19, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 12, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 29, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 29, 2013ALIEASSIGNED TO LIE—
May 15, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 11, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 10, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 10, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 31, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 31, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 31, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 4, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 4, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 29, 2012RFNTREFUSAL PROCESSED BY IB—
Aug 6, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 6, 2012RFRRREFUSAL PROCESSED BY MPU—
Aug 4, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 3, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 24, 2012DOCKASSIGNED TO EXAMINER—
Jul 4, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 30, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 28, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance