Drawing for A AVENOS

USPTO serial 79113877

A AVENOS

Reviewed by CopyMark Law Group

Status 401
Filing date
Status date
Registration date
Examiner
LAMONT, MIAH ROSENBERG
Law office
TMO LAW OFFICE 117

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with A AVENOS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Masts and towers of metal for wind power plants; building materials of metal for constructing of machine foundations of wind power plantsSECTION 70 - CANCELLED
007Wind-powered machines; turbines, in particular wind turbines (except for land vehicles); parts and accessories (included in this class) for such wind-powered machines, in particular rotor blades, rotor consoles, blade hubs, housings (parts of machines), yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power generatorsSECTION 70 - CANCELLED
009Switch cabinets (electric installation material) as well as therein contained electrical and electronic instruments and apparatus for recording, processing, storage and transmission of data; switch cabinets (electric installation material) as well as therein contained electrical and electronic control apparatus and instruments; electrical and electronic regulating apparatus; electrical and electronic regulating, checking (supervision), control and monitoring apparatus and instruments; data processing equipment, computer and computer software; interface apparatus and interface programs for computers; voltage surge protectors; vibration sensors; watt-hour meter; inverter units (electric converters); electric transformers; all aforementioned goods for wind power plants and wind farmsSECTION 70 - CANCELLED
016Printed matter, in particular magazines, customer magazines, brochures, test reports and inspection report (in particular survey report), certificates, calibration certificatesSECTION 70 - CANCELLED
035Professional business consultancy with regard to wind power plants and wind farmsSECTION 70 - CANCELLED
037Building construction in the field of wind power plants; installation services; maintenance services, rebuilding machines that have been worn or partially destroyed; servicing and repair of wind power plants; assembly of rotor blades for othersSECTION 70 - CANCELLED
039Transport; packaging and storage of goodsSECTION 70 - CANCELLED
041Training; training and further training for personnel development; arranging and conducting of seminars and school events in the field of wind power plants and wind power generation; arranging and conducting of seminars and workshops (training) of new developments, procedures and findings in the field of wind power productionSECTION 70 - CANCELLED
042Remote maintenance (remote control and remote monitoring) through computerised retrieval of wind power plants and wind farms, in particular via the Internet; conducting technical measurements, inspections and calculations in the field of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; technical consultancy, technical planning and development services as well as technical project management in matters of wind power plants projects; engineering services for calculation, dimensioning and design of rotor blades; technical research for wind power plants and wind farms; providing technical information in matters of wind power plants and wind farms; technical condition monitoring of rotor bladesSECTION 70 - CANCELLED
045Management of intellectual property rights and copyrights, exploitation of intellectual property rights and copyrights through licensing of intellectual property rights and copyrights, as well as licensing of database rights and merchandising rights; exploitation of industrial property rights and copyright by licensing, legal services relating to the management, control and granting of license rightsSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 13, 2014DETHDEATH OF INTERNATIONAL REGISTRATION
Feb 26, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Dec 30, 2013OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Dec 11, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 11, 2013OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Aug 20, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Aug 20, 2013ALIEASSIGNED TO LIE
Feb 14, 2013CNSLLETTER OF SUSPENSION MAILED
Feb 13, 2013CNSLSUSPENSION LETTER WRITTEN
Jan 30, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 30, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 30, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 31, 2012CRSNCORRECTION SENT TO IB
Aug 31, 2012CRCRCORRECTION CREATED FOR IB
Aug 17, 2012RFNTREFUSAL PROCESSED BY IB
Jul 30, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jul 30, 2012RFRRREFUSAL PROCESSED BY MPU
Jul 28, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jul 27, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 10, 2012MAFRAPPLICATION FILING RECEIPT MAILED
Jul 6, 2012DOCKASSIGNED TO EXAMINER
Jul 6, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 5, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance