Drawing for SOVENTIX

USPTO serial 79115036

SOVENTIX

Reviewed by CopyMark Law Group

Reg. 4362785Status 404
Filing date
Status date
Registration date
Jul 9, 2013
Examiner
BUJA, SANDRA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SOVENTIX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Susan G. O'Neill, Esq.

Susan G. O'Neill, Esq. HANSON BRIDGETT LLP425 Market Street26th FloorSan Francisco, CA 94105

Goods and services

ClassDescriptionStatusFirst use
006Components of metal, namely, solar panel mounts, metal ground mounting poles, roof trusses made of metal; construction supports of metal and mounting components of metal for protection of solar panels and photovoltaic modules; frames of metal for mounting solar panels and photovoltaic modules, metal frameworks, window frames, door frames for construction purposes of metal; small items of metal hardware, namely, metal mounting screws, brackets, nuts, washers, pulleys, springs; all of the foregoing for the generation of electricity from solar plants; bars of metal used as fasteners and solar panel mounts and photovoltaic module mounts; as well as metal construction building components as components of solar plants, namely, fabricated metal components for building foundations of solar plantsSECTION 71 - CANCELLED—
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric cables, electric circuit and current switches, automatic electric switches, electric grid connection gears, electric transformers, electric accumulators, voltage regulators for electric power, electric control panels; solar cells, photovoltaic cells, photovoltaic modules, photovoltaic solar modules, power inverters, charge controllers, namely, electronic controllers used to reduce power consumption, batteries, electrical connecting components, electrical cable connectors, electrical distributor units, electrical power distribution panels, parts and fitting components therefor, all relating to the applications of solar energy; and complete packages thereof, namely, kits for the of solar energy comprised of photovoltaic modules, photovoltaic solar modules, power inverters and mounts; measurement instruments and control systems and applications for the solar industry, namely, electronic sensors for measuring solar radiation, programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; apparatuses, devices and instruments for enabling continuous automatic orientation of the solar modules towards the sun as well as for distribution of electricity and energy, in particular solar energy, as far as these are comprised in this class, namely, programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy inputSECTION 71 - CANCELLED—
011Solar power plants and solar hybrid power plants, and solar thermal power plants for generation of heat; systems, and their components, so far as these are comprised in this class, for generation of heat, namely, heat generators and parts and fittings therefor, solar plants and systems, and their components, so far as these are comprised in this class, for solar heating or cooling, namely, solar collectors, solar energy receivers, solar reactors, solar thermal-based power plants, solar-powered heating and cooling units, and parts and fittings therefor; concentrating solar power plants (CSP Concentrating Solar Power) for heat generation; and solar-powered apparatus for lighting, and their components, so far as these are comprised in this class, namely, outdoor solar powered lighting units and fixtures, solar-powered all-weather lights, and parts and fittings thereforSECTION 71 - CANCELLED—
019Non-metal components, supports, frames for construction purposes, frames for constructions, building materials, all relating to the generation of electricity from solar energy, namely, non-metal construction supports, non-metal window and door frames, non-metal structures for mounting solar panels, non-metal roofing incorporating solar cells, concrete slabs designed to increase energy efficiency and energy conservation, pavement incorporating silicon solar cell material for electrical energy generation; non-metal roofing and non-metal facade panels for construction purposes with integrated solar cells, including their non-metal bonding fasteners for mountingSECTION 71 - CANCELLED—
035Business consulting and support in the area of economics and energy efficiency of solar plants; business consulting for franchise business management, organization and promotion; business consulting in the area of energy efficiency and environmental impact, conservation, preservation and protection policy, on international, national and regional levels; business consulting; business administration services, namely, business administration consultancy, assistance, business operation and office functions; procuring power purchase contracts for others for the delivery and purchase of electricity; ecommerce, namely, retail store and online retail store services featuring photovaltaic components and systems; collecting and systematizing data, in particular measurement values from installed photovoltaic systems into computer databases; analysis and compilation of information and data for regenerative energy generation plants, in particular of measurement values from installed photovoltaic systems for business management and operation and maintenance purposes; procurement services for third parties in the nature of purchasing of goods and services for other businesses, namely, procurement of photovoltaic systems for third parties; assistance with the commercial operation of large-scale photovoltaic systems for others for business purposesSECTION 71 - CANCELLED—
036Development of financing models, namely, financing services in the field of solar systems, solar plants and their components; investment in companies, namely, equity capital investment, providing venture capital, development capital, private equity and investment fundingSECTION 71 - CANCELLED—
037Building construction; installation and installation services, construction, repair of solar energy based power plants, in particular by means of maintenance and replacement of solar modules and parts and fittings therefor; repair and maintenance of systems and kits for solar energy applications, in particular photovoltaic wafers, photovoltaic cells and photovoltaic modules, solar cells, solar modules, solar glass, power inverters, charge controllers, batteries, electrical connecting elements, wiring, construction elements, frames, distributors, hardware, peripheral devices and hardware accessories, all relating to the applications of solar energy; construction of photovoltaic systemsSECTION 71 - CANCELLED—
038Transfer of information, texts, drawings and pictures concerning goods and services by telecommunications; transmission and transfer of information and data regarding regenerative energy generation systems, in particular of measurement values on installed photovoltaic systems, via Internet and global and local computer networks, electronic communication networks, telecommunication networks, and satelliteSECTION 71 - CANCELLED—
042Scientific and industrial research in the area of photovoltaic and solar panels; technical design development of construction elements, apparatuses and systems for solar panels and photovoltaic systems; development of computer programs for data processing, as far as control, regulation and/or monitoring of thermal and/or photovoltaic solar systems are concerned; consulting in the field of data processing computer programs and in the field of development of data processing programs; development of computer programs for data processing; development of new products for regenerative energy generation for third parties; technical consulting, namely, technical project engineer planning, design and construction planning in the area of photovoltaic systemsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 8, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
May 8, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 28, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 4, 2020INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 4, 2020INPCINVALIDATION PROCESSED—
Oct 14, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 14, 2020C71TCANCELLED SECTION 71—
Jul 9, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 24, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 16, 2014ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 16, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 28, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 25, 2013FIMPFINAL DISPOSITION PROCESSED—
Oct 9, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 9, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 23, 2013GPNXNOTIFICATION PROCESSED BY IB—
Apr 23, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 23, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 3, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 3, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 3, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 19, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 19, 2013ALIEASSIGNED TO LIE—
Mar 5, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 5, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Mar 5, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 5, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 5, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 11, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 11, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 6, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 6, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 4, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 30, 2012RFNTREFUSAL PROCESSED BY IB—
Aug 7, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 6, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 6, 2012RFRRREFUSAL PROCESSED BY MPU—
Aug 4, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 3, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 3, 2012DOCKASSIGNED TO EXAMINER—
Aug 3, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 2, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance