Drawing for WORGAS

USPTO serial 79115671

WORGAS

Reviewed by CopyMark Law Group

Reg. 4460449Status 404
Filing date
Status date
Registration date
Jan 7, 2014
Examiner
RICHARDS, SUSAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WORGAS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

George A. Pelletier, Jr.

George A. Pelletier, Jr. Cantor Colburn LLP20 Church StreetFloor 22Hartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
006Manifolds of metal for pipelines; ducts and pipes of metal for central heating installations; metal pipes and tubes and metal fittings therefore; metallic pipes and tubes; steel tubes; gutter pipes of metal; metal expansion joints for piping and ducting; branching pipes of metal; penstock pipes of metal; elbows of metal for pipes; drain pipes of metal; pipe muffs of metal; junctions of metal for pipes; reinforcing materials of metal for pipes; collars of metal for fastening pipes; clips of metal for pipes; wall hooks of metal for pipes; metal pipe connectors; pipe fittings of metal; rotating junctions of metal for pipes; metal sewer pipes; metal pipe couplings and joints; pipes of metal for liquid and gas transfer; valves of metal, other than parts of machinesSECTION 71 - CANCELLED—
011Heating apparatus, namely, heating boilers fueled by solid, liquid or gaseous fuels; heating apparatus for solid, liquid, or gaseous fuels, namely, gas stoves and furnaces; heat accumulators; heat exchangers, not parts of machines; heating apparatus, namely, heating furnaces, heating units for industrial purposes, heating systems for residential and commercial buildings comprised of boilers, valves, pipes, manifolds, control panel switches, and electrical wire, all sold as a unit; hot air space heating apparatus in the nature of electric space heaters; electric heating apparatus for industrial purposes, namely, electric heaters for commercial use; heating furnaces, heating installations, heating units for industrial purposes, electric space heaters, portable electric heaters, electric tubular heating elements, and electric cartridge-type heaters; heating installations; heating elements; heating filaments, electric; heat pumps; heat regenerators; burners for lamps; Bunsen burners for laboratory use; acetylene burners; gas burners; oil burners for commercial use; petrol burners for commercial use; brackets for gas burners, sold as part of gas burners; hot water heating installations; air reheaters; heating, steam, electrical, furnace, industrial boilers, other than parts of machines; heating boilers; gas boilers; wall-mounted and ground-based heating, steam, electrical, furnace, industrial boilers; boilers for hot water production for domestic and industrial use; steam boilers, other than parts of machines; feeding apparatus for heating boilers, namely, water heaters and boilers for heating installations, electrical boilers, and for furnaces; flues for heating boilers; Boiler pipes being tubes for heating installations in the nature of pipes for heating boilers; plumbing fittings, namely, pipe line cocks and spigots; faucets for pipes; safety accessories for water apparatus, namely, liquid flow apparatus, namely, hydraulic compensators; regulating accessories for water supply, namely, metered valves; regulating accessories for water or gas apparatus and pipes; regulating accessories for gas pipes and lines; electromechanical, catalytic, hydrogen, oxygen, nitrogen, zero-air, gas generators; air remediation systems, namely, gas scrubbers, being parts of gas installations; gas scrubbing apparatus, namely, gas scrubbers; thermostatic valves, being parts of heating installations; steam generating installations; expansion tanks for central heating installations; radiators; central heating radiators; electric radiators; gas injectors for feeding gas to gas burners for domestic and industrial use and parts thereof; gas water heaters for bath tubs and shower baths consisting of circulation pump with thermostat to fill, reheat water and keep water warm; electric bath heatersSECTION 71 - CANCELLED—
042Construction drafting; architectural design; architectural consultation; design of interior decor; engineering services, particularly, technical project planning for others; construction planning; scientific and technological services, namely, scientific research, analysis, testing in the field of combustion and burners production and design relating thereto; industrial research in the field of combustion and burners production; computer programming; installation of computer software; maintenance of computer software; updating of computer software; consulting services in the field of energy measurement to improve energy efficiency; technical research on combustion and burners production; technical consultancy relating to scientific research in the field of central heating installationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 5, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 5, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 22, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 22, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 22, 2021INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Jan 7, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 6, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 21, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 21, 2014FIMPFINAL DISPOSITION PROCESSED—
Apr 7, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 7, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 22, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 22, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 20, 2013GPNXNOTIFICATION PROCESSED BY IB—
Oct 2, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 2, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 2, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 16, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 13, 2013ALIEASSIGNED TO LIE—
Sep 4, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 14, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 19, 2013GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 19, 2013GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 19, 2013CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Feb 25, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 25, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 25, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 30, 2012RFNTREFUSAL PROCESSED BY IB—
Sep 10, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 10, 2012RFRRREFUSAL PROCESSED BY MPU—
Sep 8, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 7, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 28, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 23, 2012DOCKASSIGNED TO EXAMINER—
Aug 23, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 21, 2012LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Aug 16, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance