Drawing for SENSORY SKY

USPTO serial 79116439

SENSORY SKY

Reviewed by CopyMark Law Group

Reg. 4370470Status 706Registered
Filing date
Status date
Registration date
Jul 23, 2013
Examiner
ELTON, DAVID JONATHAN
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SENSORY SKY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

KLAUS P. STOFFEL

KLAUS P. STOFFEL LUCAS & MERCANTI, LLP30 Broad Street21st FloorNew York, NY 10004

Goods and services

ClassDescriptionStatusFirst use
009[ Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking and supervision, life-saving and teaching apparatus and instruments, namely, electric and electronic fittings for supplying, distributing, controlling, and regulating water, namely, electronic control panels, electric thermostats with and without regulators, water heater controls, water level indicators, water filter controllers, and fittings with motion detectors and infrared sensors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; data-processing equipment and computers; electronic light controls, electronic voice controls * for controlling taps and showers, * electronic acoustic controls * for taps and showers, all for use in respect of shower systems * ]SECTION 71 - CANCELLED—
011Electric and electronic fittings for supplying, distributing, controlling and regulating water, namely, control valves, metered valves, couplers, bibbs, used to distribute, control, and regulate water supply, [ radiant heaters, bath-water purifying apparatus for household purposes, flow restrictors for reverse osmosis water purification units, and hot water tanks; electric dispensers for air freshener and disinfectant dispensers for toilets; ] apparatus for [ lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, ] water supply and sanitary purposes, in particular sanitary fittings of metal [ and plastic ] for [ toilets, ] bathrooms [ and kitchens ], namely, fittings for supplying, distributing, controlling and regulating water, including fittings for water temperature regulation * for a shower system [ * and fragrance modules for directly dispensing fragrances into bath, shower, sink and toilet water; instantaneous water heaters, water treatment equipment, namely, water filtration units and reverse osmosis units, pre-assembled installation units for showers comprised of shower enclosures and lights; shower cubicles of plastic with integrated shower fittings and shower installations ] ; sanitary fittings of metal [, plastic and glass ] * for shower systems; * components for sanitary installations, in particular assembly elements for [ sanitary units ] * shower systems [ ; * connecting pillars for sanitary units; hot air blowers, including hot air blowers with heating apparatus for heating the blast air; steam bath installations and fittings therefor, fittings for steam baths, steam generating installations, steam heating apparatus, water softening units, lighting devices for tubs, drain structures and showers for use in steam rooms ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 28, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 11, 2024INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jun 14, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 30, 2023NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 30, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 30, 202371AGREGISTERED-SEC.71 ACCEPTED—
Sep 29, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 27, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Sep 1, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 12, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 25, 2023NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jul 25, 2023PR71POST REGISTRATION ACTION MAILED - SEC.71—
Jul 25, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 25, 2023XXXXPOST REGISTRATION ACTION CORRECTION—
Jul 20, 2023ES71TEAS SECTION 71 RECEIVED—
Jul 23, 2022REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Apr 29, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 3, 2022RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 17, 2020INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jun 5, 2020INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 5, 2020INPCINVALIDATION PROCESSED—
Apr 15, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 15, 2019NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Aug 15, 2019C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Aug 12, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 17, 2019ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 23, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jan 21, 2017INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Oct 8, 2016INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 8, 2016COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Feb 8, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 8, 2016LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jan 31, 2016LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Apr 25, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 16, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 28, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 25, 2013FIMPFINAL DISPOSITION PROCESSED—
Oct 23, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 23, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 1, 2013GPNXNOTIFICATION PROCESSED BY IB—
May 7, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 7, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 17, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 17, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 17, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 1, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 28, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 19, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 19, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 11, 2013ALIEASSIGNED TO LIE—
Mar 8, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 2, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 1, 2012RFNTREFUSAL PROCESSED BY IB—
Sep 10, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 10, 2012RFRRREFUSAL PROCESSED BY MPU—
Sep 10, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 9, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 4, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 31, 2012DOCKASSIGNED TO EXAMINER—
Aug 31, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 30, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance