Drawing for PERRIN

USPTO serial 79116528

PERRIN

Reviewed by CopyMark Law Group

Reg. 4416378Status 707Registered
Filing date
Status date
Registration date
Oct 15, 2013
Examiner
FARRELL, ANNE M
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with PERRIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael T. Murphy

Michael T. Murphy Global IP Counselors, LLP1233 20th Street, N.W.Suite 600Washington, DC 20036

Goods and services

ClassDescriptionStatusFirst use
006[ Iron and steel; nonferrous metals and their alloys; metal materials for building or construction, namely, soffits, fascia, ceiling boards and floor boards; metal pulleys, springs and valves not including machine elements; ] metal junctions for pipes; metal flanges [ ; industrial packaging containers of metal ]ACTIVE—
007[ Metalworking machines and metalworking machine tools; chemical processing machines and apparatus, namely, sorting machines and extracting machines; food or beverage processing machines and apparatus, namely, electric food and beverage processors; semiconductor manufacturing machines and systems, comprising gas supply system line and gas exhaust system line; non-electric prime movers not for land vehicles, namely, steam engine boilers, internal combustion engines, steam engines, turbines and compressed air engines; ] [ machine components not for land vehicles, namely, ] [ shafts, axles, and spindles, bearings, shaft couplings and connectors, power transmissions and gearing for machines, shock absorbers, brakes and ] [ valves ] [ ; hydraulic and pneumatic actuators for valves; plastic processing machines and apparatus, namely, compression moulding machines, extrusion moulding machines, and injection moulding machines ]SECTION 71 - CANCELLED—
011[ Drying apparatus for chemical processing; recuperators for chemical processing; steamers for chemical processing; evaporators for chemical processing; distillers for chemical processing; heat exchangers for chemical processing; air-conditioning apparatus for industrial purposes ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 6, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Apr 11, 2025INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 11, 2025INPCINVALIDATION PROCESSED—
Jan 23, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 23, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 23, 202471.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 20, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 22, 2023ES71TEAS SECTION 71 RECEIVED—
Oct 15, 2022REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Apr 21, 2022RNWLINTERNATIONAL REGISTRATION RENEWED—
Feb 13, 2021INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 13, 2021INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 13, 2021INPCINVALIDATION PROCESSED—
Jan 5, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 5, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 5, 202071.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Apr 30, 2020EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Nov 4, 2019PR71POST REGISTRATION ACTION MAILED - SEC.71—
Nov 4, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 11, 2019ES71TEAS SECTION 71 RECEIVED—
Oct 10, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 10, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 29, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 15, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 4, 2016CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 28, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 4, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 2, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 16, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 16, 2014FIMPFINAL DISPOSITION PROCESSED—
Jan 16, 2014LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jan 15, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 8, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Oct 15, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 30, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 10, 2013NPUBNOTICE OF PUBLICATION—
Jun 26, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 26, 2013ALIEASSIGNED TO LIE—
Jun 26, 2013ALIEASSIGNED TO LIE—
Jun 11, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 23, 2013AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
May 23, 2013PARITEAS VOLUNTARY AMENDMENT RECEIVED—
May 22, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 21, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 21, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 15, 2013CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 15, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 15, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 15, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 15, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 17, 2012RFNTREFUSAL PROCESSED BY IB—
Sep 24, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 24, 2012RFRRREFUSAL PROCESSED BY MPU—
Sep 22, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 21, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 15, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 11, 2012DOCKASSIGNED TO EXAMINER—
Sep 11, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 7, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance