Drawing for DMG MORI SEIKI

USPTO serial 79116994

DMG MORI SEIKI

Reviewed by CopyMark Law Group

Reg. 4441783Status 404
Filing date
Status date
Registration date
Dec 3, 2013
Examiner
OLANDRIA, WARREN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DMG MORI SEIKI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Numerically controlled metal working machines; numerically controlled materials handling machines and numerically controlled materials handling devices, namely, palletizers, case elevators, automatic pallet dispensing machines and automatic slip sheet dispensing machines; machine housings for numerically controlled machine tools and machining centers; numerically controlled machine tools, in particular machine tools with automatic tool changers; parts of and auxiliary equipment of numerically controlled machine tools, in particular mechanical fastening devices, holding devices for numerically controlled machine tools, drums for numerically controlled machine tools, tool-carrying spindles, spindle head stocks, spindle-carrying carriage, mechanical tools, namely, drilling tools, cutting tools and milling tools, and tool changers, tool magazines for machine tools, in particular for numerically controlled machine tools, manually and numerically controlled indexing devices, consisting of rotary indexing devices, indexing plates, indexing heads and rotary tables; work tables for machine tools; machines and lines composed of such machines for the numerically controlled production of work pieces and the numerically controlled machining of work pieces, in particular numerically controlled machine tools, industrial robots with control devices, numerically controlled mechanical conveying devices; numerically controlled assemblies for numerically controlled machine tools, in particular for numerically controlled milling machines, numerically controlled lathes and numerically controlled machining centers; automatic handling devices for work pieces or tools at numerically controlled machine tools; mechanical fastening devices for work pieces and tools to be used in connection with numerically controlled machine tools; devices and machines for automatically handling tools and work pieces; parts of the afore-mentioned goods; all of the afore-mentioned goods being not from the dental fieldSECTION 71 - CANCELLED—
009Measuring instruments for measuring position and orientation of work pieces and tools at machine tools, testing instruments for testing surface characteristics of work pieces at machine tools; regulating devices, control devices, measuring devices, registering devices and monitoring devices, in particular regulating devices, control devices, measuring devices, registering devices and monitoring devices for numerically controlled machine tools, devices for data storage and data processing; installations consisting of a combination of the before-mentioned apparatuses and devices; numerical, electromechanical, electric and electronic control devices and data processing devices for machine tools and lathes and for assemblies of machine tools and lathes; software for use in connection with industrial production and for production planning; special accessories for machine tools for processing metal materials and synthetic materials, namely, control cams, electric, electronic and numerical control devices, programming devices; electric communication devices and electric communication instruments, namely, optical transmitters, optical receivers, and optical data links; machines and instruments for distribution or control of electric energy; electronic machines and instruments and parts and constituent parts thereof; all of the aforementioned goods not in the dental areaSECTION 71 - CANCELLED—
042Design and development of computer programs for industrial production and/or for production planning, in particular design and development of computer programs for numerical control of machine tools; design of machines apparatus and instruments and their parts as well as systems composed thereof; drawing up of expert technical opinions and advice thereof in connection with the performance and handling of machines regarding differentiated know-how, techniques and experiences necessary for assuring proper operation thereof in combination with computers, power-driven vehicles or for other purposes; creating programs for data processing, providing maintenance for computer software; inspecting and researching in connection with machines and apparatuses; testing or research on prevention of pollution; testing inspection or research in the field of electronicsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 3, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Sep 3, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 22, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jan 21, 2022CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 28, 2021XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Dec 28, 2021XXCRGENERIC MADRID TRANSACTION CREATED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Dec 3, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 7, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 7, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Oct 29, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 14, 2015CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jan 14, 2015LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Dec 19, 2014CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Dec 18, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Apr 10, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 4, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 4, 2014FIMPFINAL DISPOSITION PROCESSED—
Mar 3, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 3, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 17, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 17, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 15, 2013GPNXNOTIFICATION PROCESSED BY IB—
Aug 28, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 28, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 28, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 9, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 8, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 6, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 6, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 6, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 5, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 29, 2013ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 19, 2013PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jul 9, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 8, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 14, 2013AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
May 6, 2013PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Apr 25, 2013ATRVATTORNEY REVIEW COMPLETED—
Apr 18, 2013LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Mar 30, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 25, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 25, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 20, 2013ALIEASSIGNED TO LIE—
Mar 19, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 18, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 18, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 17, 2012RFNTREFUSAL PROCESSED BY IB—
Sep 26, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 26, 2012RFRRREFUSAL PROCESSED BY MPU—
Sep 26, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 25, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 14, 2012DOCKASSIGNED TO EXAMINER—
Sep 14, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 13, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance