Drawing for SEA THE FUTURE

USPTO serial 79118750

SEA THE FUTURE

Reviewed by CopyMark Law Group

Reg. 6358120Status 404
Filing date
Status date
Registration date
May 25, 2021
Examiner
WILKE, JOHN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SEA THE FUTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Motors and engines except for land vehicles; egg incubators; motors and engines for water vehicles, and replacement component parts therefor; autonomous electric generators for underwater propulsion; turbines for energy production; alternators for energy production; wind turbine motors and engines; industrial robots ; airborne wind turbines, wind turbines; underwater turbine electric power generators; electricity generatorsSECTION 70 - CANCELLED
009Computer aided design software for design of weapons systems or ships, and of devices for the use and control of ships, navigation instruments; electrical systems and circuits for power generation and distribution for marine and submarine vehicles and naval weapon systems; public address systems for naval applications; electronic control systems for naval vessels; apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity; apparatus for recording, transmission, processing and reproduction of sound, images or data; musical sound recordings; blank magnetic recording data and optical discs; calculators; computers; blank magnetic data media; data processing apparatus or equipment; computer peripheral devices; electric batteries; computer hardware and simulation software for naval field training; electronic and computer hardware devices for managing and controlling of torpedo launching; radar apparatus, sonar; electrical installations for the control of naval installations; computer-controlled simulation cabin hardware that reproduces environments for naval training purposes, with a means for immersion and reproduction of all or part of premises with their functional, environmental, visual and dynamic aspects; computer software for reproducing the movement of platforms and environment computer hardware for use therewith; computer software for environment and equipment simulation used by surface vessels, submarines, nuclear reactors, and naval aviation taking into account the physical phenomena relating to the environment, such as electromagnetic propagation, sound propagation, thermodynamics, and restitution of visual and sound environments; computer software for modeling equipment for controlling platform installations in the field of propulsion systems, electric stations, nuclear reactors, and nuclear and civil installation safety; computer software for modeling navigation equipment; on-board dynamic control equipment for naval platforms; automated process control systems, namely, hardware and software used to automatically steer marine craft or vessels; dynamic global positioning system devices; vessel movement stabilization devices; namely, gyroscopes; automated computer hardware and software systems for supervising vessel navigation; apparatus for converting the movement of the sea, wind, or water temperature into electrical energy, and activated by the movement of the sea, wind, or change in water temperature; electric sensorsSECTION 70 - CANCELLED
011Submerged modules for generating nuclear energy; transportable nuclear power plants; equipment for generating nuclear energy; device modules for producing nuclear energySECTION 70 - CANCELLED
012Apparatus for locomotion by water, namely, boats and submarines; underwater driver propulsion vehicles; underwater remotely operated vehicles for transport; submarines; supply vessels; unmanned vehicle drones for use on water, underwater, or in the air; automated seaborne vehicles for recovering manned and unmanned vehiclesSECTION 70 - CANCELLED
013Firearms, ammunition and projectiles; explosives, fireworks; built-in combat devices, namely, ballistic or guided missiles, torpedoes, and mines, all for submarines that support the use of such weaponry; ballistic missiles and torpedo launchers; electronic control modules for launching missiles or torpedoes or for firing ammunitionSECTION 70 - CANCELLED
037Shipbuilding; naval base construction; repair and maintenance of vessels, submarines, combat systems, drones, underwater nuclear power production modules, wind turbines, underwater generators, equipment or modules for the production of nuclear or non-nuclear energy, and electricity production systems; installation of systems for combat, drones, underwater modules for nuclear energy production, wind turbines, underwater generators, equipment or modules for the production of nuclear or non-nuclear energy, and electricity production systems; maintenance of combat systems, mechanical systems, and electronic systems and components mounted onto vessels or platforms; maintenance of vessels, submarines, underwater modules for producing nuclear energy, wind turbines, underwater generators, equipment or modules for the production of nuclear or non-nuclear energy, and electricity production systems; installation, repair and maintenance of scientific, nautical apparatus and instruments, apparatus and instruments for conducting, distributing, transforming, accumulating, regulating and controlling electricity, underwater or non-underwater modules for producing nuclear or non-nuclear energy or transportable nuclear power plants; installation, maintenance and repair of systems carried on vessels and watercraftSECTION 70 - CANCELLED
038Computer terminal communication, via any type of media and any kind of technical procedure; communications by fiber-optic networks; providing access to databases; providing electronic communications systems for communication between calculators, both fixed or on-board vessels; broadband electronic data transmissions via radio relay, acoustic signals or via satellite; transmission of digital files; rental of access time to a computer database serverSECTION 70 - CANCELLED
041Providing services for training and training of personnel using simulators in the field of naval equipment, nuclear equipment, civil and naval aviation, and energy production; individual and group training services, namely, operational training for the operation and maintenance of naval platform, combat, navigation, and nuclear installations, all using simulators; competitions, games for education or entertainment purposesSECTION 70 - CANCELLED
042Engineering services, namely, research and development of new products for third parties, technological consulting in the field of computer, nuclear powers, and weapon systems and technical project planning studies; ship design; naval architecture; scientific and technological services, namely, research, design and development services relating in particular to the naval, nuclear, naval aviation and civilian aviation fields, as well as relating to energy production and storage; industrial analysis and research relating to nautical and electronic apparatus as well as relating to the naval, nuclear, civilian aviation, naval aviation and energy production fields; computer software design, development, installation, maintenance, updating or rental; programming of computers, memory cards, electronic cards, computer data bases or computer networks; data conversion of electronic information; conversion of documents from a physical to an electronic media; design and development of computer software in the fields of naval architecture and engineering, simulation computer software, computer software simulating the operation of nuclear installations, vessels, combat systems and energy production installations; maintaining in operational condition of computer systems software for development, updating and maintenance of computer software for aerodynamic, hydrodynamic and improved multidisciplinary design; computer programming in the field of hydrodynamics; expert maintenance assessment of the performance and reliability of drone docking and recovery systemsSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 10, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Dec 10, 2022DETHDEATH OF INTERNATIONAL REGISTRATION
Oct 3, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Sep 10, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB
Sep 10, 2021FIMPFINAL DISPOSITION PROCESSED
Aug 25, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 25, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 13, 2021GPNXNOTIFICATION PROCESSED BY IB
Mar 9, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Mar 9, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 17, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 17, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Feb 17, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 1, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 30, 2020RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Feb 11, 2020DOCKASSIGNED TO EXAMINER
Jan 30, 2020RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Jan 29, 2020ALIEASSIGNED TO LIE
Jul 3, 2019RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Jan 3, 2019RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
May 9, 2018RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Nov 3, 2017RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Apr 24, 2017RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Oct 4, 2016RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Sep 21, 2016ALIEASSIGNED TO LIE
Mar 1, 2016RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Mar 1, 2016ALIEASSIGNED TO LIE
Aug 31, 2015RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Feb 26, 2015RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Aug 11, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Aug 5, 2014ALIEASSIGNED TO LIE
Jul 22, 2014ALIEASSIGNED TO LIE
Apr 3, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Mar 19, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Mar 19, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Jan 14, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Jan 8, 2014ALIEASSIGNED TO LIE
Jun 24, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jun 24, 2013GNSLLETTER OF SUSPENSION E-MAILED
Jun 24, 2013CNSLSUSPENSION LETTER WRITTEN
Jun 3, 2013TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jun 3, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 3, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 3, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 23, 2012RFNTREFUSAL PROCESSED BY IB
Dec 3, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Dec 3, 2012RFRRREFUSAL PROCESSED BY MPU
Dec 1, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 30, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 21, 2012DOCKASSIGNED TO EXAMINER
Nov 2, 2012DOCKASSIGNED TO EXAMINER
Oct 30, 2012MAFRAPPLICATION FILING RECEIPT MAILED
Oct 24, 2012DOCKASSIGNED TO EXAMINER
Oct 24, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Oct 23, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance