USPTO serial 79118831
XSOL DOT
Reviewed by CopyMark Law Group
Reg. 4390099Status 404
- Filing date
- Status date
- Registration date
- Aug 27, 2013
- Examiner
- HWANG, JOHN C B
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with XSOL DOT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
R. Neil Sudol
R. Neil Sudol COLEMAN SUDOL SAPONE, P.C.714 COLORADO AVENUEBRIDGEPORT, CT 06605-1601UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Power distribution and control machines and apparatus, namely, power distribution panels, electrical power distribution units, rectifiers; rotary converters; phase modifiers; batteries and cells; photovoltaic generation equipment; solar battery power generation equipment; solar battery module power generation equipment; solar panels; solar battery modules; electric and magnetic meters and testers; electric wires and cables; telecommunication machines and apparatus, namely, telephones, modems; electronic machines, namely, battery rechargers; magnetic cores; resistance wires; fuel cell electrodes | SECTION 71 - CANCELLED | — |
| 035 | retail store services and wholesale distributorship services in the field of electrical machinery and apparatuses and photovoltaic generation equipment and solar thermal power generation equipment | SECTION 71 - CANCELLED | — |
| 037 | Construction; photovoltaic generation apparatus installation; consultancy relating to construction and civil engineering works; construction consultancy; operation, check and maintenance of building equipment; repair and maintenance of power distribution and control machines and apparatus; repair and maintenance of power generators; repair and maintenance of electric motors; photovoltaic generation equipment installation, repair and maintenance | SECTION 71 - CANCELLED | — |
| 042 | Architectural design; surveying; designing of machines, apparatus, instruments and systems composed of such machines, apparatus and instruments; designing, consultancy and information of photovoltaic generation equipment and solar thermal power generation equipment; designing; computer software design, computer programming, and maintenance of computer software; research on building construction and city planning; testing and research on prevention of pollution; testing and research on electricity; testing and research on civil engineering; testing and research on machines, apparatus and instruments; research and development of photovoltaic generation equipment; rental of computers; data network software programming services | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GREEN TEC CO., LTD.
- Other trademarks owned by GREEN TEC CO., LTD.
- Other trademarks owned by XSOL CO., LTD.
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named XSOL DOT
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 2, 2023 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jan 2, 2023 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 5, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 11, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 10, 2022 | INPC | INVALIDATION PROCESSED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Aug 27, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Feb 4, 2016 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 30, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 24, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 29, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 29, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 27, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 27, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 27, 2013 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 11, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 11, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 22, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 3, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 29, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 29, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 29, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 29, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 29, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 29, 2013 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 24, 2013 | ALIE | ASSIGNED TO LIE | — |
| Apr 11, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 11, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 15, 2012 | RFNP | REFUSAL PROCESSED BY IB | — |
| Oct 30, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 25, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 25, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 25, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 24, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 24, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 24, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 23, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |