USPTO serial 79119209
Z-SYSTEM
Reviewed by CopyMark Law Group
Reg. 4476464Status 707Registered
- Filing date
- Status date
- Registration date
- Feb 4, 2014
- Examiner
- VAGHANI, MAYUR C
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with Z-SYSTEM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Paul E Rossler
Paul E Rossler GableGotwals110 North ElginTulsa, OK 74120United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Weighing apparatus and instruments; measuring apparatus and instruments, namely, sensors and fiber optics for the determination of pressure, temperature, vibration, distance, speed, weight, flow, acoustics and other well parameters in the nature of fluid and gas concentration, fluid and gas location and wellbore integrity. signaling apparatus and instruments, namely, sensors and fiber optics for the determination of pressure, temperature, vibration, distance, speed, weight, flow, acoustics and other well parameters in the nature of fluid and gas concentration, fluid and gas location and wellbore integrity. checking apparatus for use in wells, namely, sensors and fiber optics for the determination of pressure, temperature, vibration, distance, speed, weight, flow, acoustics and other well parameters in the nature of fluid and gas concentration, fluid and gas location and wellbore integrity. Optical fiber cables; logging equipment for use in wells, namely, measuring instruments comprised of carbon composite rods carrying sensors, electronic data loggers, and fiber optics for the determination of pressure, temperature, vibration, distance, speed, weight, flow, acoustics and other well parameters in the nature of fluid and gas concentration, fluid and gas location and wellbore integrity | SECTION 71 - CANCELLED | — |
| 042 | Analysis services for oil and gas deposit exploitation; planning and execution services namely, analysis and testing of oil, gas and water wells; performing oil, gas and water well diagnostics including, measuring and analyzing of pressure, temperatures, reach, acoustics, flow and other parameters in wells, namely, fluid or gas entry or exit, leaks, well and reservoir parameters, fluid or gas speed and direction of flow, integrity of completion components, analysis and optimisation of production, completion and reservoir model parameters. Oil, gas and water injection well logging; well testing; well monitoring for optimisation of production, injection and tuning for optimal functioning of the well and assurance of well completion integrity and correct functioning of completion components. counseling regarding the foregoing services | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Archer AS
- Other trademarks owned by Ziebel AS
- Other trademarks owned by Ziebel AS
- Other trademarks owned by Ziebel AS
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named Z-SYSTEM
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 26, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 26, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 26, 2025 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Dec 3, 2024 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| Sep 30, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 2, 2024 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Dec 1, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 4, 2023 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jul 3, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 24, 2022 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Feb 4, 2020 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Feb 4, 2020 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Feb 4, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 13, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Feb 4, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 27, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 20, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 4, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 4, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 4, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 4, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 2, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 19, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 19, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 13, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 13, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 30, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 17, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 16, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 1, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 1, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 1, 2013 | ALIE | ASSIGNED TO LIE | — |
| Sep 30, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 17, 2013 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 17, 2013 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 17, 2013 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 27, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 26, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 26, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 27, 2012 | RFNP | REFUSAL PROCESSED BY IB | — |
| Nov 6, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 5, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 5, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 3, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 2, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 1, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 1, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 27, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |