Drawing for RED-WHITE

USPTO serial 79119225

RED-WHITE

Reviewed by CopyMark Law Group

Reg. 4405188Status 709
Filing date
Status date
Registration date
Sep 24, 2013
Examiner
VAGHANI, MAYUR C
Law office
TMEG LAW OFFICE 102

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RED-WHITE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kumiko Ide

Kumiko Ide Wenderoth, Lind & Ponack, L.L.P.1025 Connecticut Avenue NW, Suite 500Washington, DC 20036UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006[ Loading and unloading pallets of metal; metal turn-tables for load handling; traversers for load handling, namely, belts of metal for handling loads; paint spraying booths of metal; metal moulds for forming cement products, namely, cement posts and cement wall retainers; reservoirs of metal; Metal hardware, namely, pulleys of metal excluding machine elements; Metal hardware, namely, springs of metal excluding machine elements; ] valves of metal excluding machine elements [ ; metal junctions for pipes; metal flanges; keys, namely, metal bump keys for locksmithing and metal keys for locks; metal cotter pins ]SECTION 71 - CANCELLED
007[ Metalworking machines and tools, namely, boring machines and mechanical presses; chemical processing machines and apparatus, namely, extracting machines, separating machines, filtering machines; agricultural machines, namely, coulters, incorporators and cultipackers; agricultural implements other than hand-operated, namely, seed drills, hay balers and tillers; Semiconductor manufacturing machines; semiconductor manufacturing machines containing supply or exhaust system valves; machines and apparatus for manufacturing rubber goods, namely, rubber forming machines and rubber mixing machines; machine elements not for land vehicles, namely, ball transfer units, turntables and their rotating devices; shafts, axles or spindles not for land vehicles, namely, cam shafts, axles for machines, high frequency motor spindles with high frequency electric converters and power supply units; bearings not for land vehicles, namely, engine bearings and machine parts in the nature of bearings; shaft couplings or connectors for machines, not for land vehicles; power transmissions and gearing for machines; shock absorbers for machines; springs sold as an integral component of agricultural machinery in the nature of tillers and air compressors; brakes for machines; ] valves being parts of machines [ ; hydraulic linear and pneumatic valve actuators for opening and closing valves; pneumatic linear and valve actuators; mechanical hydraulic and pneumatic linear and valve actuators; valves or machine parts in the nature of joints for gasoline pumps for service stations ]SECTION 71 - CANCELLED
009[ Ozonisers; electrolysers; blueprinting machines; cash registers; coin counting or sorting machines; electric sign boards for displaying target figures, current outputs or the like; photo-copying machines; drawing apparatus and instruments adapted for use with computers; time and date stamping machines, namely, computer stylus and electronic computer drawing pad; time clocks; punched card office machines; voting machines; postage stamp checking apparatus, namely, computer scanners for scanning postage stamps; manually operated computing apparatus, namely, calculators and computers; billing machines, namely, automated billing machines for processing accounting information; mechanisms for coin-operated gates for car parking facilities, namely, gate operators powered by battery, electricity or solar power; life saving apparatus and equipment, namely, life-saving jackets and rafts; fire extinguishers; fire hoses; fire hose nozzles; sprinkler systems for fire protection; fire alarms; gas leak alarms; anti-theft warning apparatus, namely, burglar alarms; protective helmets; electric actuators ]SECTION 71 - CANCELLED
011[ Drying apparatus for chemical processing; recuperators for chemical processing; steamers for chemical processing; evaporators for chemical processing; distillers for chemical processing; heat exchangers for chemical processing; forage drying apparatus; air-conditioning apparatus for industrial purposes; waste water treatment tanks for industrial purposes; septic tanks for industrial purposes; solar water heaters; water purifying apparatus; tap water faucets; plumbing fittings in the nature of level controlling valves for tanks; pipe line cocks; fire hydrants ]SECTION 71 - CANCELLED
012[ Unloading tipplers for tilting railway freight cars; pusher cars for mining; puller cars for mining; traction engines; drive shafts, axles and spindles for land vehicles, axle and wheel bearings for land vehicles, shaft couplings or connectors for land vehicles; power transmissions and gearings for land vehicles; shock absorbers for land vehicles; suspension, coil and leaf springs for land vehicles; brakes for land vehicles ]SECTION 71 - CANCELLED
017[ Asbestos safety curtains; floating anti-pollution barriers; valves of rubber or vulcanized fiber not including machine elements; Gaskets, namely, pipe gaskets and non-metal gaskets for plumbing; ] junctions for pipes not of metal, namely, non-metal junctions for fluid supply and exhaust pipes [ ; graphite packings for valves; graphite, rubber or resin joint packing for water pipes and valves, fluid supply pipes and valves and exhaust pipes and valves; moldable graphite, rubber or resin compounds for use in jointing and packing; waterproof packings for valves or pipe joints; packing material of graphite, rubber or resin for forming seals for valves or pipe joints ]SECTION 7(e) - CANCELLED
019[ Artificial fish reefs not of metal; paint spraying booths not of metal; non-metal moulds for forming cement products, namely, cement posts and cement walls; road signs, not of metal, non-luminous, and not mechanical; beacons not of metal, non-luminous; reservoirs not of metal or plastics, namely, non-metal sump reservoirs for use in construction of basement waterproofing system ]SECTION 71 - CANCELLED
020[ [ Loading pallets, not of metal; beehives; hairdresser's chairs; barbers' chairs; ]valves of plastic being other than machine parts ]SECTION 7(e) - CANCELLED
037[ Repair or maintenance of water purifying apparatus ]SECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED
Feb 14, 2025INNTTOTAL INVALIDATION PROCESSED BY THE IB
Jan 16, 2025INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jan 15, 2025INPCINVALIDATION PROCESSED
Dec 6, 2024INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Apr 5, 2024C71TCANCELLED SECTION 71
Jan 27, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
May 27, 2023INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Apr 26, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Sep 24, 2022REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Aug 26, 2022LIMELIMITATION FROM THE IB EXAMINED AND ENTERED
Aug 26, 2022COC.CORRECTION UNDER SECTION 7 - PROCESSED
Aug 26, 2022PLGLASSIGNED TO PARALEGAL
Aug 4, 2022RNWLINTERNATIONAL REGISTRATION RENEWED
Jul 10, 2022LIMGLIMITATION OF GOODS RECEIVED FROM IB
May 4, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
May 4, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
May 4, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
May 4, 2022EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
May 4, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 4, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
May 4, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Apr 30, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 23, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 11, 2021INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Mar 14, 2021INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Mar 14, 2021INPCINVALIDATION PROCESSED
Feb 28, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jun 29, 2020NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Jun 29, 2020C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
Jun 29, 2020EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Mar 31, 2020PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Mar 31, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 12, 2020ES75TEAS SECTION 71 & 15 RECEIVED
Sep 24, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Sep 1, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED
Sep 4, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Mar 6, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 20, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 20, 2014FIMPFINAL DISPOSITION PROCESSED
Dec 24, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Sep 24, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 6, 2013LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Jul 21, 2013GPNXNOTIFICATION PROCESSED BY IB
Jul 9, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 30, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jun 19, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 19, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jun 19, 2013NPUBNOTICE OF PUBLICATION
Jun 18, 2013CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Jun 18, 2013CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Jun 5, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 5, 2013ALIEASSIGNED TO LIE
May 21, 2013CNEAEXAMINERS AMENDMENT MAILED
May 20, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
May 20, 2013XAECEXAMINER'S AMENDMENT ENTERED
May 20, 2013CNEAEXAMINERS AMENDMENT -WRITTEN
Apr 30, 2013AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Apr 30, 2013PARITEAS VOLUNTARY AMENDMENT RECEIVED
Apr 29, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 29, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 29, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 15, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 15, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Nov 27, 2012RFNTREFUSAL PROCESSED BY IB
Nov 7, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Nov 7, 2012RFRRREFUSAL PROCESSED BY MPU
Nov 7, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 6, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2012MAFRAPPLICATION FILING RECEIPT MAILED
Nov 1, 2012DOCKASSIGNED TO EXAMINER
Nov 1, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Oct 27, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance