USPTO serial 79121263
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
Jonathan Myers KF Ross, PC5720 Mosholu Ave.PO Box 900Bronx, NY 10471-0900| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for producing metal pipes, wires, bands, steel rods, billets, rails and sections, namely, machines for manufacturing, working and processing seamless and welded metal pipes, large-scale piping machines, hot and cold rolling mills for metal pipes, rolling mills for wires, steel rods, billets, rails and sections; drawing machines; power tools, namely, hot iron saws and cold saws; electrical and hydraulic shears; cutting machines, namely, metal pipe cutting machines; industrial machine presses, namely, wire coil presses, metal pipe testing presses, large-scale metal pipe spheroidizing presses, cable coating presses, mechanical and hydraulic metal powder presses; plate edge milling machines, metal pipe expanding machines; forging machines, namely, forging hammers, radial forging machines, forging manipulators; rod and bar milling machines; descaling machines for metal pipes, wires, steel rods, billets, rails and sections; buttwelding machines, metal pipe welding machines, all goods for the metal, copper, non-ferrous metal and aluminum industry | SECTION 71 - CANCELLED | — |
| 009 | Measuring and testing apparatus, namely, scales, ammeters, wattmeters, thermometers, water analyzers, gas and air analyzers, automatic chemical analyzers, speed measuring apparatuses, namely, speedometers and speed indicators, pressure measuring apparatus, namely, pressure gauges, pressure detectors, and pressure indicators, angle gauges, distance meters, roughness gauges, strip flatness meters, length and thickness measuring instruments for measuring the lengths and thicknesses of metal pipes, wires, rods and bars, metal hardness testing machines, tension testers, stress meters, x ray machines and apparatus not for medical use, namely, industrial x ray apparatus in the nature of testing equipment for determining industrial flaws, x ray tubes, apparatus and instruments for checking the temperature of wires, rods and bars, all for use in producing metal pipes, wires, bands, steel rods, billets, rails and sections; weighing equipment, namely, scales and balances for metal pipes, wires, steel rods, billets, rails and sections; automatic pressure control machines for use during the production of metal pipes, wires, bands, steel rods, billets, rails and sections comprised of computers | SECTION 71 - CANCELLED | — |
| 011 | Refrigeration equipment, namely, rapid food chilling units; quenching apparatus for heat treatment for producing metal pipes, wires, bands, steel rods, billets, rails and sections; melting furnaces; industrial cooling apparatus, namely, industrial coolers for the cooling of metal pipes, wires, steel rods, billets, rails and sections during production | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 6, 2022 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Nov 6, 2022 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Apr 23, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 12, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 12, 2022 | INPC | INVALIDATION PROCESSED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Sep 24, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 21, 2017 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 3, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 11, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 26, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 26, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 24, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 24, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 22, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 9, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 9, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 19, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 19, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 19, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 4, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 4, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jun 3, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 31, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 31, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 31, 2013 | ALIE | ASSIGNED TO LIE | — |
| May 29, 2013 | ALIE | ASSIGNED TO LIE | — |
| May 23, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 8, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 18, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 17, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 17, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 17, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 16, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 12, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 12, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 7, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |