Drawing for GROUP OF COMPANIES SODRUGESTVO

USPTO serial 79122140

GROUP OF COMPANIES SODRUGESTVO

Reviewed by CopyMark Law Group

Reg. 4693714Status 404
Filing date
Status date
Registration date
Mar 3, 2015
Examiner
VALLILLO, MELISSA C
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with GROUP OF COMPANIES SODRUGESTVO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
001Chemicals used in industry, science and photography, as well as in agriculture, horticulture and forestry except fungicides, herbicides, insecticides and parasiticides, namely, wetting agents for use on unpaved roads, road building, dust laying and wooden floors; unprocessed artificial resins, unprocessed plastics; soil fertilizers; fire extinguishing compositions; metal-tempering and soldering agents; chemical substances for preserving foodstuffs; tanning substances, namely, tanning agents for use in the manufacture of leather and textile; adhesives for industrial purposesSECTION 71 - CANCELLED—
004Industrial oils and greases; lubricants, namely, industrial lubricants, automotive lubricants, marine lubricants and aviation lubricants; dust absorbing and dust binding compositions for use on unpaved roads, road building, dust laying and wooden floors; dust binding compositions; fuels, namely, motor fuels, biofuels and electrical energy and illuminants, namely, candles and wicks for candles for lightingSECTION 71 - CANCELLED—
030Coffee, tea, cocoa, sugar, rice, tapioca, sago, artificial coffee; flour, and preparations made from cereals, namely, processed cereals, bread, pastry; edible ices; honey; treacle; yeast, baking-powder, salt, mustard; vinegar, sauces being condiments; spices; ice for refreshmentSECTION 71 - CANCELLED—
035Advertising; business management; office functionsSECTION 71 - CANCELLED—
037Construction of buildings, factories, storage facilities, underwater structures, harbors, piers, breakwaters, infrastructure facilities, namely, roads, railways, bridges, dams or transmission lines and consultancy services specializing in the field of the said construction; repair and maintenance of vehicles, agro-industrial production equipment, storage facilities, elevators, boilers, burners, electric appliances, freezing equipment, furnace, irrigation devices, machinery, pumps, heating, ventilation, air conditioning, buildings, factories, storage facilities, underwater structures, harbors, piers, breakwaters, infrastructure facilities, namely, roads, railways, bridges, dams or transmission lines; installation services, namely, installation of oil production equipment, plumbing, electric appliances, freezing equipment, furnace, irrigation devices, machinery, elevators, heating, ventilation and air conditioningSECTION 71 - CANCELLED—
040Treatment of materials namely, processing of seeds, beans, sugarcane, sugar beets, tree barks and bamboo, processing of fruits and berries, processing of fish, shrimps, prawns, crabs and lobsters, meal and flour milling, processing of fats and oils, refining and transetirification of fats and oils, energy production, recycling and waste treatment, air and water conditioning and purification, food and beverage processingSECTION 71 - CANCELLED—
042Scientific and technological services and research, namely, scientific research, technical research namely, engineering research, construction drafting, consultancy in the field of energy-saving, namely, in designing of energy-efficient buildings and vehicles; scientific consultation relating to research in the fields of alternative fuels, energy conservation and renewable energy, energy auditing, natural science services in the nature of scientific research relating to natural science, quality evaluation, namely, of food and feed products, components and additives, of commodities and raw materials; scientific laboratory services, mechanical research, technical project studies, namely, scientific feasibility studies, research and development of new products and design relating thereto, namely, packaging design, web site design, computer system design and computer software design; industrial analysis and research services, namely, analysis of industrial fluids, architectural and urban planning services, testing of materials, authentication, namely, product and scientific information authentication in the fields of energy conservation and renewable energy, and quality control for others, water analysis, engineering and engineering research; design and development of computers and softwareSECTION 71 - CANCELLED—
044Medical services; veterinary services; hygienic and beauty care for human beings or animals; agriculture, horticulture and forestry services, namely, crops and animal farming, contract farming for others, aerial and surface spreading of fertilizers and other agricultural chemicals, farming equipment rental, vermin exterminating for agriculture, horticulture and forestrySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 5, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 4, 2023DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 9, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 28, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 6, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 6, 2022INPCINVALIDATION PROCESSED—
May 17, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 17, 2021C71TCANCELLED SECTION 71—
Mar 3, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 29, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Oct 1, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 15, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 14, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 14, 2015FIMPFINAL DISPOSITION PROCESSED—
Jun 3, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 3, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 16, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 16, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 26, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 26, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 26, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 11, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 10, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 8, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Nov 8, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 8, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 8, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 27, 2014RFNTREFUSAL PROCESSED BY IB—
Jun 6, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 21, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 21, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 14, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 15, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 15, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 15, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 15, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 15, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 27, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 18, 2013ALIEASSIGNED TO LIE—
Sep 12, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 1, 2013RFNTREFUSAL PROCESSED BY IB—
Mar 14, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 14, 2013RFRRREFUSAL PROCESSED BY MPU—
Mar 14, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 13, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 11, 2013DOCKASSIGNED TO EXAMINER—
Jan 2, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 29, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 20, 2012REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance