USPTO serial 79122605
S/EAF
Reviewed by CopyMark Law Group
Reg. 4513042Status 404
- Filing date
- Status date
- Registration date
- Apr 15, 2014
- Examiner
- CLARKE, NANCY
- Law office
- POST REGISTRATION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with S/EAF?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
JONATHAN MYERS KF ROSS, PC5720 MOSHOLU AVE.PO BOX 900BRONX, NY 10471-0900Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for the steel industry, namely, [ electric reduction furnaces, electric arc furnaces specifically excluding submerged electric arc furnaces, ] converter plants for converting pig iron to liquid steel, gas purification/gas extraction plants, submerged degassing plants for removing hydrogen and carbon-containing gases from liquid steel before the liquid steel is poured into ingots or processed through a continuous caster, vacuum recirculation plants for removing hydrogen and carbon-containing gases from liquid steel before the liquid steel is poured into ingots or processed through a continuous caster, electric ladle furnaces, [ desulfurization plants, ] and structural parts for the foregoing machines; control devices as component parts of machines for the steel industry, namely, for electric reduction furnaces, for electric arc furnaces specifically excluding submerged electric arc furnaces, for converter plants, for gas purification/gas extraction plants, for submerged degassing plants, for vacuum recirculation plants, for electric ladle furnaces, and for desulfurization plants | SECTION 71 - CANCELLED | — |
| 009 | Electronic regulating devices to regulate the operation of machines used in the steel industry, namely, to regulate electric reduction furnaces, electric arc furnaces specifically excluding submerged electric arc furnaces, converter plants, gas purification/gas extraction plants, submerged degassing plants, vacuum recirculation plants, electric ladle furnaces, and desulfurization plants, sold separately; weighing apparatus, namely, scales, measuring apparatus, namely, strip flatness meters for measuring the flatness of the surface of steel strip, thermometers, speedometers, pressure gauges, angle gauges, distance meters, roughness meters for measuring the roughness of the surface of steel strip, signaling apparatus, namely, signal processors; checking apparatuses and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, electric luminescent display panels, light emitting diode displays, liquid crystal displays, strip tension dynamometers, and strip tensioning laboratory blades for holding a length of steel strip under longitudinal tension sufficient to give the steel strip a desired degree of rigidity, electric control panels for rolling mills, electrical and magnetic detectors for monitoring the properties of rolled steel; data processors and computers for use in operating and controlling operations of metallurgical plants and rolling mills; computer programs for controlling metallurgical plants, machines for the metallurgical industry, machines for the steel industry, continuous casting machines, forging machines, pressing machines, and machines for processing synthetic materials, and rolling mills, as well as computer applications software for controlling machine tools, all of the foregoing computer software and applications stored on compact discs | SECTION 71 - CANCELLED | — |
| 011 | Furnaces for steel plants, cooling installations for machines for the steel industry, namely, for electric reduction furnaces, for electric arc furnaces specifically excluding submerged electric arc furnaces, for converter plants, for gas purification/gas extraction plants, for submerged degassing plants, for vacuum recirculation plants, for electric ladle furnaces, for desulfurization plants * ; machines for the steel industry, namely, electric reduction furnaces, electric arc furnaces specifically excluding submerged electric arc furnaces, parts for the afore-mentioned machines * | SECTION 71 - CANCELLED | — |
| 037 | Construction consultation services in connection therewith | SECTION 71 - CANCELLED | — |
| 042 | Construction planning [ and consultation ] services in connection therewith; engineering services; design and development of computer software; technical consultation in the field of environmental science | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SMS Siemag Aktiengesellschaft
- Other trademarks owned by SMS Siemag Aktiengesellschaft
- Other trademarks owned by SMS Group GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named S/EAF
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 26, 2023 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Feb 26, 2023 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Apr 17, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 25, 2022 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Mar 24, 2022 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Apr 15, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 17, 2017 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Nov 7, 2017 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 7, 2017 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Mar 7, 2017 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Feb 24, 2017 | RINX | USPTO CORRECTION PROCESSED BY IB | — |
| Feb 24, 2017 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Mar 24, 2016 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 10, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 25, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 25, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 15, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 15, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 24, 2014 | CRSN | CORRECTION SENT TO IB | — |
| Feb 24, 2014 | CRCR | CORRECTION CREATED FOR IB | — |
| Jan 28, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 28, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 25, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 8, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 8, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 8, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 23, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 22, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 3, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 3, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 3, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 3, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 11, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 11, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 11, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 17, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 12, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 12, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 4, 2013 | ALIE | ASSIGNED TO LIE | — |
| Mar 1, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 8, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 29, 2013 | CRSN | CORRECTION SENT TO IB | — |
| Jan 29, 2013 | CRSN | CORRECTION SENT TO IB | — |
| Jan 29, 2013 | CRCR | CORRECTION CREATED FOR IB | — |
| Jan 29, 2013 | CRCR | CORRECTION CREATED FOR IB | — |
| Jan 11, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 11, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 9, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 8, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 4, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 31, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 31, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 27, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |