Drawing for STEAG

USPTO serial 79122922

STEAG

Reviewed by CopyMark Law Group

Reg. 4445656Status 709
Filing date
Status date
Registration date
Dec 10, 2013
Examiner
RICHARDSON, JENNIFER D
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with STEAG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Maria T. Ianiro

Maria T. Ianiro Rankin, Hill & Clark LLP23755 Lorain Road, Suite 200North Olmsted, OH 44070UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Business management and business administration, particularly in the field of power engineering, energy supply, as well as for energy supply companies and for companies receiving energy, electricity and process heat; commercial and business management of power plants; professional business consultancy in the field of the disposal of residues of power plants and the disposal of residues of waste incinerating plants; [ secretarial services;] conducting business surveysSECTION 71 - CANCELLED—
037[ Building construction, particularly in the area of energy supply; ] construction of installations in the field of cleanroom, air conditioning, energy, heat and environmental technology; installation, maintenance, servicing and repair of start-up of machines, control systems, electronic installations and industrial installations for the production and supply of energy, electricity, district heating and compressed air, the ventilation and environmental protection of contaminated manufacturing plants, wastewater purification, wastewater treatment and sewage treatment, sludge treatment and flue gas cleaning, and for nuclear installations; maintenance of industrial buildings; remediation of nuclear contaminated sites, namely, hazardous waste disposal services; hazardous waste disposal services in the nature of the decommissioning and disposal of nuclear installations used for nuclear and fossil fueled energy production; installation of energy systems for use of renewable energies, particularly biomass, biogas, mine gas, geothermal energy and wind energy; construction consultationSECTION 71 - CANCELLED—
039Transport and distribution of energy, electricity, gas, thermal and district heat, compressed air and water; transport of gases, liquids and solids by pipeline; energy supply of end customers, particularly by delivering thermal heatSECTION 71 - CANCELLED—
042Engineering; consulting in the field of architecture and chemistry services, namely, research in the field of chemistry and chemistry consultation; physics research; technical monitoring of production processes in power plants for quality control purposes; technical consultancy, namely, inspection, supervision, verification and quality control to assure compliance with industry standards in the field of power related matters, namely, power generation and power plants; building and construction drafting and construction consultancy; surveying; technical consultancy in the field of power related matters, namely, power plant engineering; technical expert opinions, namely, engineering surveys in the field of power generation, namely, conducting power generation plant engineering surveys; material testing and quality control for others; chemical and physical analysis of waste and residues from waste incineration plants, power plants and water treatment plants; computer programming; all of the aforementioned services particularly in the field of power engineering, energy supply, as well as for energy supply companies and for companies receiving energy, electricity and process heat; technical consultancy for the disposal of power plants and the disposal of residues of waste incinerating plants; technical planning, namely, design of energy systems for use of renewable energies, particularly biomass, biogas, mine gas, geothermal energy and wind energySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 6, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 6, 2026C71TCANCELLED SECTION 71—
Dec 10, 2022REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 20, 2022RNWLINTERNATIONAL REGISTRATION RENEWED—
Feb 26, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 19, 2020INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 13, 2020INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 13, 2020INPCINVALIDATION PROCESSED—
Feb 17, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 17, 2019NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 17, 201971AGREGISTERED-SEC.71 ACCEPTED—
Jun 12, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 5, 2019ES71TEAS SECTION 71 RECEIVED—
Dec 10, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 20, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 10, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 10, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 10, 2014FIMPFINAL DISPOSITION PROCESSED—
Mar 10, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 10, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 24, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 24, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 23, 2013GPNXNOTIFICATION PROCESSED BY IB—
Sep 4, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 4, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 4, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 26, 2013CRSNCORRECTION SENT TO IB—
Aug 26, 2013CRCRCORRECTION CREATED FOR IB—
Aug 21, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 21, 2013ALIEASSIGNED TO LIE—
Aug 11, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 8, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Aug 8, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 8, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 8, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 18, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 18, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 18, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 4, 2013RFNTREFUSAL PROCESSED BY IB—
Feb 13, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 13, 2013RFRRREFUSAL PROCESSED BY MPU—
Feb 13, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 12, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2013DOCKASSIGNED TO EXAMINER—
Jan 15, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 9, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 3, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance