Drawing for IBC SMART SYSTEMS FOR SOLAR POWER

USPTO serial 79123002

IBC SMART SYSTEMS FOR SOLAR POWER

Reviewed by CopyMark Law Group

Reg. 4565882Status 404
Filing date
Status date
Registration date
Jul 15, 2014
Examiner
NADELMAN, ANDREA KOYNER
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with IBC SMART SYSTEMS FOR SOLAR POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Henry B. Ward, III

Henry B. Ward, III Moore & Van Allen PLLCSuite 4700, 100 North Tryon StreetCharlotte, NC 28202-4003UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Mounting frames of metal for solar installations, solar modules and laminates; metal building materials, namely, connecting products in the nature of metal pipe connectors, metal sheets, metal mountings, metal mounting sheets, cross beams, retaining tubes, front plates, profiles, metal rivets, metal bolts, retaining angles, mounting corners, roof hooks, metal anchors, metal gutters, metal interconnection pieces for roofs, metal cotter pins, metal clamps, carrier rails, frameworks of metal for buildings, cladding of metal for building, solar panel mounts, attachment means and profiles for the fixation of solar modules to the roof or wall, namely, metal connecting links, transportable buildings of metal; pipes and tubes of metalSECTION 70 - CANCELLED—
009Current inverters, charge regulators, batteries, electric cables, electric and electronic measuring and display systems for solar installations, in particular for wind strength, temperature and energy; all the aforesaid goods relating to solar energy; photovoltaic installations being individual units, and components therefor, in particular solar modules of sizilium or other semiconductors, namely, apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modulesSECTION 70 - CANCELLED—
035Advertising; retail and wholesale services by direct solicitation by sales agents in the field of mounting frames of metal for solar installations, solar modules and laminates, metal building materials, transportable buildings of metal, pipes and tubes of metal, current inverters, charge regulators, batteries, electric cables, electric and electronic measuring and display systems for solar installations, in particular for wind strength, temperature, output and energy, photovoltaic installations being individual units, and components therefor, in particular solar modules of sizilium or other semiconductorsSECTION 70 - CANCELLED—
037Building construction; repair of construction machines and construction equipment, repair of water vehicles, repair of process technology installations for environmental technology, installation services of regenerative energy and photovoltaic solar installations and modules, and components therefor; building construction information; building construction supervision; building construction monitoring in the nature of evaluating the progress for others of building projects; building construction and development services, namely implementation of building projects; construction and maintenance services relating to civil engineering, namely, construction and maintenance of regenerative energy and photovoltaic solar projectsSECTION 70 - CANCELLED—
042Architectural consultancy; architectural services, surveys, geological surveying; surveying, research and development for others in the fields of regenerative energy and photovoltaic solar equipment, modules, installations, processes and techniques, technical project studies in the fields of regenerative energy and photovoltaic solar installations; building construction preparation services in the nature of technical consultation in relation to building project engineering; engineering; technical measuring and testing in the nature of scientific laboratory services; construction drafting; physics research; environmental impact assessments in the nature of environmental testing and inspection servicesSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 10, 2014DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 10, 2014DETHDEATH OF INTERNATIONAL REGISTRATION—
Jul 15, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 20, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 4, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 4, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 29, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 29, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 25, 2014GPNXNOTIFICATION PROCESSED BY IB—
Apr 9, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 9, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 9, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 26, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 24, 2014ALIEASSIGNED TO LIE—
Mar 10, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 10, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Mar 10, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 10, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 10, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 7, 2013GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 7, 2013GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 7, 2013CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 17, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 16, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 16, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 3, 2013ATRVATTORNEY REVIEW COMPLETED—
Jun 1, 2013LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Apr 28, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Feb 8, 2013RFNTREFUSAL PROCESSED BY IB—
Jan 16, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 16, 2013RFRRREFUSAL PROCESSED BY MPU—
Jan 15, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 12, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 11, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 9, 2013DOCKASSIGNED TO EXAMINER—
Jan 9, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 3, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance