USPTO serial 79123040
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | OIL AND GAS PRODUCTION MACHINERY, APPARATUS AND EQUIPMENT, NAMELY, ONSHORE AND OFFSHORE HYDROCARBON SEPARATION MACHINES, WATER INJECTION MACHINES, PUMPING MACHINES, GAS COMPRESSION MACHINES, GAS CONVERSION MACHINES, AND MASS TRANSFER MACHINES FOR THE EXTRACTION, PROCESSING AND EXPORTING OF OIL AND NATURAL GAS; OIL AND GAS WELL MACHINERY AND EQUIPMENT FOR ACCOMMODATION FACILITIES; OIL AND GAS PRODUCTION AND WELL MACHINERY AND APPARATUS, NAMELY, MARINE DRILLING RISERS AND TIE-BACK DRILLING RISERS CONSISTING OF PRODUCTION RISER MACHINES, DRILLING RISER MACHINES, SERVICE/WORKOVER RISER MACHINES, RISER CONNECTOR MACHINES AND RISER HANDLING MACHINES, GANTRYS, TETHER HANGOFF AND BOTTOM CONNECTORS, WINCHES, WINDLASSES, AND CABLE HANDLING MACHINES; CHAIN STOPPING MACHINES FOR USE IN EQUIPPING AND BUILDING SEA-GOING VESSELS AND OIL AND GAS DRILLING PRODUCTION RIGS/PLATFORMS; OIL AND GAS PRODUCTION AND WELL MACHINERY AND APPARATUS FOR OFFSHORE LOADING BETWEEN A SEA-GOING VESSEL AND AN OIL AND GAS INSTALLATION OR ANOTHER SEA-GOING VESSEL, NAMELY, CHAIN STOPPING MACHINES, WINCHES, POWER-OPERATED HOSE REELS, HOSE CRANES, HOSE CONVEYORS, AND HOSE TRAY CONVEYORS; OIL AND GAS PRODUCTION AND WELL MACHINERY, NAMELY, WELLHEADS, SUBSEA PUMPS, CRUDE OIL CONDITIONING MACHINES, INJECTION MACHINES FOR WATER, MUD AND CHEMICALS, PUMPING COMPRESSION MACHINES, HEAT EXCHANGE MASS TRANSFER MACHINES FOR USE IN SUBSEA COMPONENTS, AND PRODUCTS AND SYSTEMS FOR THE EXTRACTION, PROCESSING AND EXPORTING OF OIL AND NATURAL GAS, NAMELY, OIL AND GAS WELL MACHINERY, APPARATUS AND EQUIPMENT, NAMELY, WIRELINE MACHINES INCORPORATING LOGGING MACHINES, SURFACE POWER AND CONTROL MACHINES, AND ELECTRICAL TOOLS IN THE NATURE OF TRACTOR TOOLS FOR FUNCTIONS INCLUDING SCALE REMOVAL, MILLING, SIDE-TRACKING, SAND-BAILING, PERFORATING AND PLUG-SETTING FOR USE IN DOWNHOLE COMPONENTS; MACHINERY FOR THE EXTRACTION, PROCESSING AND EXPORTING OF OIL AND NATURAL GAS, NAMELY, PUMPS, COMPRISING MEDIUM CONSISTENCY FLUIDIZING PUMPS; CENTRIFUGAL PUMPS; PUMPS FOR MACHINES, NAMELY, LINE SHAFT PUMPS AND MULTIPHASE PUMPS USED IN MACHINES FOR CRUDE OIL TRANSPORTATION, FIREFIGHTING AND SEAWATER SYSTEMS, LIFT PUMPS, BOOSTER PUMPS, CONTROL AND DISTRIBUTION PUMPS, SUBSEA COMPRESSOR PUMPS FOR GAS/LIQUID SEPARATION, LIQUID PUMPS AND GAS COMPRESSOR PUMPS FOR THE PRESSURE BOOSTING OF NATURAL GAS; MACHINERY, APPARATUS, EQUIPMENT AND STRUCTURAL PARTS THEREFOR USED IN THE PRODUCTION, REFINING, TRANSPORT AND STORAGE OF PETROLEUM PRODUCTS, NAMELY, OIL WELL PUMPING MACHINES, DRILLING MACHINES, BORING MACHINES, CORE DRILLING BITS, OIL SEPARATORS, ELECTRIC PUMPS, CENTRIFUGAL PUMPS, MULTIPHASE PUMPS, PUMP CONTROL VALVES, WELLHEADS, SUBSEA AIR COMPRESSORS, AND SUBSEA GAS COMPRESSORS; MOTORS AND ENGINES EXCEPT FOR LAND VEHICLES; MACHINE COUPLING AND TRANSMISSION COMPONENTS EXCEPT FOR LAND VEHICLES; FLOATING AND NON-FLOATING DRILLING RIGS AND PRODUCTION RIGS FOR OIL AND GAS PRODUCTION; FLOATING AND NON-FLOATING DRILLING DERRICKS FOR OIL- AND GAS PLATFORMS; FLOATING AND NON-FLOATING JACK-UP DRILLING RIGS; FLOATING AND NON-FLOATING JACK-UP PRODUCTION RIGS FOR OIL AND GAS PRODUCTION; APPARATUS AND INSTALLATIONS FOR SEPARATING AND TREATMENT OF FLUIDS, GAS AND SOLIDS, NAMELY, CENTRIFUGES AND STRUCTURAL PARTS AND FITTINGS TO THE AFOREMENTIONED GOODS | SECTION 71 - CANCELLED | — |
| 037 | BUILDING CONSTRUCTION, REPAIR AND INSTALLATION SERVICES, NAMELY, INSTALLATION AND REPAIR OF MACHINES AND MACHINE TOOLS, MOTORS AND ENGINES EXCEPT FOR LAND VEHICLES, MACHINE COUPLING AND TRANSMISSION COMPONENTS EXCEPT FOR LAND VEHICLES, FLOATING AND NON-FLOATING DRILLING RIGS AND PRODUCTION RIGS, FLOATING AND NON-FLOATING DRILLING DERRICKS FOR OIL AND GAS PLATFORMS, FLOATING AND NON-FLOATING JACK-UP DRILLING RIGS, FLOATING AND NON-FLOATING JACK-UP PRODUCTION RIGS, TRANSPORTABLE FLOATING APPLIANCES FOR LODGING PEOPLE, APPARATUS AND INSTALLATIONS FOR SEPARATING AND TREATMENT OF FLUIDS, GAS AND SOLIDS, NAMELY, CENTRIFUGES AND SEPARATORS; INSTALLATION AND REPAIR SERVICES, NAMELY, INSTALLATION AND REPAIR OF ONSHORE AND OFFSHORE OIL AND GAS EXPLORATION FACILITIES AND TO OFFSHORE AND ONSHORE OIL AND GAS PRODUCTION PLANTS; INSTALLATION AND REPAIR SERVICES, NAMELY, INSTALLATION AND REPAIR OF ONSHORE AND OFFSHORE ENERGY PLANTS; INSTALLATION AND REPAIR SERVICES, NAMELY, INSTALLATION AND REPAIR OF INDUSTRIAL FACILITIES INCLUDING PLANTS FOR THE PROCESSING OF WASTE WATER, ONSHORE OIL AND GAS, AND OIL REFINING | SECTION 71 - CANCELLED | — |
| 040 | TREATMENT OF MATERIALS, NAMELY, BUILDING MATERIALS FOR CONSTRUCTION OF OFFSHORE AND ONSHORE OIL AND GAS EXPLORATION FACILITIES AND OIL AND GAS PRODUCTION PLANTS, BUILDING MATERIALS FOR CONSTRUCTION OF ENERGY PRODUCTION PLANTS, AND BUILDING MATERIALS FOR CONSTRUCTION OF WINDMILLS AND WINDMILL PARKS | SECTION 71 - CANCELLED | — |
| 042 | SCIENTIFIC AND TECHNOLOGICAL SERVICES, NAMELY, RESEARCH AND DESIGN IN THE FIELD OF OIL AND GAS EXPLORATION, IN THE FIELD OF CONSTRUCTION, REPAIR AND INSTALLATION OF OIL AND GAS PRODUCTION PLANTS, IN THE FIELD OF CONSTRUCTION, REPAIR AND INSTALLATION OF WINDMILLS AND WINDMILL PARKS, AND IN THE FIELD OF ENERGY PLANTS; INDUSTRIAL TECHNICAL ANALYSIS AND RESEARCH SERVICES IN THE FIELD OF OFFSHORE AND ONSHORE OIL AND GAS EXPLORATION, IN THE FIELD OF CONSTRUCTION, REPAIR AND INSTALLATION OF OIL AND GAS PRODUCTION PLANTS, IN THE FIELD OF CONSTRUCTION, REPAIR AND INSTALLATION OF WINDMILLS AND WINDMILL PARKS, AND IN THE FIELD OF ENERGY PLANTS; DESIGN AND DEVELOPMENT OF COMPUTER HARDWARE AND SOFTWARE; ENGINEERING SERVICES IN THE ENERGY SECTOR, ENGINEERING SERVICES IN THE FIELD OF UPSTREAM AND DOWNSTREAM OIL AND GAS OPERATORS, INDUSTRIAL COMPANIES AND OTHER ENGINEERING AND FABRICATION PROVIDERS; ENGINEERING SERVICES FOR DESIGNING DRILLING PLATFORMS AND FLOATERS | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 23, 2023 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jan 23, 2023 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| May 23, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 1, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 31, 2022 | INPC | INVALIDATION PROCESSED | — |
| Mar 19, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Jul 23, 2020 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED | — |
| Jun 5, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 24, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 23, 2017 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Dec 26, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 8, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 8, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 24, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 24, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 20, 2014 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 4, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 4, 2014 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 8, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 8, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 3, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 19, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 19, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 19, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 28, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 28, 2014 | ALIE | ASSIGNED TO LIE | — |
| Feb 11, 2014 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Feb 10, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 5, 2014 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Feb 5, 2014 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Feb 5, 2014 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Feb 5, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 5, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 5, 2014 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 31, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 22, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 16, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 9, 2013 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 9, 2013 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 9, 2013 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 10, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 10, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 10, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 30, 2013 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 30, 2013 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 8, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 16, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 15, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 15, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 10, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 9, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 9, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 9, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 3, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |