Drawing for G

USPTO serial 79123491

G

Reviewed by CopyMark Law Group

Reg. 4479325Status 404
Filing date
Status date
Registration date
Feb 11, 2014
Examiner
CARLSON, KRISTIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with G?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Mounting frames of metal for fastening solar modules and laminates; common metals and their alloys; metal building materials, namely, metal profiles; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery, namely, coated steel; small items of metal hardware, namely, nuts, washers, brackets, screws; pipes and tubes of metal; metal safes; goods of common metal not included in other classes, namely, profiles, metal bolts, metal boxes, metal clamps; metal oresSECTION 71 - CANCELLED—
007Automatic vending machinesSECTION 71 - CANCELLED—
009Inverters, electric cables, voltage charge regulators, batteries, electric and electronic measuring and display apparatus for solar installations; all the aforesaid goods being parts for solar energy installations and photovoltaic installations; scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking, supervision, life-saving and teaching apparatus and instruments, namely, photovoltaic data monitoring system comprised of electronic device for monitoring and optimizing photovoltaic arrays, photovoltaic cells and modules, photovoltaic inverters, photovoltaic systems that convert sunlight into electrical and thermal energy, photovoltaic solar modules for production of electricity; electrical field combiners, electrical junction boxes, inverter charge controller; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric switches, electric converters, electrical controllers, electrical connection boxes, electrical substations, namely, electrical substations comprised of transformers, circuit breakers, circuit switchers, voltage regulators, fuses, capacitors, relays, rectifiers, and electric power converters; transformer switch gear; apparatus for recording, transmission or reproduction of sound or images; pre-recorded magnetic data carriers featuring information in the field of solar energy installations and photovoltaic installations; pre-recorded recording discs featuring information in the field of solar energy installations and photovoltaic installations; mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment, computers; fire-extinguishing apparatus, solar installations for generating electrical energy, namely, consisting of solar modules for power generation, inverters, electronic apparatus and instruments for control, regulation, capture and monitoringSECTION 71 - CANCELLED—
011Solar installations for generating thermal energy, namely, consisting of solar thermal collectors, solar water heaters, solar furnaces, and fittings therefor; apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes, namely, lighting installations, heating installations, steam generating installations, cooking ovens, refrigerators, clothes drying machines, ventilation hoods for stoves, metered valves for regulating water supply, pipes being parts of sanitary facilitiesSECTION 71 - CANCELLED—
019Non-metal tiles, non-metal roofs with integrated solar cells, non-metal facade parts, in particular of or with glass and/or photovoltaic elements; non-metal building materials, namely, glass with integrated solar cells; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metalSECTION 71 - CANCELLED—
035Business consultancy with regard to the use of photovoltaic installations and systems; advertising services; business management; business administration; providing office functions; professional business analysis of information and data concerning installations for generating renewable energy; compilation and systemization of information into computer databases; electronic data processing consultancySECTION 71 - CANCELLED—
037Installation services, namely, installation of systems for generating renewable energy, electrical systems, appliances; repair, assembly and maintenance of installations for generating renewable energySECTION 71 - CANCELLED—
038Telecommunications, in particular providing access to internet services; electronic transmission of information and data relating to installations for generating renewable energy; internet services, namely, the transmission of information and data concerning installations for generating renewable energySECTION 71 - CANCELLED—
042Development of components, equipment and systems for photovoltaics; computer programming in connection with the sale, production, installation and maintenance of machines for installations for utilising rainwater, pumps, solar installations, solar thermal installations, wind power installations, photovoltaic installations, photovoltaic modules and computer programming in connection with installations for generating renewable energy; development of technological projects in the field of generating renewable energySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 14, 2023UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
Jan 23, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jan 23, 2023DETHDEATH OF INTERNATIONAL REGISTRATION—
May 23, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Apr 4, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 4, 2022INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Jun 27, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 6, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 6, 2014FIMPFINAL DISPOSITION PROCESSED—
May 11, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 11, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 2, 2013GPNXNOTIFICATION PROCESSED BY IB—
Nov 26, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 13, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 6, 2013NPUBNOTICE OF PUBLICATION—
Oct 17, 2013PBPRWITHDRAWN FROM PUB - ESU SUPERVISOR REQUEST—
Oct 16, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 15, 2013ALIEASSIGNED TO LIE—
Oct 1, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 12, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 12, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 12, 2013ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 1, 2013RDX2ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED MAILED—
Jul 31, 2013RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Jul 30, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 30, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 30, 2013ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 8, 2013CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 5, 2013CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 15, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 15, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2013RFNTREFUSAL PROCESSED BY IB—
Jan 25, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 25, 2013RFRRREFUSAL PROCESSED BY MPU—
Jan 25, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 24, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 19, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 15, 2013DOCKASSIGNED TO EXAMINER—
Jan 15, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 10, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance