Drawing for BIG FOOT SYSTEMS

USPTO serial 79124038

BIG FOOT SYSTEMS

Reviewed by CopyMark Law Group

Reg. 4896720Status 706Registered
Filing date
Status date
Registration date
Feb 9, 2016
Examiner
CALLAGHAN, BRIAN P
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with BIG FOOT SYSTEMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew Saunders

Matthew Saunders Saunders & Silverstein LLP14 Cedar Street Suite 224Amesbury, MA 01913United States

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials for use in rooftop equipment support systems, namely, rooftop mounted building services equipment being metal supports for metal pipework, metal cable trays/raceways, metal conduits, ducting for use in heating, ventilation and air conditioning systems; frameworks of metal for use in rooftop equipment support systems, namely, the support of heat pumps, variable refrigerant flow (VRF) air conditioning units, chillers for refrigeration and ventilation equipment in the nature of air handling units; [ stairs and steps of common metal; ] metal ducting for use in the support of heat pumps, variable refrigerant flow (VRF) air conditioning units, chillers for refrigeration and ventilation equipment in the nature of air handling units; [ metal building materials, namely, stationary prefabricated walkways of common metal; metal railings; protective railings of metal; goods of metal for use in rooftop support systems, namely, metal cross-over platforms, metal walkways, metal platforms; ] all the aforementioned goods being for use in the support of plant, equipment, safe access systems and associated building servicesACTIVE
017[ Plastic sheets, bars, blocks, pellets, tubes for use in the manufacture of building materials, namely, mounting platforms for the support of light building services equipment, pipe supports, cable tray supports and ductwork supports for heating, ventilation, refrigeration and air conditioning systems and installations and platform bases for the support of solar panels; plastic sheets, bars, blocks, pellets, tubes for use in the manufacture of rooftop equipment support systems; insulating materials; flexible non-metallic pipes; all the aforementioned goods being for use in the support of plant, equipment, safe access systems and associated building services ]SECTION 71 - CANCELLED
019Non-metallic frameworks for use in rooftop equipment support systems; [ non-metallic building materials, namely, stationary pre-fabricated walkways; non-metallic stairs and steps; non-metallic ducting; non-metallic railings; non-metallic protective railings; ] non-metallic goods for use in rooftop equipment support systems, namely, cross-over platforms, platform bases, non-metallic conduits for plumbing and drainage; all the aforementioned goods being for use in the support of plant, equipment, safe access systems and associated building servicesACTIVE
037Building services, namely, construction [ and repair ] services relating to rooftop equipment support systems; [ repair, ] installation [ and maintenance ]services relating to rooftop equipment support systems; all the aforementioned services being for use in the support of plant, equipment, safe access systems and associated building servicesACTIVE
042Advisory services, namely, consultation relating to the design of engineering products; design services relating to the design and installation of rooftop equipment support systems; design engineering services relating to rooftop equipment support systems; all the aforementioned services being for use in the support of plant, equipment, safe access systems and associated building servicesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Jun 4, 202671AGREGISTERED-SEC.71 ACCEPTED
Jun 1, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Feb 6, 2026ES71TEAS SECTION 71 RECEIVED
Feb 9, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jul 26, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB
Oct 1, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED
Jun 12, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Apr 29, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Apr 28, 2023INPCINVALIDATION PROCESSED
Mar 22, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Oct 27, 2022RNWLINTERNATIONAL REGISTRATION RENEWED
Sep 2, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED
Jul 22, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Jul 22, 202271.PREGISTERED - PARTIAL SEC 71 ACCEPTED
Jul 19, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Feb 9, 2022ES71TEAS SECTION 71 RECEIVED
Mar 8, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Mar 8, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Mar 8, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
Mar 8, 2021EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
Mar 8, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 8, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Mar 8, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Feb 9, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Aug 3, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED
Aug 19, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Aug 9, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
May 11, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB
May 11, 2016FIMPFINAL DISPOSITION PROCESSED
May 9, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 9, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 24, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 24, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 20, 2015GPNXNOTIFICATION PROCESSED BY IB
Nov 4, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 4, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Nov 4, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 22, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Oct 14, 2015DMCCDATA MODIFICATION COMPLETED
Oct 14, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 13, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 13, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 13, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 17, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 17, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 17, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 25, 2015RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Sep 24, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Sep 18, 2014CHLDCHANGE OF OWNER RECEIVED FROM IB
Jul 12, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jun 25, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 25, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Mar 19, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Mar 14, 2014ALIEASSIGNED TO LIE
Sep 11, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Sep 11, 2013GNSLLETTER OF SUSPENSION E-MAILED
Sep 11, 2013CNSLSUSPENSION LETTER WRITTEN
Aug 20, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 19, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 19, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 19, 2013RFNTREFUSAL PROCESSED BY IB
Feb 19, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Feb 19, 2013RFRRREFUSAL PROCESSED BY MPU
Feb 19, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 18, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2013DOCKASSIGNED TO EXAMINER
Feb 8, 2013DOCKASSIGNED TO EXAMINER
Jan 29, 2013MAFRAPPLICATION FILING RECEIPT MAILED
Jan 25, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 24, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance