Drawing for Serial No. 79124334

USPTO serial 79124334

Serial No. 79124334

Reviewed by CopyMark Law Group

Reg. 4570309Status 706Registered
Filing date
Status date
Registration date
Jul 22, 2014
Examiner
CALLAGHAN, BRIAN P
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with Serial No. 79124334?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew Saunders

Matthew Saunders Saunders & Silverstein LLP14 Cedar Street Suite 224Amesbury, MA 01913United States

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, namely, rooftop mounted building services equipment being metal supports for [ metal pipework, ] metal cable trays/raceways, [ metal conduits, ducting for use in heating, ventilation and air conditioning systems; transportable buildings of metal; ] frameworks of metal for use in the support of heat pumps, variable refrigerant flow (VRF) air conditioning units, chillers for refrigeration and ventilation equipment in the nature of air handling units; stairs and steps of common metal; [ metal ducting for use in the support of heat pumps, ] variable refrigerant flow (VRF) air conditioning units, chillers for refrigeration and ventilation equipment in the nature of air handling units; walkways of common metal; metal railings, protective railings of metal; goods of metal for use in rooftop support systems, namely, metal cross-over platforms, metal walkways, metal platforms [ ; small items of metal hardware, namely, springs, nuts, washers; pipes and tubes of metal ]ACTIVE—
017[ plastic sheets, bars, blocks, pellets, tubes for use in the manufacture of building materials, namely, mounting platforms for the support of light building services equipment, pipe supports, cable tray supports and ductwork supports for heating, ventilation, refrigeration and air conditioning systems and installations and platform bases for the support of solar panels; plastic sheets, bars, blocks, pellets, tubes for use in the manufacture of rooftop equipment support systems; insulating materials; flexible non-metallic pipes ]SECTION 71 - CANCELLED—
019Non-metallic building materials, namely, rooftop mounted building services equipment being supports for pipework, cable trays, raceways, conduits, ducting for use in heating, ventilation and air conditioning systems; non-metallic rigid pipes for building; non-metallic frameworks for use in building; [ non-metallic building materials, namely, stationary pre-fabricated walkways; non-metallic stairs and steps; non-metallic ducting; non-metallic railings; non-metallic protective railings; ] non-metallic goods for use in rooftop equipment support systems, namely, cross-over platforms, platform bases, non-metallic conduits for plumbing and drainage [ ; asphalt, pitch and bitumen; non-metallic transportable buildings ]ACTIVE—
037[ Building services, namely, building construction and repair services; ] building construction [ and repair ] services relating to rooftop equipment support systems [ ; repair, ] installation [ and maintenance ] services relating to rooftop equipment support systemsACTIVE—
042Advisory services, namely, consultation relating to the design of engineering products; design services relating to the design and installation of rooftop equipment support systems; design engineering services relating to rooftop equipment support systems; design services relating to rooftop equipment support systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 26, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 3, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 3, 2026INPCINVALIDATION PROCESSED—
Aug 4, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 4, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Dec 4, 202471AGREGISTERED-SEC.71 ACCEPTED—
Jul 26, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jul 17, 2024ES71TEAS SECTION 71 RECEIVED—
Oct 1, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 22, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 27, 2022RNWLINTERNATIONAL REGISTRATION RENEWED—
Sep 2, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 22, 2022INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Dec 5, 2021INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 5, 2021INPCINVALIDATION PROCESSED—
Oct 25, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 25, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Feb 25, 202171.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Feb 17, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 8, 2021ES71TEAS SECTION 71 RECEIVED—
Jul 22, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 3, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 9, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 15, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 29, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 29, 2014FIMPFINAL DISPOSITION PROCESSED—
Oct 22, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 18, 2014CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jul 22, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 22, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 2, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 2, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 13, 2014GPNXNOTIFICATION PROCESSED BY IB—
May 6, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 6, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 16, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 16, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 16, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 1, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 1, 2014ALIEASSIGNED TO LIE—
Mar 14, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 13, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 7, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 7, 2014ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 11, 2013GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 11, 2013GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 11, 2013CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 20, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 19, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 19, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 10, 2013RFNTREFUSAL PROCESSED BY IB—
Feb 19, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 19, 2013RFRRREFUSAL PROCESSED BY MPU—
Feb 19, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 18, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2013DOCKASSIGNED TO EXAMINER—
Feb 8, 2013DOCKASSIGNED TO EXAMINER—
Feb 5, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 1, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 31, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance