USPTO serial 79125557
E-T-A
Reviewed by CopyMark Law Group
Reg. 4774607Status 706Registered
- Filing date
- Status date
- Registration date
- Jul 21, 2015
- Examiner
- PERKINS, ELLEN J
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with E-T-A?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ralph E. Locher
Ralph E. Locher Lerner Greenberg Stemer LLPPO BOX 2480HOLLYWOOD, FL 33022United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Scientific, nautical, surveying, measuring, signalling, supervisory apparatus and instruments, namely, intelligent bus systems comprised of power modules, electrical circuit breakers, cables, converter connector cables, voltage supply, software, and touch panels based on CAN-Technology and Multiplexing technique for the protection and control of electrical installations in recreational and work boats and vehicles, electrical protection devices, namely, electronic and mechanical protection relays and switchgears for electrically measurable physical dimensions like current, voltage, temperature, frequency, pressure, resistance, power, energy; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electronic circuits, microcircuits, circuit boards, circuit breakers, miniature circuit breaker (MCBs), residual current circuit breakers (RCDs), residual current operated circuit breakers with overcurrent protection (RCBOs), molded-case circuit breakers (MCCBs), remote-controlled circuit breakers, [ arc fault detection and protection devices for AC and DC distribution and generation networks, namely, arc fault circuit breakers (AFCBs), arc fault circuit interrupters (AFCIs), arc fault monitors (AFMs) and related technologies in the nature of arc fault sensors and integrated circuits incorporating arc fault detection algorithms for installation in conventional and renewable energy grids operated by AC or DC including smart grid applications; ] data processing apparatus, computers; computer software for configurating, programming and controlling power distribution systems based on CAN-Technology and Multiplexing technique; computer software for preventing fires by arc fault detection in photovoltaic systems, electric and hybrid vehicles, aircraft on-board electrical systems, and in data processing centers; software for overcurrent and shortcircuit detection in automatic circuit breakers, smart power relays; electrical and electronic apparatus and instruments and parts thereof, in particular circuit breakers for equipment protection, flow-rate meters and current monitors, and electric sensors; electrical and electronic switching, protecting, controlling and measuring devices, namely, electric cut-off switches, disconnectors in the nature of cut-out switches, voltage surge protectors, electric control panels, ohmmeters; electrically remote-controlled switching devices, namely, automatically operated switches, electrically remote-controlled manually operated switches, electrically remote-controlled rocker switches, electrically remote-controlled toggle switches, electrically remote-controlled push button switches, electrically remote-controlled circuit breakers; electric relays; electronic and mechanical switching relays as well as switching amplifiers; electronic, mechatronics-based overcurrent protection, namely, surge protectors, circuit breakers, automatic circuit breakers, electronic circuits; overcurrent circuit breakers; residual current circuit breakers; thermal, thermal-magnetic, magnetic and magnetic-hydraulic circuit breakers for equipment protection; electric circuit breakers and start-up power switches with thermal and electromagnetic triggering; electrical and electronic circuit breakers for land vehicles, aircraft and watercraft; electrical and electronic circuit breakers for motor vehicles, airplanes and ships; motor protection circuit breakers; power circuit breakers; electric overcurrent switches; automatic cut-out switches; high-frequency switches; overvoltage cut-out switches; temperature switches; electric flasher switches; remote controlled power switches; power disconnectors, namely, trip units for circuit breakers and cut-out switches; circuit fuses for motor vehicles, telephone and telegraph systems; devices and systems for the distribution of electrical energy, namely, power transformers, uninterruptible power supplies, electrical conductors for transformers, power distribution units; electric voltage regulators; BUS-controlled shipboard wiring systems, in particular consisting of electric circuit breakers, electric microcontrollers, modules for BUS-coupling; integrated circuits, integrated semiconductor circuits and thick film hybrid circuits; electrical and electronic monitoring equipment, namely, electrometers, digital and analog multimeters; current monitors; voltage monitors; [ flow measuring devices in the nature of flow meters for gaseous, liquid and solid media; ] electric voltmeters | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 16, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 16, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 16, 2025 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 8, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 6, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jul 21, 2024 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Oct 31, 2022 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 26, 2022 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 26, 2022 | INPC | INVALIDATION PROCESSED | — |
| Sep 8, 2022 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Aug 30, 2022 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 30, 2021 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Dec 30, 2021 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Dec 22, 2021 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jul 20, 2021 | PUM1 | OFFICE ACTION ISSUED POU1 | — |
| Jul 19, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 6, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Feb 26, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 21, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 31, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 9, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 9, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 21, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 21, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 5, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 5, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 2, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 15, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 15, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 15, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 30, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 19, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 19, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 19, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 19, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 19, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 22, 2014 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| Sep 22, 2014 | GNCF | CONTINUATION OF FINAL REFUSAL E-MAILED | — |
| Sep 22, 2014 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Aug 28, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 27, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 27, 2014 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 7, 2014 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 23, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 23, 2014 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| May 13, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 13, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 13, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 21, 2014 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Apr 15, 2014 | ALIE | ASSIGNED TO LIE | — |
| Sep 30, 2013 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Sep 30, 2013 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Sep 30, 2013 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Sep 7, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 6, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 6, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 25, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 6, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 6, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 6, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 5, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 1, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 25, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 25, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 22, 2013 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Feb 21, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |