USPTO serial 79125801
SNUGGER
Reviewed by CopyMark Law Group
Reg. 4398357Status 404
- Filing date
- Status date
- Registration date
- Sep 10, 2013
- Examiner
- SWIFT, GILBERT M
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with SNUGGER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Heating apparatus, namely, heating elements, boilers for heating installations; heating installations; heating units for industrial purposes; diesel fuel line heaters; diesel heaters, namely, immersion heaters, water heaters; heaters for vehicles; heating apparatus for vehicles, namely, heaters for caravans and motor homes; heating apparatus for vehicles; heating installations for vehicles; heating apparatus for vehicles operating independently of the engine; heating machines, namely, electric space heaters, water heaters; water heaters; hot-air space heating apparatus for commercial use; hot-air space heating apparatus for industrial use; hot-air space heating apparatus for residential use; air heating furnaces; air heating installations for commercial use; air heating installations for industrial use; air heating installations for residential use; air valves for steam heating installations; apparatus for domestic heating purposes, namely, electric space heaters; apparatus for gas fired heating installations, namely, boilers; apparatus for heating, namely, hot water tanks, steam heating apparatus for industrial purposes; appliances for heating, namely, hot water tanks; boilers being parts of central heating installations; boilers for central heating installations; boilers for use in heating systems; catalytic combustion heating apparatus, namely, combustion chambers; central heating apparatus, namely, furnace boilers, electric boilers; central heating boilers; central heating installations; central heating radiators; closed circuit heating installations; combined heating and air conditioning apparatus, namely, heat sinks for use in heating, cooling and ventilating apparatus; Peltier cooling and heating apparatus; control devices, namely,thermostatic valves for heating installations; control units, namely, thermostatic valves for heating installations; hot water tanks, namely, cylinders for the heating of water; heating dampers, namely, control devices used in air ducts to regulate the flow of air; district heating pipes, namely, pipes for heating boilers; domestic central heating appliances, namely, central heating radiators; domestic heating apparatus, namely, central heating radiators, radiators; domestic heating appliances, namely, central heating radiators, radiators; electric heating apparatus, namely, electric radiators; electric heating apparatus for household purposes, namely, electric radiators; electric heating apparatus for use in industry, namely, electric radiators; electrical heating installations; heat regulator valves being parts of heating installations; hot air heating apparatus, namely, electric heating fans; hot water heating installations; mobile heating apparatus, namely, portable thermal self-heating pouch for the purpose of heating food, heaters for warming up portable toilets in cold weather | SECTION 71 - CANCELLED | — |
| 035 | Retail store services featuring heaters; On-line retail store featuring heaters; mail order services featuring heaters; wholesale store services featuring heaters; on-line wholesale store services featuring heaters; online marketing services of products of others; online promotion of the goods and services of others on a global computer network; demonstration of goods; demonstration of goods and services by electronic means, also for the benefit of so-called teleshopping and homeshopping services; discount services for retail, wholesale and sales promotion services, namely, administration of a program for enabling participants to obtain discounts on products and services; distributor services in the field of heaters; advertising services; advertising services provided over a global communications network; promotional advertising services | SECTION 71 - CANCELLED | — |
| 037 | Installation, maintenance and repair of heaters; repair, maintenance and installation advisory services in the field of heaters; repair, maintenance and installation consultancy services in the field of heaters; repair information; provision of information in relation to the repair, maintenance and installation of heaters; installation, maintenance and repair of heating apparatus; installation, maintenance and repair of diesel heaters; heating apparatus installation and repair; heating equipment installation and repair; installation of apparatus for heating; maintenance and repair of heating installations | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ya Zhang
- Other trademarks owned by Ya Zhang
- Other trademarks owned by YA ZHANG
- Other trademarks in Class 011
- Other trademarks in Class 035
- Other trademarks in Class 037
- Similar marks named SNUGGER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 23, 2023 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Apr 23, 2023 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 27, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 28, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 28, 2022 | INPC | INVALIDATION PROCESSED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Dec 30, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 11, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 11, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 10, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 10, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 25, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 22, 2013 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 5, 2013 | NPUB | NOTICE OF PUBLICATION | — |
| May 17, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 17, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 17, 2013 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| May 17, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 10, 2013 | ALIE | ASSIGNED TO LIE | — |
| May 10, 2013 | PAPER RECEIVED | — | |
| Apr 1, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 13, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 13, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 8, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 8, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 7, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 4, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 4, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 28, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |