USPTO serial 79126344
SONNEVILLE
Reviewed by CopyMark Law Group
Reg. 4535202Status 706Registered
- Filing date
- Status date
- Registration date
- May 27, 2014
- Examiner
- MACIOL II, EUGENE VALENTINE-JO
- Law office
- GENERIC WEB UPDATE
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with SONNEVILLE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
CH-4542 Luterbach, CH
CH-4542 Luterbach, CH
CH-4542 Luterbach, CH
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lawrence R. Robins
Lawrence R. Robins FisherBroyles LLP4 MacQuarrie LaneWestford, MA 01886UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | [ Rubber, gutta-percha, pure gum rubber sheets, asbestos, mica and goods made from these materials, namely, boots and pads for insulating, reducing vibration and noise reduction in railway supports; goods made of semi processed plastics, namely, for insulating, reducing vibration and noise reduction in railway supports; packing and insulating materials, and stopping materials, namely, boots and pads for insulating, reducing vibration and noise reduction in railway supports; flexible pipes, not of metal; rubber parts for railway sleepers, namely, boots and pads for insulating, reducing vibration and noise reduction in railway supports; sock-type elements of rubber, namely, boots for insulating, reducing vibration and noise reduction in railway supports ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metallic building materials, namely, concrete blocks, concrete blocks incorporating a rail fastening system and railway supports; rigid pipes, not of metal, for building; asphalt, pitch and bitumen; transportable buildings, not of metal; monuments, not of metal, concrete building elements, namely, concrete blocks, concrete blocks incorporating a rail fastening system and railway supports, non-metal shuttering for concrete, namely, casting forms, railway sleepers of wood, gravel, cement, sand excluding foundry sand, and concrete ] | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, research, analysis, testing, evaluation, design, and engineering design services in the field of railway track systems, slab track systems and railway support systems; mechanical research and design of land vehicles; industrial analysis and research in the field of railway track systems, slab track systems and railway support systems; design and development of computers and software; industrial design; engineering; surveying; technical research in the field of railway track systems, slab track systems, and railway support systems; construction drafting; testing of materials; quality control for others; technical project study, namely, technical research in the field of railway track systems, slab track systems and railway support systems | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Sonneville AG
- Other trademarks owned by Sonneville AG
- Other trademarks owned by Sonneville AG
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 042
- Similar marks named SONNEVILLE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 4, 2024 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Nov 13, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 12, 2024 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Mar 12, 2024 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Mar 1, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 22, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 27, 2023 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Dec 23, 2022 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 23, 2021 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 28, 2021 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 28, 2021 | INPC | INVALIDATION PROCESSED | — |
| Apr 25, 2021 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 25, 2020 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Aug 25, 2020 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Jul 21, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 26, 2020 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 27, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 23, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 14, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 9, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 9, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 27, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 27, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 11, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 11, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 6, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 19, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 19, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 19, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 3, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 3, 2014 | ALIE | ASSIGNED TO LIE | — |
| Jan 30, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 14, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 14, 2014 | ALIE | ASSIGNED TO LIE | — |
| Jan 14, 2014 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 14, 2014 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 14, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 16, 2013 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 16, 2013 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 16, 2013 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 16, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 16, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 16, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2013 | RFNP | REFUSAL PROCESSED BY IB | — |
| Apr 8, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 8, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 3, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 2, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 26, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 15, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 11, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 7, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |