Drawing for FLEXSILON

USPTO serial 79127094

FLEXSILON

Reviewed by CopyMark Law Group

Reg. 4634650Status 404
Filing date
Status date
Registration date
Nov 11, 2014
Examiner
CLYBURN, CARLA DIONNE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FLEXSILON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines, namely, turbines and turbo compressors, burner, namely, gas burner, oil burner, coal burner, boiler, namely, electric boiler, oil boiler, gas boiler and coal fired boiler, pipelines in the nature of branching pipes of metal, for the chemical and petrochemical industries; Machines, namely, turbines and turbo compressors, burner, namely, gas burner, oil burner, coal burner, boiler, namely, electric boiler, oil boiler, gas boiler and coal fired boiler, pipelines in the nature of branching pipes of metal, for the process engineering industry; Machines, namely, turbines and turbo compressors, burner, namely, gas burner, oil burner, coal burner, boiler, namely, electric boiler, oil boiler, gas boiler and coal fired boiler, pipelines in the nature of branching pipes of metal, for plastic processing and metalworking; Machines, namely, turbines and turbo compressors, burner, namely, gas burner, oil burner, coal burner, boiler, namely, electric boiler, oil boiler, gas boiler and coal fired boiler, pipelines in the nature of branching pipes of metal, for raw material extraction; Machines, namely, turbines and turbo compressors, burner, namely, gas burner, oil burner, coal burner, boiler, namely, electric boiler, oil boiler, gas boiler and coal fired boiler, pipelines in the nature of branching pipes of metal, for oil and natural gas extractionSECTION 71 - CANCELLED—
009Control devices, namely, programmable electronic systems in the nature of an electronic controller and programmable logic controllers for planning, programming, configuring, operating, monitoring, evaluating and visualizing controls, sensors, actuators and drives and for analyzing and planning safety-related control and regulating circuits as well as for calculating the reliability and the probability of failures of devices all for the safe operation of machines as well as of cableways, elevators, escalators and fun rides; control systems consisting of electronic controls, electronic sensors, electric actuators, drives for motors and computer software for the safe operation of conveyor installations and assembly systems; supervision of turbomachine and compressor operation, burner and boiler operation and pipeline systems by means of: 1) measuring of pressure, temperature, vibrations and axial displacements, quantity and concentration of gas and liquids, 2) electronic signaling for detecting and controlling pressure, temperature, vibrations and axial displacements, quantity and concentration of gas and liquids and/or 3) technical checking instruments for measuring, testing and checking the temperature, vibrations and axial displacements, pressure, quantity and concentration of gas and liquids; Electrical devices, namely, programmable electronic systems in the nature of an electronic controller and programmable logic controllers for the control and closed loop control of automation processes; Non-safety-related and safety-related memory-programmable and wiring-programmable hardwired controls for turbomachine and compressor operation, burner and boiler operation and pipeline systems; Programmable electronic control systems consisting of electronic controls, electronic sensors, electric actuators, drives for motors and computer software for planning, programming, configuring, operating, monitoring, evaluating and visualizing controls, sensors, actuators and drives and for analyzing and planning safety-related control and regulating circuits as well as for calculating the reliability and the probability of failures of devices for protection of people, machines and plants in the safety-critical process industry and the machine building industry; Automation systems consisting of industrial automation controls for turbomachine and compressor operation, burner and boiler operation and pipeline systems burner and boiler operation and pipeline systems; turbomachine and compressor operation, burner and boiler operation and pipeline systems for processing engineering and industrial installations and machines; protection and monitoring systems for processing engineering and industrial installations and machines, namely, programmable electronic systems in the nature of an electronic controller and programmable logic controllersSECTION 71 - CANCELLED—
042Development of safety-related and non-safety-related controls, namely, a programmable logic controller; Development of software for programming safety-related and non-safety-related controls; development of automation, protection and monitoring systems for process engineering and industrial installations; technological consultancy with regard to the analysis and solution of safety-related automation tasks; technological consultancy in the field of safety-related and non-safety-related automation solutions as well as planning and implementation thereof; technological consultancy and support with regard to the technical inspection of safety-related automation solutions; technological services, namely, technological integration of safety-related and non-safety-related controls into process control and field systems; scientific and industrial research in the field of safety-related and non-safety-related controls, and the programming and integration thereofSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 8, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
May 8, 2023DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 6, 2023LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Nov 12, 2022LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jul 17, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 19, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 19, 2022INPCINVALIDATION PROCESSED—
Jan 28, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 28, 2021C71TCANCELLED SECTION 71—
Nov 11, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 24, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 18, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 3, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 3, 2015FIMPFINAL DISPOSITION PROCESSED—
Feb 11, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 8, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Nov 11, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 18, 2014OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 3, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 3, 2014OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 26, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 22, 2014GPNXNOTIFICATION PROCESSED BY IB—
Aug 6, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 6, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 6, 2014NPUBNOTICE OF PUBLICATION—
Jul 22, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 16, 2014ALIEASSIGNED TO LIE—
Jun 30, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 7, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 7, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 5, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 5, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 5, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 5, 2013CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 5, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 8, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 8, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 8, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 29, 2013RFNPREFUSAL PROCESSED BY IB—
Apr 11, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 11, 2013RFRRREFUSAL PROCESSED BY MPU—
Apr 10, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 9, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 1, 2013DOCKASSIGNED TO EXAMINER—
Apr 1, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 28, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance