USPTO serial 79128059
D
Reviewed by CopyMark Law Group
Reg. 4541057Status 707Registered
- Filing date
- Status date
- Registration date
- Jun 3, 2014
- Examiner
- ROACH, APRIL K
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with D?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
J. Michael Hurst
J. Michael Hurst Keating Muething & Klekamp PLLOne East Fourth Street, Suite 1400Cincinnati, OH 45202United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Metal cables, namely, non-electric metal cables ] | SECTION 71 - CANCELLED | — |
| 007 | [ Elevators ] | SECTION 71 - CANCELLED | — |
| 009 | Electrical cables, optical cables, fibre optic cables, electricity terminals being electrical terminal blocks; industrial electricity plants consisting of distribution stations, switching stations and main grids used for the production and distribution of electricity, namely, distribution boxes, electric current switches, and electric grid circuit boards; apparatus and instruments for the production and distribution of electricity for electricity distribution networks, namely, electrical distribution boxes, solar panels for the production of electricity; apparatus and instruments for checking supervision, remote control, controlling and measuring of electricity and energy consumption and for remote controlling of power plants, namely, electric meters, electronic controllers, voltage regulators; electrical connectors and electric transformers, not of metal, for electric pipes; computers for data processing and recorded computer programs for use in the production, distribution and control of energy and electricity; solar cells and solar batteries for the generation of electricity and energy; land surveying instruments, namely, global positioning instruments, cameras connected to the Internet and theodolites; time detectors and alarm installations for industrial purposes and for use in energy production and distribution, namely, timing sensors, security and fire alarms; electronic elevator control panels | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by PRYSMIAN S.P.A.
- Other trademarks owned by DRAKA KABEL B.V.
- Other trademarks owned by DRAKA KABEL B.V.
- Other trademarks owned by DRAKA KABEL B.V.
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Similar marks named D
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 27, 2026 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jul 20, 2026 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jul 17, 2026 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 17, 2026 | INPC | INVALIDATION PROCESSED | — |
| Dec 24, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 21, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 24, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Apr 24, 2025 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Apr 23, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Apr 21, 2025 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| Apr 20, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 3, 2024 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 3, 2023 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Dec 23, 2022 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Nov 20, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 20, 2019 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Sep 20, 2019 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 20, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 29, 2019 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jun 3, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 3, 2018 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 14, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 28, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 28, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 3, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 3, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 18, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 18, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 13, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 26, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 26, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 26, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 7, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 7, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 6, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 6, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 6, 2014 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 8, 2013 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 8, 2013 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 8, 2013 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 31, 2013 | DMCC | DATA MODIFICATION COMPLETED | — |
| Oct 31, 2013 | ALIE | ASSIGNED TO LIE | — |
| Oct 30, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 30, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 30, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 1, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 19, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 1, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 1, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 30, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 29, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 23, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 23, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 19, 2013 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Apr 18, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |