Drawing for SICCAST

USPTO serial 79128115

SICCAST

Reviewed by CopyMark Law Group

Reg. 4541059Status 706Registered
Filing date
Status date
Registration date
Jun 3, 2014
Examiner
CARLSON, KRISTIN
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SICCAST?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James F. Struthers

James F. Struthers Richard Law Group5910 N Central Expy Ste 325Dallas, TX 75206United States

Goods and services

ClassDescriptionStatusFirst use
007Machine parts, namely, machine housings; pumps, namely, bilge pumps, centrifugal pumps, compressed air pumps, electric pumps, fuel pumps for service station, high-pressure pumps for washing appliances and installations, hydraulic pumps, lubricating pumps, macerator pumps, multiphase screw pumps, oil drain pumps, pneumatic pumps, positive displacement pumps, pumps as parts of machines, motors and engines, pumps for cooling engines, pumps for machines, rotary pumps, screw pumps, sewage pumps, silt pumps, sludge pumps, submersible pumps, suction pumps, vacuum pumps, vertical turbine pumps, windmill pumps; motors and engines, other than for land vehicles; [ machine couplings and belts, other than for land vehicles; ] parts of pumps, namely, impeller as parts of pumps, wear plates as parts of pumps, volute casings as parts of pumps, covers as parts of pumps; parts of machines, motors, engines, [ and couplings, ] namely, [ bearings as parts of machines, centering drilling bits being parts of machines, ] compressors as parts of machines, motors and engines; [ machine parts, namely, couplers and semi couplers of synthetic material, pulleys being parts of machines; shaft couplings as parts of machines; driving motors, other than for land vehicles; ] mine working machines, namely, [ excavators, drag-line-excavators, hoisting machines, locomotive cranes, ] shuffling machines, power shovels, [ lock handling machines, ] conveyors and graders; replacement parts for machines, namely, replacement parts of pumps, replacement parts for [ trench excavators, drag-line excavators, hoisting machines, locomotive cranes, ] shoveling machines, power shovels [ and log handling machines, ] namely, chassis parts, hydraulic and pneumatic parts; mechanical seals for pumps, [ motors and engines; speed regulators for machines, motors and engines, other than land for vehicles; ] pneumatic transporters; compressed air machines; compressed air motors, other than for land vehicles; compressed air pumps; pressure valves being machine parts; ejectors, namely, steam jet air ejectors, pneumatic ejectors, ejectors as parts of machines; [ filters for machines, namely, filter for machines in the mining industry; filters for motors and engines; ] blowing machines for the compression, suction and transport of gases, [ gear boxes, other than for land vehicles; ] machine parts, namely, molds for use in the manufacture of machine parts, spare parts; [ taps being parts of machines, motors and engines; ] compressors, namely, air compressors, [ air compressors for vehicles, ] compressor cleaning machines, [ compressors for air conditioners, compressors for dehumidifying machines, ] compressors for machines, compressors for recovering and recycling refrigerant gases, [ electric compressors; electronically and power-operated tools, namely, pullers and components therefor, nut splitters, extractors, separators, spanners and coil spring compressors; ] gas compressors; parts for compressed-air tools, namely, [ brakes, filters, hoses, ] pipes, couplings valves, [ switches, compressors, clamping tools ] and injectors; [ pond and water garden aeration systems comprising water pumps, air compressors, air blowers and a finned wheel for pressurizing and aerating ponds and aquariums; ] protective metal containers being parts of gas compressors, pumps and compressors as parts of machines, motors and engines; [ refrigerator compressors; variable speed scroll compressors for air conditioners and heat pumps; vehicle pneumatic and hydraulic compressors; condensing installations, namely, air-cooled condensers, axial fan condensers, centrifugal fan condensers, mechanical condensers; speed regulators for motors and engines, other than for land vehicles; regulators being machine parts; ] pneumatic tube conveyors; suction machines for industrial purposes, namely, air suction machines, suction pumps; [sliders being machine parts, namely, back sliders, telescope sliders; control mechanisms for machines, motors or engines, namely, hydraulic and pneumatic control mechanisms for machines, motors or engines; turbines, other than for land vehicles; turbo compressors for machines; ] crushing machines for industrial purposes; dust removal machines; sewage pulverizersACTIVE—
019Building materials, not of metal, namely, [ soffits, ] plastic pipes supports, [ cellular PVC trim, composite panels composed primarily of non-metal materials, gypsum, lime, shutters, shingles, siding, trim; ] pipes, not of metal, for building purposes; [ asphalt, pitch and bitumen; ] non-metal mineral castings; [ transportable buildings, not of metal; ] monuments, not of metal; nonmetal beams; decorative and architectural moldings, not of metal; foundry molds for use in building, not of metal; [ potter's clay being raw material; fittings, namely, non-metal pipe fittings for rigid pipes, non-metal pipe fittings, namely, rosettes for rigid pipes, non-metal pipe fittings for compressed air pipes, pipe fittings comprised primarily of plastic, nonmetal pipe couplings and joints; ] semi-prepared and prepared products of mineral cast, namely, non-metallic minerals for building or construction, [ mineral pellets for use in the building industry, ] non-metal rigid pipesACTIVE—
037Installation and maintenance of mechanical equipment, in particular of pumps; cleaning of mechanical equipment, in particular of pumps; repair and maintenance of mechanical equipment, in particular of pumps, heating installations, air conditioning installations, [ refrigerating installations] and ventilating installations; installation, maintenance and repair of machinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 5, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Oct 30, 2025INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 30, 2025INPCINVALIDATION PROCESSED—
Sep 14, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 14, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 8, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 7, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 7, 202471AGREGISTERED-SEC.71 ACCEPTED—
Oct 7, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 27, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 21, 2024ES71TEAS SECTION 71 RECEIVED—
Jun 3, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 29, 2022RNWLINTERNATIONAL REGISTRATION RENEWED—
Feb 13, 2021NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Feb 13, 2021C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Dec 9, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 9, 2020ES75TEAS SECTION 71 & 15 RECEIVED—
Jun 3, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 29, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 5, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 14, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 28, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 28, 2014FIMPFINAL DISPOSITION PROCESSED—
Sep 3, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 3, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 18, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 13, 2014GPNXNOTIFICATION PROCESSED BY IB—
Feb 26, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 26, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 26, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 8, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 8, 2014ALIEASSIGNED TO LIE—
Jan 21, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 21, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Jan 21, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 21, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 21, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 7, 2014GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 7, 2014GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 7, 2014CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 18, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 18, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 18, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 12, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 12, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 12, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2013CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
Oct 20, 2013CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Oct 18, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 19, 2013RFNTREFUSAL PROCESSED BY IB—
May 2, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 2, 2013RFRRREFUSAL PROCESSED BY MPU—
May 2, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 1, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 27, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 23, 2013DOCKASSIGNED TO EXAMINER—
Apr 23, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 18, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance