USPTO serial 79128678
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
JONATHAN MYERS KF ROSS, P.C.5720 MOSHOLU AVE.P.O. BOX 900BRONX, NY 10471-0900| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for the metallurgical industry, namely, machines for filling and emptying blast furnaces, machines for tilting, pivoting, and moving converters and ladles; machines for the steel mill industry, namely, machines for filling and emptying furnaces, machines for tilting, pivoting, and moving converters and ladles; continuous casting machines; rolling machines for rolling metals; forging machines; presses for metals; machines for working and processing plastics; machine tools for metalworking; parts of the foregoing machines, namely, clutches and couplings and devices for power transfer of the aforementioned machines; motors and engines except engines for land vehicles; machine couplings and transmission components except such for land vehicles | SECTION 71 - CANCELLED | — |
| 009 | Electrical and electronic regulating and steering devices and apparatus for machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, and for presses for metals; weighing, measuring, signaling, checking, and supervision apparatus and instruments, namely, video cameras, displays, namely, electric luminescent display panels, light emitting diode displays, liquid crystal displays, strip tension dynamometers, strip tensioning laboratory blades, strip flatness meters, thermometers, speedometers, pressure gauges, angle gauges, distance meters, roughness gauges, electric and electronic control devices, namely, flatness control, roughness control, pressure control and tensioning control for influencing the properties of rolled steel, signal processors; data-processing devices and computers for the metallurgical industry and the steel mill industry; computer programs stored on data carriers for controlling of machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, and for presses for metals | SECTION 71 - CANCELLED | — |
| 011 | Furnaces for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, for forging and pressing plants; cooling systems for machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, for presses for metals; drying, ventilation, and water supply equipment and apparatus, namely, drying, ventilating fans and louvers and cooling water circuit installations in the nature of cooling towers for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, and for forging and pressing plants | SECTION 71 - CANCELLED | — |
| 037 | Installation, assembly, repair and maintenance of industrial and machinery systems, namely, of machines for the metallurgical industry, of machines for the steel mill industry, of continuous casting machines, of rolling machines for rolling metals, of forging machines, of presses for metals, of machines for the working and processing plastics, of machine tools, of engines and motors except engines for land vehicles, of machine couplings and transmission components except such for land vehicles, as well as of furnaces for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, for forging and pressing plants, of cooling systems for machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, for presses for metals, of drying, ventilation, and water supply equipment and apparatus for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, and for forging and pressing plants; construction consultation | SECTION 71 - CANCELLED | — |
| 042 | Building and construction planning, technical construction consultancy, engineering; design and development of computer software for the metallurgical industry and the steel mill industry; technical consultancy in relation to technical research in the field of machines and machine parts for the treatment and processing of metals | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 17, 2023 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 17, 2023 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 12, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 7, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 7, 2022 | INPC | INVALIDATION PROCESSED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Nov 26, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 24, 2016 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 23, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 2, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 2, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 26, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 26, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 16, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 10, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 10, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 28, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 21, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 7, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 5, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 25, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 25, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 23, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jul 22, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 19, 2013 | CRSN | CORRECTION SENT TO IB | — |
| Jun 19, 2013 | CRCR | CORRECTION CREATED FOR IB | — |
| Jun 5, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 16, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 16, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 16, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 15, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 7, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 3, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| May 3, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 2, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |