Drawing for X-CELLIZE

USPTO serial 79128678

X-CELLIZE

Reviewed by CopyMark Law Group

Reg. 4438137Status 404
Filing date
Status date
Registration date
Nov 26, 2013
Examiner
SNAPP, TINA LOUISE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with X-CELLIZE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jonathan Myers

JONATHAN MYERS KF ROSS, P.C.5720 MOSHOLU AVE.P.O. BOX 900BRONX, NY 10471-0900

Goods and services

ClassDescriptionStatusFirst use
007Machines for the metallurgical industry, namely, machines for filling and emptying blast furnaces, machines for tilting, pivoting, and moving converters and ladles; machines for the steel mill industry, namely, machines for filling and emptying furnaces, machines for tilting, pivoting, and moving converters and ladles; continuous casting machines; rolling machines for rolling metals; forging machines; presses for metals; machines for working and processing plastics; machine tools for metalworking; parts of the foregoing machines, namely, clutches and couplings and devices for power transfer of the aforementioned machines; motors and engines except engines for land vehicles; machine couplings and transmission components except such for land vehiclesSECTION 71 - CANCELLED
009Electrical and electronic regulating and steering devices and apparatus for machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, and for presses for metals; weighing, measuring, signaling, checking, and supervision apparatus and instruments, namely, video cameras, displays, namely, electric luminescent display panels, light emitting diode displays, liquid crystal displays, strip tension dynamometers, strip tensioning laboratory blades, strip flatness meters, thermometers, speedometers, pressure gauges, angle gauges, distance meters, roughness gauges, electric and electronic control devices, namely, flatness control, roughness control, pressure control and tensioning control for influencing the properties of rolled steel, signal processors; data-processing devices and computers for the metallurgical industry and the steel mill industry; computer programs stored on data carriers for controlling of machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, and for presses for metalsSECTION 71 - CANCELLED
011Furnaces for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, for forging and pressing plants; cooling systems for machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, for presses for metals; drying, ventilation, and water supply equipment and apparatus, namely, drying, ventilating fans and louvers and cooling water circuit installations in the nature of cooling towers for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, and for forging and pressing plantsSECTION 71 - CANCELLED
037Installation, assembly, repair and maintenance of industrial and machinery systems, namely, of machines for the metallurgical industry, of machines for the steel mill industry, of continuous casting machines, of rolling machines for rolling metals, of forging machines, of presses for metals, of machines for the working and processing plastics, of machine tools, of engines and motors except engines for land vehicles, of machine couplings and transmission components except such for land vehicles, as well as of furnaces for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, for forging and pressing plants, of cooling systems for machines for the metallurgical industry, for machines for the steel mill industry, for continuous casting machines, for rolling machines for the rolling of metals, for forging machines, for presses for metals, of drying, ventilation, and water supply equipment and apparatus for metallurgical plants, for steel mills, for continuous casting plants, for rolling mills, and for forging and pressing plants; construction consultationSECTION 71 - CANCELLED
042Building and construction planning, technical construction consultancy, engineering; design and development of computer software for the metallurgical industry and the steel mill industry; technical consultancy in relation to technical research in the field of machines and machine parts for the treatment and processing of metalsSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 17, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Jun 17, 2023DETHDEATH OF INTERNATIONAL REGISTRATION
Mar 12, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB
Feb 7, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Feb 7, 2022INPCINVALIDATION PROCESSED
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Feb 26, 2021C71TCANCELLED SECTION 71
Nov 26, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Mar 24, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
May 23, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB
May 2, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB
May 2, 2014FIMPFINAL DISPOSITION PROCESSED
Feb 26, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Nov 26, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 16, 2013GPNXNOTIFICATION PROCESSED BY IB
Sep 10, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Sep 10, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 28, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Aug 28, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Aug 21, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Aug 7, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Aug 5, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 25, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 25, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 23, 2013ALIEASSIGNED TO LIE
Jul 22, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 19, 2013CRSNCORRECTION SENT TO IB
Jun 19, 2013CRCRCORRECTION CREATED FOR IB
Jun 5, 2013RFNTREFUSAL PROCESSED BY IB
May 16, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 16, 2013RFRRREFUSAL PROCESSED BY MPU
May 16, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 15, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 7, 2013MAFRAPPLICATION FILING RECEIPT MAILED
May 3, 2013DOCKASSIGNED TO EXAMINER
May 3, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 2, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance