USPTO serial 79129473
BULLFLEX
Reviewed by CopyMark Law Group
Reg. 4541084Status 706Registered
- Filing date
- Status date
- Registration date
- Jun 3, 2014
- Examiner
- TANNER, MICHAEL R
- Law office
- GENERIC WEB UPDATE
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with BULLFLEX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
TERRENCE L.B. BROWN
TERRENCE L.B. BROWN FRESH IP PLC11710 Plaza America Drive, Suite 2000Reston, VA 20190UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | Flexible hoses of silicone rubber reinforced with fabric | ACTIVE | — |
| 019 | Non-metallic stabilization fabrics for use in construction, namely, geotextile fabrics for use in civil engineering, erosion control fabric for construction use, round woven hoses filled with earth material and seed for erosion control; non-metallic woven materials for use in buildings, namely, woven textile fabrics for use in protection against erosion; erosion control sheeting or fabric for construction use; shapeable reinforcement fabric for construction purposes, namely, shapeable fabric reinforcing or structural members and columns fillable with grout for cavity filling or closure of temporary openings; flexible building and civil engineering construction elements being wholly or principally non-metallic and for reinforcing purposes, namely, non-metal architectural and structural columns made of round woven textile fabric filled with grout | ACTIVE | — |
| 024 | Industrial fabrics, namely, fabric curtains for mining and industrial uses; fabrics made from nylon other than for insulation purposes | ACTIVE | — |
| 037 | [Concrete sealing; construction of civil engineering structures by forming concrete, namely, concrete pouring and forming for buildings and other commercial or public concrete structures; construction services, namely, forming columns made of grout filled fabric-hose for underpinnings and cushions to close gaps and forming combinations of columns and cushions to build dams underground; underwater construction services; construction services in the nature of building sealing services; irrigation devices installation and repair; building insulating, namely, installation of cushions made of fabric and filled with grout for permanent leveling of floated caissons and grounded barges; pier breakwater construction; construction of ports; construction information, namely, building construction information; construction of structural piles for others; construction of reinforcing structural piles for others; construction of structural pile reinforcement bandages made of fabric and filled with grout for the reinforcement of damaged marine piles for others] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BuM Beton- und Monierbau GmbH
- Other trademarks owned by BuM Beton- und Monierbau GmbH
- Other trademarks owned by BuM Beton- und Monierbau GmbH
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 024
- Other trademarks in Class 037
- Similar marks named BULLFLEX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 15, 2024 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jun 14, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 1, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Oct 1, 2023 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 17, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 3, 2023 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| May 5, 2023 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jul 7, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 7, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 7, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 7, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 23, 2021 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 21, 2021 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 21, 2021 | INPC | INVALIDATION PROCESSED | — |
| Apr 17, 2021 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 17, 2020 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Aug 17, 2020 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jul 21, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 22, 2020 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Mar 5, 2015 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Nov 14, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 28, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 28, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 3, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 3, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 18, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 13, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 26, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 26, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 26, 2014 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 11, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 10, 2014 | ALIE | ASSIGNED TO LIE | — |
| Jan 22, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 3, 2014 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jan 2, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 2, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 9, 2013 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Dec 7, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 6, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 6, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 6, 2013 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jun 24, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 6, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 6, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 4, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 3, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 28, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 22, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| May 22, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 16, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |