Drawing for MBB

USPTO serial 79130743

MBB

Reviewed by CopyMark Law Group

Reg. 4541119Status 404
Filing date
Status date
Registration date
Jun 3, 2014
Examiner
MITTLER, KEVIN A
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MBB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

William H. Brewster

William H. Brewster Kilpatrick Townsend & Stockton LLP1100 Peachtree Street, Suite 2800Atlanta, GA 30309UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Building construction; installation services of building scaffolds, working and building platforms; exterior surface cleaning of buildings; providing information in the field of construction; dry cleaning; factory construction; pipeline construction and maintenance; irrigation devices installation and repair; fire alarm installation and repair; heating equipment installation and repair; air conditioning apparatus installation and repair; freezing equipment installation and repair; furnace installation and repair; machinery installation, maintenance and repair; repair, namely, repair and maintenance of nuclear power reactors and electric power supply installations; rustproofing, drilling of deep oil or gas-wells; rebuilding machines that have been worn or partially destroyed; rebuilding automobile engines that have been worn or partially destroyed; burner maintenance and repair; construction consultingSECTION 71 - CANCELLED—
039Transportation and storage of goods; transportation and distribution of energy, electricity, gas, heating and/or district heating, compressed air, and/or water; transport of gases, liquids and solids by pipeline; towing by motor vehicles, transport of persons and goods by road, rail, water and air; loading and unloading of freight on ships; storage of goods and furniture; garage and parking space rental; car rental, packaging of goods for transportation; storage of goodsSECTION 71 - CANCELLED—
040Treatment of materials by laser beam; waste treatment; providing material treatment information; dyeing services; decontamination of hazardous materials; processing of oil; production of energy; generation of electricity; metal tempering; composting of waste and rubbish; food and drink preservation; treatment of plastic materials; metal treating; recycling of waste and trash; sorting of waste and recyclable material (transformation); incineration of waste and trash; rental of generators; destruction of waste and trash; water treating; custom manufacturing, namely, molding of plastics for othersSECTION 71 - CANCELLED—
042Provision of technical advice in relation to green energy projects; conducting of technical project feasibility studies; conducting of technical project feasibility studies related to real estate; analysis for oil-field exploitation; providing of geological expertise, namely, geological estimations and research; oil-field surveys; consulting services in the field of energy technology, namely, drawing up of expert technical and scientific opinions; chemical research; physics research; oil well testing; research in the field of environmental protection; environmental assessment services; construction and design planning of oil wells; materials testing; chemical and physical analysis of waste and residual materials from refuse incinerators, power plants, and/or water conditioning installations; chemistry services, namely, research and consultation; engineering services, namely, design for others in the field of environmental engineering; research in the field of bacteriology, chemistry and physics; computer programming; leasing of data processing systems; providing technological advice and technical and construction drafting and/or development of installations for generating, transforming, distributing and storing power, in particular power produced by sustainable or alternative means; research in relation to generating, transforming, distributing and storing power, in particular power produced by sustainable or alternative means; mechanical engineering in the field of cleanroom technology, climatic technology, energy technology, thermal engineering, and/or environmental engineering; structural and civil engineeringSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 17, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 17, 2023DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 13, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 17, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 17, 2022INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Oct 24, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 3, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 21, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 3, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 3, 2014FIMPFINAL DISPOSITION PROCESSED—
Sep 3, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 3, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 18, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 14, 2014GPNXNOTIFICATION PROCESSED BY IB—
Feb 26, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 26, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 26, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 11, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 8, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 3, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 3, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 3, 2014ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 24, 2014GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 24, 2014GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 24, 2014CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 7, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 7, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 27, 2013ALIEASSIGNED TO LIE—
Dec 5, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 5, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 5, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2013RFNTREFUSAL PROCESSED BY IB—
Jun 19, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 19, 2013RFRRREFUSAL PROCESSED BY MPU—
Jun 19, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 18, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 18, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 14, 2013DOCKASSIGNED TO EXAMINER—
Jun 14, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 13, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance