Drawing for SGL STADIUM GROW LIGHTING

USPTO serial 79131822

SGL STADIUM GROW LIGHTING

Reviewed by CopyMark Law Group

Reg. 4541154Status 404
Filing date
Status date
Registration date
Jun 3, 2014
Examiner
BROWN, TINA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SGL STADIUM GROW LIGHTING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael C. Cerrati

Michael C. Cerrati BELZER PC2905 Bull StreetSavannah, GA 31405UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Transportable buildings of metal; structures of metal, namely, portable metal structures with heating and light sources for agricultural use; non-electric cables and wires of common metal; pipes and tubes of metal; goods of common metal, namely, baskets of common metals, boxes of common metal, common metal drawer pulls; common metals and their alloys; metal building materials, namely, metal building flashing, soffits and fascia; parts for the aforesaid goods, namely, metal valves not being parts of machines, metal tubes and metal cladding for construction and buildingSECTION 71 - CANCELLED—
009Measuring, regulating and analysis apparatus and instruments, namely, distance measuring apparatus, oxygen regulators, air analysis apparatus; instruments and apparatus for measuring light, CO2, air temperature, soil temperature, humidity and soil moisture, namely, air analysis apparatus, soil sampling equipment in the nature of tubular liners or tubular sleeves and thermometers; soil, light and temperature sensors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, adapters, electricity limiters and electricity conduits; data processing apparatus; control apparatus for lighting apparatus and lighting systems in the nature of electronic ballasts, namely, lighting controls, lighting control apparatus, lighting control panels; parts for the aforesaid goods, namely, electronic control gears (ECGs) for LED lamps and light fixtures, computer operating software and adaptersSECTION 71 - CANCELLED—
011Apparatus for lighting and lighting systems, including for agriculture, horticulture and forestry, namely, electric lighting fixtures, arc lamps and electric torches for lighting; apparatus for assimilation lighting, namely, electric lighting fixtures, lamps, electric lamps and halogen lamps; assimilation lamps; growth lamps; light, lamp and vehicle reflectors and lighting fittings, namely, electric light bulbs; parts for the aforesaid goods, namely, LED light bulbs, light diffusers and light shadesSECTION 71 - CANCELLED—
044Agriculture and forestry services, namely, vermin exterminating for agriculture, horticulture and forestry, agricultural advice and rental of agricultural equipment; horticulture services; consultancy relating to the optimal cultivation of grass and other crops on the basis of a lighting plan, including on the application and use of lighting apparatus, lighting systems for agriculture, horticulture and forestry and assimilation lighting; the cultivation, growing and breeding of agricultural, horticultural and forestry products, namely, grass; advice, consultancy and information regarding the aforesaid services, including, via electronic networks such as the Internet; landscaping, namely, landscape design, landscape gardening and yard care services relating to the laying and maintenance of sports fields, lawns and green areas, as well as care thereofSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 8, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 8, 2023DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 13, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 19, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 19, 2022INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 13, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 26, 2021C71TCANCELLED SECTION 71—
Jun 3, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 20, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 20, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 19, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 8, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 22, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 22, 2014FIMPFINAL DISPOSITION PROCESSED—
Sep 3, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 3, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 11, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 18, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 14, 2014GPNXNOTIFICATION PROCESSED BY IB—
Feb 26, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 26, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 26, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 11, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 10, 2014ALIEASSIGNED TO LIE—
Jan 22, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 17, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 16, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 16, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 4, 2013RFNTREFUSAL PROCESSED BY IB—
Jul 17, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 17, 2013RFRRREFUSAL PROCESSED BY MPU—
Jul 17, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 16, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 10, 2013DOCKASSIGNED TO EXAMINER—
Jul 9, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 4, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance