Drawing for VEFA

USPTO serial 79132413

VEFA

Reviewed by CopyMark Law Group

Reg. 4453066Status 404
Filing date
Status date
Registration date
Dec 24, 2013
Examiner
JACKSON, STEVEN W
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VEFA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; transportable buildings of metal; materials of metal for sheltering, preserving, protecting, covering, wrapping, surrounding, storing or placing purposes, including metal ladders; materials of metal for sifting, filtering; metal doors, windows, shutters, jalousies and their frames and handles, excluding locks and handles; non-electric cables and wires of metal; ventilation channels, inlets, inlet taps, diffusers, pipes, chimney cowls, chimney caps and grids for ventilation, heating, canalization, telephone, underground electricity and air condition installations; materials of metal for notation, guidance, designation, introduction, namely, signboards, clipboards, plates; materials of metal for railroads, namely, tracks, rail bars; bollards and buoys of metal, pontoons of metal, anchors for sea vehicles; moulds of metal for casting excluding the machine parts; works of art of common metal and their alloys; metal manhole covers, bottle taps of metal; advertisement columns of metal; pallets of metal for lifting, loading and transferring, ropes of metal, hangers, bindings, columns, belts, bands, and ribbons of metal for lifting and carriage of cargoSECTION 71 - CANCELLED—
019formless structure, namely, cement, lime, plaster, sand, gravel, pebble, mosaic, stone chips, natural stones, artificial stones, building, road construction materials, namely, asphalt, tar, pitch, bitumen, coal tar, used for building, road construction, repair, coating; formed structure, namely, concrete panels, concrete pipes, walls, girders, columns, concrete boards, quarries, tiles, bricks, roof tiles, building, road construction materials, structures, namely, transportable buildings made of concrete, made of wood, made of plastic, made of synthetic prefabric buildings made of concrete, made of wood, made of plastic, made of synthetic cabinettes made of wood, plastic, concrete; masts, barriers made from concrete, plaster, earth, clay, sand, natural stone, artificial stone, wood, plastic or synthetic materials; signs, non-luminous and non-mechanical, not of metal, for roads; monuments, sculptures made from concrete, stone or marbles; floor tiles not of metal, doors and windows not of metal; parquet floor boards; heat adhesive synthetic coatings; pitched cardboard for roofs; pitched coatings, namely, quarries, tiles, curbstones; glass products for construction, namely, glass bricks, window glasses, door glasses, double-glasses; non-metallic prefabricated swimming pools; aquarium sandSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 21, 2023DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
May 21, 2023DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 7, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 14, 2022XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Feb 14, 2022XXCRGENERIC MADRID TRANSACTION CREATED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Jun 6, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 19, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 19, 2014FIMPFINAL DISPOSITION PROCESSED—
Mar 24, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 24, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 8, 2013GPNXNOTIFICATION PROCESSED BY IB—
Oct 8, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 18, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 18, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 18, 2013NPUBNOTICE OF PUBLICATION—
Sep 5, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 29, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 27, 2013DMCCDATA MODIFICATION COMPLETED—
Aug 26, 2013ALIEASSIGNED TO LIE—
Aug 14, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2013RFNTREFUSAL PROCESSED BY IB—
Jul 25, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 25, 2013RFRRREFUSAL PROCESSED BY MPU—
Jul 20, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 19, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 17, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 13, 2013DOCKASSIGNED TO EXAMINER—
Jul 13, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 11, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance