Drawing for SE ENERGY

USPTO serial 79133331

SE ENERGY

Reviewed by CopyMark Law Group

Status 401
Filing date
Status date
Registration date
Examiner
CLARKE, NANCY
Law office
TMEG LAW OFFICE 102 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SE ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Wind-powered machines; turbines, in particular wind turbines (except for land vehicles); parts and accessories (included in this class) for such wind-powered machines, in particular rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power generatorsSECTION 70 - CANCELLED
009Switch cabinets (electric installation material) as well as therein contained electrical and electronic instruments and apparatus for recording, processing, storage and transmission of data; switch cabinets (electric installation material) as well as therein contained electrical and electronic control apparatus and instruments; electrical and electronic regulating apparatus; electrical and electronic regulating, checking (supervision), control and monitoring apparatus and instruments; data processing equipment, computer and computer software; interface apparatus and interface programs for computers; voltage surge protectors; vibration sensors; watt-hour meters; inverter units (electric converters); electric transformers; all afore-mentioned goods for wind power plants and wind farmsSECTION 70 - CANCELLED
035Professional business consultancy with regard to wind power plants and wind farmsSECTION 70 - CANCELLED
037Building construction in the field of wind power plants; installation services; maintenance services, rebuilding machines that have been worn or partially destroyed; maintenance and repair of wind power plants; assembly services relating to the installation of rotor blades for othersSECTION 70 - CANCELLED
042Remote maintenance (remote control and remote monitoring) through computerised retrieval of wind power plants and wind farms, in particular via the Internet; conducting technical measurements, inspections and calculations in the field of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; technical planning and development as well as technical project management and consultancy therefor in the field of wind power plants; engineering services for calculation, dimensioning and design of rotor blades; technical research for wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; technical condition monitoring of rotor bladesSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2014DETHDEATH OF INTERNATIONAL REGISTRATION
Sep 1, 2013RFNTREFUSAL PROCESSED BY IB
Aug 13, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 13, 2013RFRRREFUSAL PROCESSED BY MPU
Aug 12, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 11, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 6, 2013MAFRAPPLICATION FILING RECEIPT MAILED
Aug 2, 2013DOCKASSIGNED TO EXAMINER
Aug 2, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 1, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance