USPTO serial 79133332
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anna Kurian Shaw
Anna Kurian Shaw Hogan Lovells US LLP555 13th Street NWWashington, DC 20004UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Wind-powered machines, namely, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy; turbines, namely, wind turbines; structural parts and accessories for such wind-powered machines, namely, rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power units in the nature of auxiliary power units for supplying electrical power ] | SECTION 71 - CANCELLED | — |
| 009 | [ Switch cabinets, namely, cabinets specifically designed to house electric switches, electrical and electronic instruments and apparatus for recording, processing, storage and transmission of data from wind power plants and wind farms, namely, computer hardware and computer software to measure wind speed, the sun's position, solar radiation flux density, air temperature, air pressure, relative humidity, photovoltaic module temperature, and other data relevant to wind power plants and wind farms, switch cabinets in the nature of electrical and electronic control apparatus and instruments for wind power plants and wind farms, electrical and electronic voltage and current regulators for wind power plants and wind farms, electrical and electronic regulating, checking, supervision, control and monitoring apparatus and instruments for wind power plants and wind farms, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants, data processing apparatus, computer hardware, computer software for operating, monitoring and regulating wind power plants and wind farms; computer software for calculating the dimensions of wind farms and the surrounding land, as well as calculating their efficiency, and computer software for calculating the dimensions of rotors used on the wind mills in wind farms, computer interface boards and graphical user interface software, voltage surge protectors; electronic vibration sensors, measuring apparatus, namely, meters for measuring electricity in watt-hours, inverter units, namely, electric converters and electric transformers, all of the foregoing for wind power plants and wind farms ] | SECTION 71 - CANCELLED | — |
| 035 | [ Professional business consultancy with regard to wind power plants and wind farms ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building construction in the field of wind power plants; installation services, namely, installation of towers, turbines, electrical and computer hardware systems for wind power plants and farms; maintenance and rebuilding of wind powered machines that have been worn or partially destroyed; maintenance and repair of wind power plants; installing rotor blades in wind turbines for others ] | SECTION 71 - CANCELLED | — |
| 040 | [ Production of energy using wind power; generation of electricity using wind power ] | SECTION 71 - CANCELLED | — |
| 042 | [ Remote maintenance, remote control and remote monitoring of wind power plants and wind farms through computerized retrieval of data via the Internet; ] conducting technical measurements, inspections for taking technical measurements, and calculations in the field of wind power plants and wind farms using remote measuring devices in the nature of computer software, as well as aerial digital imaging, to measure the exterior features of wind power plants and wind farms [ ; electronic data storage; surveying, namely, reviewing the engineering data collected in the field of wind power plants and wind farms and analyzing the results of said surveys; design and development of computer software in the field of wind power plants and wind farms; technical consultancy in engineering, engineering services, namely, technical planning and technical development services as well as technical project management of wind power plants projects; new product engineering for others, namely, designing rotor blades for others; technical research in the field of wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; technical quality monitoring services of rotor blades ] | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 13, 2023 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Feb 13, 2023 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 20, 2022 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 26, 2022 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Oct 26, 2022 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Oct 10, 2022 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 16, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 10, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Feb 10, 2022 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Feb 9, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 13, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 15, 2021 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 24, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 4, 2015 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 24, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 8, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 8, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 24, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 24, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 22, 2015 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 7, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 7, 2015 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 9, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 9, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 5, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 19, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 19, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 19, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 4, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 30, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 9, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 8, 2014 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 8, 2014 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 8, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 26, 2014 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 11, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 11, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 11, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 19, 2014 | DMCC | DATA MODIFICATION COMPLETED | — |
| Mar 6, 2014 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 25, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 25, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 18, 2014 | ALIE | ASSIGNED TO LIE | — |
| Feb 13, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 13, 2014 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 13, 2014 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 1, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 13, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 13, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 12, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 11, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 6, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 2, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 2, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 1, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |