Drawing for P&T

USPTO serial 79136100

P&T

Reviewed by CopyMark Law Group

Reg. 4650866Status 706Registered
Filing date
Status date
Registration date
Dec 9, 2014
Examiner
ERVIN, INGA
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with P&T?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ronni S. Jillions

Ronni S. Jillions FisherBroyles LLP1625 K St., NWSuite 550Washington, DC 20006

Goods and services

ClassDescriptionStatusFirst use
007[ Rail road track maintenance machines, namely, ballast cleaning machines, ballast distributing and profiling machines, ballast stabilizing and consolidating machines, track moveable machines for handling ballast, machines for track renewal, machines for renewal of catenary, track grinding machines; rail track building machines, namely, machines for track laying, machines for track welding, machines for installation of catenary; machines for measuring rail track geometry, namely, machines equipped with measuring and recording devices for measuring the track geometry; rail track tamping machines, namely, machines equipped with tamping units for tamping ballast of rail road beds; tamping units and tamping tines for rail track tamping machines for the tamping of rail track ballast beds, ] air filters for motors [, engines ] and air cleaners; [ injection pumps, injection nozzles, fuel filters, ] oil filters, all aforementioned goods for engines excluding those for land and air vehicles; rolling bearings, slide bearings, shafts, shaft seals, [ gear wheels, ] drive wheels, gears, springs, filters, pumps, speed governors, pressure relief valves, [ oil coolers, ] brakes, hydraulic pumps, hydraulic cylinders, [ hydraulic reservoirs, ] hydraulic filters, hydraulic pipes all being parts of machines; hydraulic motors, hydraulic valves, [ power boosters for hydraulic transmission gears, ] all aforementioned goods for machines; motors [ and engines ] except for land vehicles, connecting shafts for machines; hydraulic pumps and hydraulic motors and components thereof; control valves and brake valves for machines; [ air compressors, compressed air reservoirs, ] compressed air machines, namely, compressed air cylinders [ and compressed air motors; ballast conveyors, ballast excavators, parts of the aforementioned goods ]ACTIVE—
009Vehicle dynamics control devices, namely, [ computer software controlled control systems for the optimization of vehicle acceleration, traction control systems, namely, control systems for matching the traction forces exerted on rail tracks by several vehicle chassis, ] electrical memory-programmable control devices, namely, computer hardware * ; * [ , memory-programmable devices, namely, devices for generating subprogrammes for programming automatic processes, ] and memory-programmable electric measuring data acquisition devices in each case for rail track maintenance machines, rail track building machines, machines for measuring rail track geometry and rail track tamping machines, each moveable on rail tracksACTIVE—
037Maintenance, repair and servicing of rail track maintenance machines, rail track building machines, rail track tamping machines and machines for measuring rail track geometryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2026INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Mar 23, 2026INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 10, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 12, 2025NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Jul 23, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jul 23, 202571AGREGISTERED-SEC.71 ACCEPTED—
Jul 23, 2025A7OKAMENDMENT UNDER SECTION 7 - PROCESSED—
Apr 29, 2025EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 10, 2025PRAMPOST REGISTRATION ACTION MAILED - SEC. 7—
Mar 10, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 5, 2024ES7RTEAS SECTION 7 REQUEST RECEIVED—
Oct 13, 2024ES71TEAS SECTION 71 RECEIVED—
Dec 9, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jun 9, 2023RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 2, 2022INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Aug 24, 2022XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Aug 24, 2022XXCRGENERIC MADRID TRANSACTION CREATED—
Jun 27, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 27, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 27, 202171AGREGISTERED-SEC.71 ACCEPTED—
Oct 27, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 20, 2021ES71TEAS SECTION 71 RECEIVED—
Mar 14, 2019CORVREVIEW OF CORRESPONDENCE COMPLETE - INFORMATION MADE OF RECORD—
Jan 25, 2018FAXXFAX RECEIVED—
May 22, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 1, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 1, 2015FIMPFINAL DISPOSITION PROCESSED—
Mar 9, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 26, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 9, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 30, 2014ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Sep 17, 2014ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Aug 19, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 16, 2014GPNXNOTIFICATION PROCESSED BY IB—
Jul 30, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 30, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 30, 2014NPUBNOTICE OF PUBLICATION—
Jul 14, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 14, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 19, 2014ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 19, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 5, 2014MAILPAPER RECEIVED—
Jun 2, 2014FAXXFAX RECEIVED—
Apr 7, 2014CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 4, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 17, 2014PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Mar 4, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 28, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 24, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 9, 2014ACECAMENDMENT FROM APPLICANT ENTERED—
Jan 9, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 30, 2013ALIEASSIGNED TO LIE—
Dec 17, 2013ALIEASSIGNED TO LIE—
Dec 2, 2013MAILPAPER RECEIVED—
Nov 27, 2013FAXXFAX RECEIVED—
Oct 28, 2013RFNTREFUSAL PROCESSED BY IB—
Oct 8, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 8, 2013RFRRREFUSAL PROCESSED BY MPU—
Oct 8, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 7, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 4, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 30, 2013DOCKASSIGNED TO EXAMINER—
Sep 30, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 27, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance