USPTO serial 79136207
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey H. Greger
Jeffrey H. Greger STUDEBAKER BRACKETT PLLC8255 Greensboro DriveSuite 300Tysons, VA 22102| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [Base metals in the nature of common metals and their alloys; metal building materials, namely, floors, side walls and roof panels for containers and] boxes for hoses, hose layers, hose layer containers, hose boxes and frames, hose ramps and hose bridges, hose recovery units and hose blocks; transportable metal constructions; [non-electrical metal cables and wires of common metals; ironmongery, namely, metal bolts, rivets and screws;] metal pipes and pipe couplings[; metal hardware, namely, nuts, washers and pulleys] | ACTIVE | — |
| 007 | Machinery and machine tools for disaster response, namely, transporting, circulating, removal and supply of water, of foam, and of water and foam; [motors, except for motors for use in vehicles;] circulating pumps, pressure boosting pumps, flood water pumps, water drain pumps, submersible floating water pumps and water suction machines for aspiration installations and aspiration equipment for disaster response; water suction machines for industrial purposes; [machine couplings and transmission components except for land vehicles;] and repair and replacement components in the nature of structural parts for the aforementioned products | ACTIVE | — |
| 009 | [Scientific, nautical, surveying, optical, weighing,] measuring, signalling, control, assistance and safety apparatus and equipment, namely, [automatic electronic capacity pressure control and security apparatus for monitoring engine temperature, speed and oil pressure, hour counters, alternator currents, working and warning lights, for automatic stop function,] electronic control apparatus for pumps as well as electronic water and foam dosage apparatus and mixing apparatus for the purpose of combating fires; life-saving apparatus and systems concerning the transport of water, namely, fire hoses; fire-extinguishing equipment, namely, water and foam cannons; fire hoses and mobile fire-extinguishing systems | ACTIVE | — |
| 017 | Non-metal flexible pipes and hoses | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 5, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Feb 5, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jan 26, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 21, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 21, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 21, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 22, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Sep 22, 2024 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Nov 14, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Nov 10, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 30, 2023 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 11, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 17, 2023 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Mar 11, 2023 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 10, 2023 | INPC | INVALIDATION PROCESSED | — |
| Jan 22, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 22, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| May 22, 2022 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Apr 27, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 22, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Sep 22, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jun 17, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 22, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 22, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 22, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 22, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 7, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 7, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 3, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 17, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 17, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 17, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 30, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 27, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 6, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 7, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 9, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| May 1, 2014 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Apr 25, 2014 | ALIE | ASSIGNED TO LIE | — |
| Apr 17, 2014 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Apr 10, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 7, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 10, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 11, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 11, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 11, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 10, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 4, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 30, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 30, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 27, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |