USPTO serial 79136250
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Brewster Taylor
Brewster Taylor STITES & HARBISON PLLC1800 Diagonal RoadSUITE 325Alexandria, VA 22314| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Non-metallic building materials, namely, plaster, mortar board, cement, timber, lumber, bricks, cement mixes, filling cement, glass bricks, glass panes, glass tiles, safety glass, glass panels, insulated glass, laminated flat glass and modified sheet glass; non-metallic rigid pipes for building; asphalt; pitch; bitumen asphalt; construction and worked timber; bricks; cement mix for building; cement partitions and building components, namely, slabs of cement; non-metallic transportable buildings; non-metallic monuments of stone, concrete, or marble; concrete; concrete building elements, namely, blocks, bricks, posts, slabs and panels; non-metallic exterior roll shuttering for concrete; mortar for building | SECTION 71 - CANCELLED | — |
| 037 | Construction and repair of structures, namely, industrial complexes, works of art, buildings, and factories; construction of maritime and river installations, namely, bridges, abutments, bridge abutments, dikes, embankments, dams, mill ponds, river basins, tidal basins, holding basins and reservoirs; asphalting; rental of construction equipment; construction supervision and management of building site work; construction and repair information; demolition of buildings; masonry; plastering; scaffolding erection and repair | SECTION 71 - CANCELLED | — |
| 042 | Engineering and surveying services; engineering services, namely, carrying out evaluations, appraisals, research work and writing reports in the fields of science and technology; scientific research; industrial research relating to civil and mechanical engineering in the fields of residential construction, construction of bridges, abutments, bridge abutments, stabilized structures on land, mechanical stabilization of land and structures, fills and embankments, retaining walls, dikes, tunnels, dams, mill ponds, river basins, tidal basins, holding basins, reservoirs and silos; chemical laboratories; testing of materials; technical project studies and research relating to civil and mechanical engineering, namely, studies in the fields of residential construction, construction of bridges, abutments, bridge abutments, stabilized structures on land, mechanical stabilization of land and structures, fills and embankments, retaining walls, dikes, tunnels, dams, mill ponds, river basins, tidal basins, holding basins, reservoirs and silos; construction consultation; technical research relating to civil and mechanical engineering in the fields of residential construction, construction of bridges, abutments, bridge abutments, stabilized structures on land, mechanical stabilization of land and structures, fills and embankments, retaining walls, dikes, tunnels, dams, mill ponds, river basins, tidal basins, holding basins, reservoirs and silos | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 12, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Feb 12, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Dec 11, 2025 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Dec 11, 2025 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 25, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 20, 2023 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 24, 2023 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jan 24, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 24, 2023 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Dec 21, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 14, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 10, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 29, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 21, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 11, 2015 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 5, 2015 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 17, 2014 | FINV | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 11, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 11, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 29, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 29, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 13, 2014 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 11, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 11, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 22, 2014 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 22, 2014 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 22, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 7, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 6, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 4, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 4, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 27, 2013 | ALIE | ASSIGNED TO LIE | — |
| Dec 6, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 23, 2013 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 18, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 18, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 18, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 17, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 17, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 12, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 8, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 30, 2013 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Sep 27, 2013 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |