Drawing for MIK

USPTO serial 79136382

MIK

Reviewed by CopyMark Law Group

Reg. 4561932Status 706Registered
Filing date
Status date
Registration date
Jul 8, 2014
Examiner
ROBERTSON, DEIRDRE G
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with MIK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James F. Struthers

James F. Struthers Richard Law Group5910 N Central Expy Ste 325Dallas, TX 75206United States

Goods and services

ClassDescriptionStatusFirst use
006[ Common metals and their alloys, unwrought or semi-wrought; building materials of metal, namely, modular metal animal houses for pigs, calves, sheep and goats, metal floor boards, metal wall boards, metal wall framing, metal partitions, metal components for building foundations, metal cladding, metal latches, metal beams, metal brackets, metal profiles, metal posts, metal fasteners in the nature bolts, nails, rivets and screws, metal threaded fasteners, metal bonding fasteners for mounting and demounting of ceiling, wall and floor panels, metal door frames, metal door panels, metal door fittings and metal drain pipes; girders of metal; joists of metal; transportable buildings of metal; building materials, namely, floor grilles and ground plates of metal; building materials, namely, grates, gates and cages, mainly of metal; ironmongery and small items of metal hardware, namely, metal bolts, clips, nails, rivets, and screws; pipes and tubes of metal ]SECTION 71 - CANCELLED—
011Heat exchangers, not being parts of machines only for use in agricultural engineering; electric heating apparatus and/or heating installations, namely, electric and water-fed heating elements for stable floors only for use in agricultural engineeringACTIVE—
019[ Non-metallic building materials, namely, pre-fabricated and modular non-metal pig, calf, sheep and goat houses; ] plastic and composite building materials, namely, floor boards; [ wall boards, wall framing, partitions, components for building foundations, cladding, beams, posts, door frames, door panels, and drain pipes; ] non-metallic building materials, namely, [ plastic ducts and couplings for organizing and holding floor grates and grills, ] plastic slats for floors; [ building materials, namely, angle irons, not of metal; non-metallic rigid pipes; stones and artificial stones, cement, building lime, grout, plaster and gravel; beams, not of metal; concrete building elements, namely, concrete beams, blocks, bricks, posts, slabs, panels, pipes, drains, ] floors, [ walls and supports; wall claddings, ] not of metal [, for building; windows and window frames, not of metal; asphalt, pitch and bitumen; non-metallic transportable buildings; foundry molds, not of metal; floors, not of metal; ducts, not of metal, for ventilating and air-conditioning installations ]; building materials, namely, grates and floor grilles of plastic, and ground plates of plastic in the nature of building boardsACTIVE—
020[ Plastic building materials, namely, latches, brackets, profiles, door fittings, fasteners in the nature of plastic bolts, clips, nails, rivets, and screws, non-metal mounting brackets, non-metal profiles, plastic tubs being other than bathtubs, valves being other than machine parts, storage drums, packaging containers, fasteners for grates, floor grilles and ground plates, non-metal fasteners in the nature of plastic bolts, clips, nails, rivets, screws, fasteners for holding floor grilles in place, anti-slip boards for holding grates and grilles in place, and wall plaques; plastic storage tanks; packaging containers of plastic; non-metal fastening anchors for grates and floor grilles of plastic as well as building boards of plastic ]SECTION 71 - CANCELLED—
027[ Mats, included in this class, namely, floor mats; ] floor coverings made of [ rubber, ] plastic [ or textile material; wall hangings, not of textile material ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 14, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 14, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 23, 2024INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jun 18, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 27, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 16, 2023NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 16, 202371AGREGISTERED-SEC.71 ACCEPTED—
Oct 13, 2023ES71TEAS SECTION 71 RECEIVED—
Jul 28, 2023RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 8, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jun 5, 2022INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Apr 4, 2022INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 4, 2022INPCINVALIDATION PROCESSED—
Nov 16, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 16, 2021NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Mar 16, 2021C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Feb 2, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 17, 2020ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 8, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 29, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 5, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 5, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 30, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 19, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 19, 2014FIMPFINAL DISPOSITION PROCESSED—
Oct 8, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 8, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 22, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 22, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 18, 2014GPNXNOTIFICATION PROCESSED BY IB—
Apr 2, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 2, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 2, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 14, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 14, 2014ALIEASSIGNED TO LIE—
Feb 27, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 27, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Feb 27, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 27, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 27, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 21, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 20, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 23, 2013RFNTREFUSAL PROCESSED BY IB—
Nov 7, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 7, 2013RFRRREFUSAL PROCESSED BY MPU—
Nov 7, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 6, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 5, 2013DOCKASSIGNED TO EXAMINER—
Oct 15, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 9, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 3, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance