USPTO serial 79137883
HARSCO PLATINUM
Reviewed by CopyMark Law Group
Status 402
- Filing date
- Status date
- Registration date
- —
- Examiner
- FAIRBANKS, RONALD L
- Law office
- LAW OFFICE 117 - EXAMINING ATTORNEY ASSIGNED
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with HARSCO PLATINUM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Formwork, also referred to as auxiliary devices for building purposes, and construction parts therefor of metal or mainly of metal, in particular formwork panels, large-frame formwork, panel formwork, column formwork, circular formwork and wall formwork as well as girders, braces and props; concrete containment vessels of sheet steel; transportable buildings of metal or mainly of metal; scaffolds, working platforms and temporary bridges of metal or mainly of metal; clamps; construction parts of scaffolds, in particular scaffolding boards, scaffolding planks of metal or mainly of metal; bleachers of metal or mainly of metal; small items of metal hardware, ironmongery and forge goods, wire goods, goods of sheet metal; machined and hand-worked shaped metal parts for fastening or connecting purpose, in particular connecting elements, pipes, brackets or cotter pins; steel pipes, sectional iron; goods of common metal not included in other classes | SECTION 70 - CANCELLED | — |
| 019 | Formwork, also referred to as auxiliary devices for buildings purposes, and construction parts therefore not of metal or mainly not of metal, in particular formwork panels, girders, braces and props; concrete containment vessels not of metal, transportable buildings not of metal or mainly not of metal; scaffolds, working platforms and temporary bridges not of metal or mainly not of metal; construction parts for scaffolds, in particular scaffolding boards, scaffolding planks not of metal or mainly not made of metal, railings not of metal or mainly not of metal | SECTION 70 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 10, 2014 | IRRH | IRREGULARITY FROM IB EXAMINED BY MPU | — |
| Jan 29, 2014 | IRRF | IRREGULARITY ON REFUSAL FROM IB | — |
| Jan 8, 2014 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Dec 24, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 24, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 24, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 23, 2013 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Dec 23, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 13, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 12, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 7, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 1, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |