Drawing for ELMOS

USPTO serial 79138011

ELMOS

Reviewed by CopyMark Law Group

Reg. 4961904Status 706Renewal
Filing date
Status date
Registration date
May 24, 2016
Examiner
WILSON, MARYNELLE WEST
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with ELMOS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $3,400

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James F. Struthers

James F. Struthers Richard Law Group5910 N Central Expy Ste 325Dallas, TX 75206United States

Goods and services

ClassDescriptionStatusFirst use
009Semiconductors; integrated circuits; integrated circuit chips; electronic circuits; electric, electronic and optoelectronic components and units, namely, printed circuits, semiconductor components, namely, semiconductor [ memories, semiconductor memory units, semiconductor ] devices and semiconductor power elements, [ resistors, capacitors, coils, filters, transistors, diodes, photographic semiconductors, photo resistors, transformers, relays, magnetic switches, fuses, earth leakage circuit breakers, electric contacts, electricity timer switch clocks, micro-processors, microcontrollers, ] transceivers, [ actuators, ] sensors for the acquisition of temperature, length, distance, filling level, flow rate, weight, frequency, sound, pressure, [ acceleration, velocity, inertia, revolution speed, brightness, light entrance angle, motion, tremors, gas, smoke, current, voltage, resistance, capacitance, induction, magnetic fields, ] and measuring and signal sensors for the acquisition of temperature, length, distance, filling level, flow rate, [ weight, ] frequency, sound, pressure, [ acceleration, velocity, inertia, revolution speed, ] brightness, light entrance angle, [ motion, tremors, ] gas, smoke, current, voltage, resistance, capacitance, [ induction, magnetic fields ]; electric, electronic and optoelectronic micro systems, consisting of sensors, and evaluation electronics and housings, namely, electronic circuits and sensors and casings for the acquisition of temperature, length, distance, filling level, flow rate, weight, frequency, sound, pressure, [ acceleration, velocity, inertia, revolution speed, ] brightness, light entrance angle, [ motion, tremors, ] gas, smoke, current, voltage, resistance, capacitance, [ induction or magnetic fields, ] and for the evaluation and processing of data acquired by electronic sensors; transmitters and receivers for electronic signals; [ signal converters; interfaces being interface cards and ] interface semiconductors for data transmission and data processing; [ interface computer programs for data transmission and data processing; ] boards being integrated circuit cards, namely, evaluation boards and demonstration boards; [ apparatus and instruments for weak-current engineering for measurement engineering, namely, measuring apparatus and instruments in the nature of electronic monitors and monitor modules for monitoring electrical signals for the measuring of temperature, length, distance, filling level, flow rate, weight, frequency, sound, pressure, acceleration, velocity, inertia, revolution speed, brightness, light entrance angle, motion, tremors, gas, smoke, current, voltage, resistance, capacitance, induction or magnetic fields; apparatus and instruments for weak-current engineering, namely, for control engineering, namely, electronic control systems for machines, semiconductors, and electric motors; ] programmable microcontrollers; controls for electric motors; [ apparatus and instruments for weak-current engineering, namely, apparatus and equipment for the transmission and processing of audio signals, electrical signals and optical signals, namely, electrical signal attenuators and signal processors; apparatus and instruments for the conducting, distribution, transforming, storing, regulating and control of electric current; pre-recorded electronic data carriers featuring software for running and monitoring the performance of semiconductors, integrated circuits, integrated circuit chips, electronic circuits, and electronic and opto-electronic components based on semiconductor technology; apparatus and equipment for data transmission, namely, electronic units used in data transmission networks, namely, interfaces, couplers and transceivers, including installations consisting thereof; ] software for running and monitoring the performance of electronic and opto-electronic components and units based on semiconductor technology; firmware for running and monitoring the performance of semiconductors, integrated circuits, integrated circuit chips, electronic circuits, and electronic and opto-electronic components based on semiconductor technology. downloadable electronic publications, namely, product specifications, user manuals and user guides relating to semiconductors, integrated circuits, integrated circuit chips, electronic circuits, and electronic and opto-electronic components based on semiconductor technologyACTIVE—
016Printed matter, namely, brochures, magazines, [ newspapers, books, ] product specification sheets, advertising material for the use of electric and electronic apparatus and equipment and parts thereof and of electric and electronic components and units and software, namely, semiconductors, integrated circuits, printed circuit boards, and electric, electronic and optoelectronic parts, components, units and software for automotive, industrial and consumer electronics applications; printed product specifications, user manuals, user guides and other written instructional manuals for the use of electric or electronic apparatus and equipment and/or of parts thereof and/or of electric or electronic components or units and/or of software; printed instructional and teaching material, except apparatus, for the use of electric and electronic apparatus and equipment and parts thereof and of electric and electronic components and units and of software, namely, semiconductors, integrated circuits, printed circuit boards, and electric, electronic and optoelectronic parts, components, units and software for automotive, industrial and consumer electronics applicationsACTIVE—
040Assembly of semiconductors for others; custom manufacture of electric and electronic articles, namely, integrated circuits, microcontrollers, printed circuit boards, electronic circuits, [ computer memories, computer interface cards, ] transceivers, signal transmitters and receivers and sensors for othersACTIVE—
042Scientific and technological services and research and design relating thereto, namely, research and design in the field of semiconductors and microelectronics; research and development services for others relating to new products; industrial analysis and research services in the field of semiconductors and microelectronics; technical research services in the field of semiconductors and microelectronics; providing of technical project analysis, namely, conducting feasibility studies in the field of microelectronics; services of technical measurement, namely, technical measurement of the functionality of electric, electronic and optoelectronic components and units; material testing; design and development of electric, electronic and optoelectronic components and units, including of electronic circuits and integrated circuits; computer programming and design and development of computer software for process control; [ rental of data processing programs; rental of computer hardware; rental of computer software; ] software as a service (SaaS), namely, providing temporary use of non-downloadable software for the testing, evaluation and simulation of the operation of electric, electronic and optoelectronic components and units, including of electronic circuits and integrated circuits; [ computer project management services in the field of electronic data processing; ] technical consultancy services for others in the field of electric, electronic and optoelectronic components and units in the field of electronic circuits and integrated circuits; engineering services in the field of electronics and electrical engineering; technical data analysis services in the field of semiconductors and microelectronics; construction drafting. technical project studies, namely, conducting feasibility studies in the fields of semiconductors and microelectronicsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 8, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 8, 202671AGREGISTERED-SEC.71 ACCEPTED—
May 18, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 30, 2026ES71TEAS SECTION 71 RECEIVED—
Nov 27, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 14, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 14, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 24, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Apr 22, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 22, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 27, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 22, 2023CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Nov 26, 2023CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 19, 2023CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Sep 19, 2023CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Sep 3, 2023CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 3, 2023CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 3, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 25, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 25, 2023INPCINVALIDATION PROCESSED—
May 1, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 7, 2023RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 31, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Aug 31, 202271AGREGISTERED-SEC.71 ACCEPTED—
Aug 30, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 31, 2022ES71TEAS SECTION 71 RECEIVED—
May 24, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 11, 2020ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Apr 29, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 5, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 14, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 26, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 26, 2016XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Aug 26, 2016XXCRGENERIC MADRID TRANSACTION CREATED—
Aug 24, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 24, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 8, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 8, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 4, 2016GPNXNOTIFICATION PROCESSED BY IB—
Feb 17, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 17, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 17, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 3, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 29, 2016EXPTEXPARTE APPEAL TERMINATED—
Jan 29, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 22, 2016ALIEASSIGNED TO LIE—
Jan 11, 2016ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 11, 2016EXPIEX PARTE APPEAL-INSTITUTED—
Jan 11, 2016JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jan 11, 2016EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Oct 27, 2015CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Oct 9, 2015CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 15, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 15, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 15, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 23, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 22, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 22, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 28, 2014GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 28, 2014GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 28, 2014CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 9, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 9, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 9, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 15, 2014CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jul 12, 2014CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jun 9, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 22, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 22, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 15, 2013RFNTREFUSAL PROCESSED BY IB—
Nov 22, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 22, 2013RFRRREFUSAL PROCESSED BY MPU—
Nov 22, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 21, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 12, 2013DOCKASSIGNED TO EXAMINER—
Nov 12, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 11, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance