USPTO serial 79138520
ALUK
Reviewed by CopyMark Law Group
Reg. 4642956Status 707Registered
- Filing date
- Status date
- Registration date
- Nov 25, 2014
- Examiner
- MEYERS, MORGAN LAURA
- Law office
- POST REGISTRATION
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with ALUK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey H. Handelsman
Jeffrey H. Handelsman Greenblum & Bernstein, P.L.C.1950 Roland Clarke PlaceReston, VA 20191-1411United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Common metals and alloys thereof; ] [ metal building materials, namely, soffits; ] [ metallic materials for railway tracks; non-electric cables and wires of metal; ] [ metal pipes, safes, and ores; ] [ steel sheets; ] [ unwrought or semi-wrought steel; ] [ metal reinforcing materials for building; frames of metal for building; gutters of metal; metal door casings; ] [ tiles of metal for building; ] [ framework of metal for building; ] [ metal roof coverings; floor tiles, of metal; metal stair treads and steps; ] [ window stops of metal; metal door stops; metal chests; ] metal window frames; [ metal door frames; ] window frames of metal; [ door frames of metal; metal greenhouse frames; ] metal fittings for doors; door handles of metal; door rollers of metal; [ windows of metal; ] doors of metal [; fences of metal; metal columns being parts of constructions; fittings of metal for building; ] [ ceilings of metal; tiles of metal; transportable buildings of metal; ] [ metal porches; ] [ wall linings for buildings made of metal; ] [ gates of metal; ] [ transport pallets of metal; bins of metal; empty tool boxes made of metal; ] [ metal profile sections, namely, skirting boards and metal moldings; ] [ lintels of metal; ] [ metal window handles; rods of metal; jambs of metal; rod rings of metal; industrial doors of metal; seals for doors and windows of metal; shutters of metal; partitions of metal for building ] | ACTIVE | — |
| 017 | [ Plastics in extruded form for use in manufacture; sealing, packing and insulating material; ] rings of rubber [; reinforcing materials, not of metal, for pipes; ] [ water-tight rings; ] [ insulating tapes, insulating ribbons; ] [ insulators for cables; synthetic rubber; liquid rubber; ] [ clack valves of rubber for doors and windows; ] [ pipe gaskets; insulators for electric mains; ropes of rubber, cords of rubber; ] [ cylinder jointing; ] [ bark coverings for sound insulation; packing materials of rubber or cushioning or stuffing; insulating plaster; foils of metal for insulating; anti-dazzle and tinted films for windows; ] [ insulating felt for ] [ ceilings, ] [ doors and windows; ] [ asbestos felt; ] [ fiberglass for insulation ] [ ; plastic fibers for non-textile use; filtering materials made of semi-processed foams or plastics; insulating oils; insulating fabrics; fiberglass fabrics for insulation; insulating varnish ] | ACTIVE | — |
| 019 | [ Building materials, not of metal, namely, non-metallic rigid pipes for building; asphalt, pitch and bitumen; ] [ non-metallic transportable buildings; ] [ monuments, not of metal; ] [ door casings, not of metal; reinforcing materials not of metal for building; folding doors, not of metal; ] [ lumber; veneer wood; sawn timber; building timber; manufactured timber; wood, semi-worked; moldable wood; wood paneling; bricks; ] [ window frames not of metal; door frames, not of metal; window cases not of metal; door cases, not of metal; windows not of metal; wall claddings for building not of metal; building panels not of metal; ] [ wall linings for building not of metal; ] [ gates not of metal; shutters, not of metal; non-metal profile sections, in particular non-metal skirting boards and moldings; ] [ lintels, not of metal; ] [ window handles, not of metal; ] [ jambs not of metal; non-metal industrial doors; partitions, not of metal ] | SECTION 71 - CANCELLED | — |
| 020 | [ Furniture, mirrors, picture frames; curtain rings; sun screens and indoor sun blinds; curtain rails; curtain rods; curtain hooks; curtain tie-backs in the nature of non-textile curtain holders, bamboo curtains; bead curtains for decoration; curtain rollers; pegs, not of metal; ] door handles, not of metal [; screws, not of metal * ; window handles, not of metal *] | ACTIVE | — |
| 035 | [ Advertising; business management; ] [ business administration; office functions; ] [ market research and studies; ] business management assistance in the field of joinery and building; business management and organization consultancy in the field of joinery and building; [ business efficiency expert reports in the field of joinery and building; commercial and industrial management assistance; administrative processing of purchase orders; ] [ procurement services for others, namely, the purchasing of goods and services for other businesses; accounting; invoicing; ] [ organization of exhibitions for commercial or advertising purposes; ] administrative management of companies active in the field of joinery and building | ACTIVE | — |
| 037 | Construction of window, doors, gates, frames, [ wall tiles, floor tiles, ] facades, glass roofs, conservatories, railings, fences, walls and shutters and parts thereof; repair of windows, doors, gates, frames, wall tiles, floor tiles, facades, glass roofs, conservatories, railings, fences, walls and shutters; installation of windows, doors, gates, frames, wall tiles, floor tiles, facades, glass roofs, conservatories, railings, fences, walls and shutters; [ carpentry services; cabinet repair; ] [ window cleaning; ] construction and repair information; [ building insulation installation services; maintenance and restoration of furniture; sanding of floors and facades; ] facade repair and maintenance | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by AluK S.A.
- Other trademarks owned by VALFIDUS BUILDING SYSTEMS S.A.
- Other trademarks owned by VALFIDUS BUILDING SYSTEMS S.A.
- Other trademarks in Class 006
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 020
- Other trademarks in Class 035
- Other trademarks in Class 037
- Similar marks named ALUK
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 31, 2026 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Aug 16, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 8, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 21, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 16, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Dec 16, 2025 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Dec 8, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Dec 8, 2025 | PUMI | PROOF OF USE INTERIM ACTION ISSUED | — |
| Nov 20, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| May 21, 2025 | PUM1 | OFFICE ACTION ISSUED POU1 | — |
| May 21, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 5, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Nov 25, 2023 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jun 23, 2023 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Nov 4, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 26, 2022 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 24, 2022 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Aug 23, 2022 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Jul 12, 2022 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 12, 2021 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 12, 2021 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Nov 3, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 24, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Nov 25, 2019 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Feb 7, 2019 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 31, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 31, 2018 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| May 31, 2018 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| May 11, 2018 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 22, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 20, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 20, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 25, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 26, 2014 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Nov 25, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 9, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 9, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 20, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 1, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 1, 2014 | ALIE | ASSIGNED TO LIE | — |
| Jul 23, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 17, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 16, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 16, 2014 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 16, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 8, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 8, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 8, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 30, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 29, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 29, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 6, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 17, 2013 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 17, 2013 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 16, 2013 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 15, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 20, 2013 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 16, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 16, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 14, 2013 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |