Drawing for WINTER

USPTO serial 79138830

WINTER

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
KENEALY, NATALIE LANGFORD
Law office
TTAB

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WINTER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Julie B. Seyler

Julie B. Seyler Abelman Frayne & Schwab666 Third AvenueNew York, NY 10017UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007pumps and pumping apparatus, namely, AC variable frequency drives that are used to control small and medium-sized motors in applications such as manufacturing processes, Aerating pumps for aquaria, Air distribution units for pneumatically driven pumps, Aquarium pumps, Axial flow pumps, Beer pumps, Bilge pumps, Biodiesel-generation machines, namely, mixing equipment in the nature of pumps, Centrifugal pumps, Circulating pumps, Electric pumps, Electric pumps for swimming pool and aquarium, Electrical water pumps for swimming pools, spas, baths, and whirlpools, Fluid power component kit for machine control comprising pumps and valves, Fuel pumps for land vehicles, Fuel pumps for service stations, Water pumps for spas, baths, whirlpools, swimming pools, water filtering units, Water pumps for land vehicles, Water pumps for use in motors and engines, Water treatment equipment, namely, pumps for use in irrigation systems, Rotary pumps, Screw pumps, Sewage pumps, Shaft bearings for vacuum pumps, Shafts for pumps, Silt pumps, Sludge pumps, Spray paint systems comprised of pumps, pump controllers, nozzles, tubing and valves, Submersible pumps, Suction pumps, Sump pumps, Positive displacement pumps, Pump control valves, Pump diaphragms, Pump impellers, Pumps for the beverage industry, Pumps and compressors as parts of machines, motors and engines, Pumps as parts of machines, motors and engines, Pumps for cooling engines, Pumps for machines, High-pressure pumps for use in oil or gas well hydraulic fracturing operations, High-pressure pumps for washing appliances and installations, Hydraulic pumps, Hydraulic pumps and motors for hydrostatic systems, comprised of pumps, motors, valves, switches, sensors and electronic controls, for hydraulic drives and force transmission in machines, machine tools, grinding and food processing machines and in off-road-vehicles, Lubricating pumps, Macerator pumps, Motors and pumps for refrigerators and freezers, Multi-phase screw pumps, Oil drain pumps, Oil pumps for land vehicles, Oil pumps for use in motors and enginesSECTION 70 - CANCELLED—
009Electric and electronic apparatus and equipment for transmission and distribution of electric energy, namely, electrical power distribution boxes, panels, and electricity distribution consoles, electrical wires and transmitters of electrical signals, control systems for machines as well as systems comprising these components; electronic data processing equipment, namely, couplers; computer programs for data processing; electric cables and lines; electronic bus systems, namely, USB hardware, host bus adapters; magnets, transformers, electric switches, residual current apparatus, namely, circuit breakers; automatic cut out, namely, circuit breakers; electric switches, namely, motor protecting switches, fusible cut-outs; low tension condensers, electric installation distributors in the nature of power distributing boxes, electric meter cabinets in the nature of cabinets specifically adapted for electric meters, electric energy consumption meters, electronic control gears for light control device, electric control panels, control cabinets, namely, cabinets specifically adapted for electric control panels, semiconductor switching devices, electric switching devices and switching stations as well as devices comprising these components for high-voltage and medium voltage, electric gate operator, namely, sliding lock gates, electric relays, electric pressure switches, electric connectors and electrical outlets, electric bushings comprised of electric socket, electric outlet and electric plug, electric measuring equipment, namely, laser measuring system, control and protection devices for electrical networks, namely, electric controllersSECTION 70 - CANCELLED—
042Engineering services in the field of pumps and pumping apparatus; technical consulting services, namely, drawing up of expert technical opinions in the field of pumps and pumping apparatusSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 10, 2016OP.TOPPOSITION TERMINATED NO. 999999—
May 10, 2016OP.SOPPOSITION SUSTAINED NO. 999999—
May 6, 2016DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
May 5, 2016DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 10, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 10, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 1, 2015RFNPREFUSAL PROCESSED BY IB—
May 8, 2015OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 1, 2015OP.IOPPOSITION INSTITUTED NO. 999999—
Apr 30, 2015OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
Apr 30, 2015OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
Apr 29, 2015OPPFOPPOSITION PAPERS RECEIVED AT TTAB—
Apr 28, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 24, 2015GPNXNOTIFICATION PROCESSED BY IB—
Apr 22, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 22, 2015OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 18, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 8, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 8, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 8, 2015NPUBNOTICE OF PUBLICATION—
Mar 25, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 24, 2015ALIEASSIGNED TO LIE—
Mar 5, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 3, 2015LOPRLETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN—
Feb 27, 2015LOPTLETTER OF PROTEST EVIDENCE FORWARDED—
Feb 9, 2015CNEAEXAMINERS AMENDMENT MAILED—
Feb 9, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Feb 9, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 30, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 2, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 2, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 2, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2014ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2014REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 1, 2014CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 3, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 2, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 2, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 25, 2013RFNTREFUSAL PROCESSED BY IB—
Dec 2, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 2, 2013RFRRREFUSAL PROCESSED BY MPU—
Nov 28, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 27, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 27, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 26, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 22, 2013DOCKASSIGNED TO EXAMINER—
Nov 22, 2013DOCKASSIGNED TO EXAMINER—
Nov 22, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 21, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance