Drawing for Serial No. 79139094

USPTO serial 79139094

Serial No. 79139094

Reviewed by CopyMark Law Group

Reg. 4586565Status 404
Filing date
Status date
Registration date
Aug 19, 2014
Examiner
BUTLER, MIDGE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79139094?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
001Moderating materials for nuclear reactors; fissionable material for nuclear energy; alkaline metals; soldering chemicals; sulphides; chemicals used in the annealing of metals; fissionable chemical elements; fireproofing preparations; industrial chemicals; chemical preparations for scientific purposes, other than for medical or veterinary useSECTION 71 - CANCELLED—
004Electrical energy; nuclear fusion energy; coal; wax; candles; dust binding compositions for sweepingSECTION 71 - CANCELLED—
006Alloys of common metal; pipes of metal; building materials of metal, namely, soffits, fascia, ceiling boards and floorboards; ropes of metal; clips of metal for cables and pipes; Metal hardware, namely, washers; handling pallets of metal; storage tanks of metal; signboards of metal; rods of metal for weldingSECTION 71 - CANCELLED—
009nuclear power station control system consisting primarily of electrical switches and controllers; power stations, namely, electronic docking stations, computer docking stations; automation equipment, namely, computers, industrial automation controls; electric control panels; measuring instruments, namely, gasometers, radiation-measuring instruments; wires and cables for electricity mains; carbon materials, namely, battery electrodes; electricity distribution consoles; high voltage explosion protection device, namely circuit overload protector device; protection devices for personal use against accidents, namely, protective glasses, protective work glovesSECTION 71 - CANCELLED—
011Processing installations for fuel and nuclear moderating material namely, distillers, heat exchangers, steamers; Heated polymerisation installations for industrial chemicals; nuclear reactorsSECTION 71 - CANCELLED—
016Printed matter, namely, printed calendars, printed forms; printed publications, namely, pamphlets featuring information on nuclear power; magazines periodicals featuring computers, travel; office requisites, except furniture, namely, adhesive tape dispensers, rubber bands, staplers; stationery; paper; posters; prospectuses featuring computers, travel; document laminators for office use; clips for offices namely, paper clips, binder clipsSECTION 71 - CANCELLED—
019Concrete building elements, namely, concrete walls, concrete slabs; tiles, not of metal; refractory construction materials, not of metal; bitumen; building glass; gypsum; cement; Safety glass for building purposeSECTION 71 - CANCELLED—
035Advertising; marketing studies; organization of technical exhibitions for business and promotional purposes; organization of trade fairs for commercial or advertising purposes; import-export agencies; computerized file management; systemization of information into computer databases; commercial administration of the licensing of the goods and services of others; procurement services for others, namely, purchasing weapons, office furniture for others; personnel recruitmentSECTION 71 - CANCELLED—
037Building construction supervision; building construction; furnace installation and repair; burner maintenance and repair; machinery installation, maintenance and repair; electric appliance installation and repair; air conditioning apparatus installation and repair; lighting equipment installation and repair; motor vehicle maintenance and repair; rustproofingSECTION 71 - CANCELLED—
039Electricity distribution; distribution of energy; vehicle rental; physical storage of electronically-stored data or documents; arranging of travel tours; parcel delivery; marine transport; freighting; water distribution; packaging of goodsSECTION 71 - CANCELLED—
040Production of energy; material treatment information; metal treating; woodworking; paper finishing; optical glass grinding; firing pottery; photographic printing; decontamination of hazardous materials; air purificationSECTION 71 - CANCELLED—
041Instruction services in the field of music, art, automotive repair; arranging and conducting of educational congresses; arranging and conducting of symposiums in the field of nuclear power; lending libraries; publication of electronic books and journals on-line; production of shows operas, television shows, plays; club services, namely, nightclubs, fan clubs, dance clubs; health club services, namely, providing physical fitness training; arranging and conducting of seminars in the field of nuclear power; arranging and conducting of colloquiums in the field of nuclear powerSECTION 71 - CANCELLED—
042Technical research in the field of aeronautics; engineering; quality inspection in the field of product quality control, geological mining; chemical analysis; material testing; mechanical research; packaging design; development of construction projects, namely, construction drafting; computer programmingSECTION 71 - CANCELLED—
045Licensing of intellectual property; intellectual property watching services; inspection of factories for safety purposes; monitoring of burglar and security alarms; security consultancySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 6, 2024DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jan 6, 2024DETHDEATH OF INTERNATIONAL REGISTRATION—
Apr 17, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 19, 2022XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 19, 2022XXCRGENERIC MADRID TRANSACTION CREATED—
Nov 5, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 5, 2021C71TCANCELLED SECTION 71—
Oct 9, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 19, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 12, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 21, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 21, 2014FIMPFINAL DISPOSITION PROCESSED—
Nov 19, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 19, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 3, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 3, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 30, 2014GPNXNOTIFICATION PROCESSED BY IB—
May 14, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 14, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 14, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 26, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 26, 2014ALIEASSIGNED TO LIE—
Apr 7, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 4, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 4, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 4, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 4, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 31, 2013RFNTREFUSAL PROCESSED BY IB—
Dec 6, 2013RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 6, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 5, 2013RFRRREFUSAL PROCESSED BY MPU—
Dec 5, 2013RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 4, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 2, 2013DOCKASSIGNED TO EXAMINER—
Dec 2, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 28, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance