Drawing for ISOMAT BUILDING QUALITY

USPTO serial 79139988

ISOMAT BUILDING QUALITY

Reviewed by CopyMark Law Group

Reg. 4615634Status 709
Filing date
Status date
Registration date
Oct 7, 2014
Examiner
BUTLER, MIDGE
Law office
—

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ISOMAT BUILDING QUALITY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeannine A Rittenhouse

Jeannine A Rittenhouse IPHORGAN LTD.STE 125195 ARLINGTON HEIGHTS RDBUFFALO GROVE, IL 60089

Goods and services

ClassDescriptionStatusFirst use
001[ Chemicals used in industry, science and photography, as well as in agriculture, horticulture and forestry; unprocessed artificial resins, unprocessed plastics; natural or chemical manures; fire extinguishing compositions; tempering and soldering preparations; chemical substances for preserving foodstuffs; adhesives used in industry ]SECTION 71 - CANCELLED—
002Paints, varnishes, [ lacquers, Coatings and impregnations that protect wooden surfaces against insects and pests or protect metal surfaces against rust, colorants; raw natural resins; metals in foil and powder form for painters, decorators, printers and artists ]SECTION 71 - CANCELLED—
017[ Rubber, gutta-percha, gum, asbestos; plastics in extruded from for use in manufacture; packing and insulating materials; ] stopping materials, namely, joint sealants, water-stops, materials for plugging and sealing of water leaks, [ membranes for waterproofing and sealing, injection resins; flexible pipes, not of metal ]SECTION 71 - CANCELLED—
019Non-metallic building materials, namely, dry-mix mortars made by cement, [ lime, cement-lime, gypsum, soda, ] fillers [ and other mineral substances; non-metallic rigid pipes for buildings; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 6, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 6, 2026C71TCANCELLED SECTION 71—
Oct 12, 2023RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 7, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Nov 8, 2021INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Sep 30, 2021XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Sep 30, 2021XXCRGENERIC MADRID TRANSACTION CREATED—
Sep 15, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 15, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jan 15, 202171.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Jan 15, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 12, 2020ES71TEAS SECTION 71 RECEIVED—
Oct 7, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 6, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 19, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 19, 2015FIMPFINAL DISPOSITION PROCESSED—
Jan 7, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 7, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 22, 2014GPNXNOTIFICATION PROCESSED BY IB—
Jul 22, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 22, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 2, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 2, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 2, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 18, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 16, 2014ALIEASSIGNED TO LIE—
Jun 2, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 28, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 28, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 28, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 1, 2014RFNPREFUSAL PROCESSED BY IB—
Feb 7, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 7, 2014RFRRREFUSAL PROCESSED BY MPU—
Feb 7, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 6, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2014DOCKASSIGNED TO EXAMINER—
Dec 27, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 23, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 19, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance