Drawing for EVERY JOB A NEW THRILL

USPTO serial 79140196

EVERY JOB A NEW THRILL

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
FIONDA, LAURA ELIZABETH
Law office
TMEG LAW OFFICE 108 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EVERY JOB A NEW THRILL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines and machine tools; lift operating apparatusSECTION 70 - CANCELLED—
009Scientific, nautical, surveying, electric, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; electric apparatus for commutation; switchboards, distribution consoles, control panels (electricity); printed circuits, integrated circuits, commutators, circuit cut-out switches; electric and electronic control devices (not included in other classes) for machines, motors and engines, vehicles; electric distribution boxes and distribution boards; telerupters; remote control apparatus; electric installations for the implementation of industrial operations; electric regulating apparatus; apparatus and instruments for physicsSECTION 70 - CANCELLED—
037Installation, maintenance, dismantling and reassembly of machines, in particular paper machines, ventilation apparatus and vacuum installations, winders, mangles, size presses, round wood sorting plants, conveyor installations, sorting installations and of tubular turbines, central lubricating installations, containers, pipeline networks, electric machines and installations, buildings, environmental technology installations, lifts, irrigation installations, steam boilers, electric apparatus, heating apparatus, air-conditioning apparatus, refrigerating apparatus and furnaces and monitoring thereof and monitoring the manufacture of the aforesaid machines, installations, buildings and goods; building construction supervision; car and aeroplane maintenanceSECTION 70 - CANCELLED—
042Design of machines and technical installations; engineering drawing with regard to making calculations in connection with machines and technical installations, and control, measuring and checking (supervision) devices for the aforesaid machines and installations; design of paper machines, ventilating and vacuum installations, winders, mangles, size presses, round wood sorting plants, conveyor installations, sorting installations, tubular turbines, pipelines, containers, central lubrication installations, lifts, irrigation installations, boilers, electric apparatus, heating apparatus, air conditioning installations, refrigerating apparatus and furnacesSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 30, 2024DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jan 29, 2024DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 2, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 28, 2015FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 12, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 12, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 7, 2015OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 20, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 20, 2015OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 13, 2014MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 12, 2014ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Feb 2, 2014RFNTREFUSAL PROCESSED BY IB—
Jan 13, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 13, 2014RFRRREFUSAL PROCESSED BY MPU—
Jan 1, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 31, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 27, 2013MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 23, 2013DOCKASSIGNED TO EXAMINER—
Dec 23, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 19, 2013REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance