USPTO serial 79140760
CONTROLPLEX
Reviewed by CopyMark Law Group
Reg. 4820109Status 706Registered
- Filing date
- Status date
- Registration date
- Sep 29, 2015
- Examiner
- HELLMAN, ELI J
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with CONTROLPLEX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ralph E. Locher
Ralph E. Locher Lerner Greenberg Stemer LLPPO Box 2480Hollywood, FL 33022United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Driving motors other than for land vehicles; Incubators for eggs; Automatic vending machines * ; all aforementioned goods except couplings and parts of couplings * ] | SECTION 71 - CANCELLED | — |
| 009 | Scientific, nautical, surveying, weighing, measuring, signalling, supervisory, apparatus and instruments, namely, electrical protection devices, namely, electronic and mechanical protection relays and switchgears for electrically measurable physical dimensions, namely, current, voltage, temperature, frequency, pressure, resistance, power, energy; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical power distribution and control units, electronic circuits, microcircuits, circuit boards, circuit breakers, miniature circuit breaker (MCBs), [ residual current circuit breakers (RCDs), ] residual current operated circuit breakers with overcurrent protection (RCBOs), [ molded-case circuit breakers (MCCBs), ] remote-controlled circuit breakers, [ arc fault detection and protection devices for AC and DC distribution and generation networks, namely, arc fault circuit breakers (AFCBs), arc fault circuit interrupters (AFCIs), arc fault monitors (AFMs), arc fault sensors and arc fault detection algorithms for installation in conventional and renewable energy grids operated by AC or DC including smart grid applications; ] data processors, computers; computer software for configuring, programming and controlling power distribution in industrial areas or telecommunication and data centers; computer software for parameterising, control and data logging of load circuits; computer software for preventing fires by arc fault detection in electrical systems, and data processing centers; software for overcurrent and shortcircuit detection in automatic circuit breakers and smart power relays; electrical and electronic apparatus and instruments and parts thereof, namely, circuit breakers for equipment protection, flow-rate meters and current monitors, and electric sensors; electrical and electronic switching, protecting, controlling and measuring devices, namely, electric cut-off switches, disconnectors in the nature of cut-out switches, voltage surge protectors, electric control panels, ohmmeters, electric microcontrollers, modules for BUS-coupling; remote-controlled electric switches, namely, automatically operated switches, electrically remote-controlled manually operated switches, electrically remote-controlled rocker switches, electrically remote-controlled toggle switches, electrically remote-controlled push button switches, and electrically remote-controlled circuit breakers; electric relays; electronic switching devices, namely, electronic and mechanical switching relays; switching amplifiers; electronic, mechatronics-based overcurrent protection devices, namely, surge protectors, circuit breakers, automatic circuit breakers, electronic circuits; overcurrent circuit breakers; residual current circuit breakers; thermal, thermal-magnetic, magnetic and magnetic-hydraulic circuit breakers for equipment protection; electric circuit breakers and start-up power switches with thermal and/or electromagnetic triggering; electrical and electronic circuit breakers for land vehicles, aircraft and watercraft; electrical and electronic circuit breakers for motor vehicles, airplanes and ships; [ motor protection circuit breakers; ] power circuit breakers; electric overcurrent switches; automatic cut-out switches; automatic electrical switches for installation; high-current electric switches; overvoltage cut-out switches; temperature switches; indicator lamp switches; remote controlled power switches; power disconnectors, namely, trip units for circuit breakers and cut-out switches; circuit fuses for motor vehicles, telephone and telegraph systems; systems for the distribution of electrical energy comprised of electrical distribution boxes, electrical power distribution units, power transformers, uninterruptible power supplies, and electrical conductors for transformers; devices for the distribution of electrical energy, namely, electrical distribution boxes, electrical power distribution units, power transformers, uninterruptible power supplies, and electrical conductors for transformers; electric voltage regulators; integrated circuits, integrated semiconductor circuits and thick film hybrid circuits; electrical and electronic monitoring equipment, namely, electrometers, digital and analog multimeters; current monitors; voltage monitors; [ flow measuring devices in the nature of flow meters for gaseous, liquid and solid media; ] voltmeters electric; electric and electronic controls for machines, engines or motors | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ellenberger & Poensgen GmbH
- Other trademarks owned by Ellenberger & Poensgen GmbH
- Other trademarks owned by Ellenberger & Poensgen GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Similar marks named CONTROLPLEX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 16, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 16, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 16, 2025 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 8, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 6, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Sep 29, 2024 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| May 18, 2023 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Apr 18, 2023 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 24, 2023 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 24, 2023 | INPC | INVALIDATION PROCESSED | — |
| Jan 5, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 5, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| May 5, 2022 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Apr 27, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 24, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Feb 26, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 29, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 10, 2017 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Oct 8, 2017 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 8, 2017 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Feb 8, 2017 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Feb 8, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 23, 2016 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 22, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 30, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 30, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 29, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 29, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 21, 2015 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Jun 20, 2015 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 3, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 3, 2015 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 8, 2015 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Apr 7, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 7, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 3, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 18, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 18, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 18, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 27, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 26, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 26, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 26, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 26, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 8, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 8, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 8, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 30, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 30, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 23, 2014 | ALIE | ASSIGNED TO LIE | — |
| Jul 17, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 12, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 22, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 22, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 18, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 17, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 7, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 7, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 2, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |